Okaloosa County BOCC — May 17, 2016 — Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request

Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request in the May 17, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the May 17, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1330). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used April 5, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
May 17, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
1
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 1.9 KB · 1

Download ↓

Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 88.1 KB · 1

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: May 17, 2016 TO: Honorable Chairman and Members of the Board FROM: Jason Autrey SUBJECT: Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) DEPARTMENT: Public Works BCC DISTRICT: 4 STATEMENT OF ISSUE: Due to additional time that was required in preparing the RFB and bidding out the Gap Creek 319 project, the parent contract and task order needs to be extended to allow for final invoicing by the design consultant. BACKGROUND: Task Order 65 with HDR Engineering, Inc. (Contract #C06-1346-PW) was extended in 2013 with an end date of March 31, 2015. Due to grant requirements and the time needed to prepare and bid out the project, additional time is requested to allow for final invoicing which will extend the current contract and task order end date to September 30, 2016. This request is for additional time only and does not increase the original Not-To-Exceed amount of $125,133.27. Approval of this request amends the contract termination date by providing an additional extension and will reflect the specific task order (TO 65) requiring the additional time. Task Order 65 will be completed as written and paid at the rates so established under the parent contract from which the task order was written. No new work will be assigned under the task order and the parent contract will expire when work under the assigned task order is completed. OPTIONS: Approve/Disapprove the extension of Contract C06-1346-PW, Task Order 65 to September 30, 2016 for Design and Engineering Services. RECOMMENDATIONS: Approve the extension of Contract C06-1346-PW, Task Order 65 to September 30, 2016 for Design and Engineering Services. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — May 17, 2016 — Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request.” May 17, 2016. Action Item Printout. Crypt of Echoes evidence ID LED-2026-6827200dd943417f9459f755b0f5e63a. http://127.0.0.1:58097/evidence/LED-2026-6827200dd943417f9459f755b0f5e63a. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Gap Creek 319 Grant Task Order Extension (C06-1346-PW, TO 65) — agenda request, meeting materials for May 17, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=19306&MeetingID=1330

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓