READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — November 5, 2013 — Eglin Wastewater Treatment Contract -Fifth Modification — reading text

Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 119-Eglin Wastewater Treatment Contract -Fifth Modification.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

reasonable mission delays (not to exceed 6 work days per month, Monday through Friday) are built in to the schedule. - A 460V true 3-phase power supply service, water service, and copper phone line will be made available to the lift station sites by 96CEG upon coordination by OCWS. Once in operation, OCWS assumes responsibility for power expenses to operate the lift stations. For water service, a 1” service will be required at each lift station. Once the lift stations are in service, OCWS would pay 96CEG for these services through monthly billing. - It is assumed that there will be no charge for the Eglin utilities easement. If there is a fair market value charge in the future associated with this easement, this cost will be added to the monthly bill as a surcharge. - Decommissioning and demolition of the existing Main Base and Plew WWTPs are not included in this scope. - All work by OCWS must be approved in accordance with Section 255.20(1)(c)9 of Florida Statutes. *END OF SOW (dated REV: 25 Nov 2013) OKALOOSA COUNTY WATER & SEWER ENGINEERING (End of Summary of Changes)

Download this text file with its original spacing ↓