READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 1, 2014 — East County Master Sewer Plan_Page2 — reading text
Part 5 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 122-East County Master Sewer Plan_Page2.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
AGO
NUTMEG
Y8
5 20TH RILEY P D
KUMQ UAT
O LE
JUNIPER
GLEN 20TH
LINDEN
HW
PINE
Phase 1: Rocky Bayou 16" Force Main (FM)
MAPLE
Phase 7: E ReplaceMEI
Meigs-Seminole Lift Station 18TH
19TH
Y
FIN
IEW
BA
GS
LE
DG
CK
E
E
TV
T
TEE BISCAYNE
E
S
A LS
Phase 2: Rocky Bayou 16" FM NS
Phase 8: Hwy 20 12" FM
17TH HARDING
WE
AN
SU VAL PARAISO SAILBOAT
SL
VIRGI NIA CORAL
SYCAMO RE
UNION
EY
OU NELSON POINT
OS
VINE
MICHIG AN
Phase 9: New College Blvd Lift Station
MAPLE
LINDEN
BAY
Phase 3: Rocky Bayou 16" FM
OAK
PINE
ROSE
P
OAK SHO RES
ST
PA
