include landscape perimeter plantings surrounding
the retention pond in the southeast
corner of the
property.
Regular Council 8- 8- 06
285
SITE PLAN APPROVAL - CBG WALDORFF BUILDING cont.
c. The plans must address all
applicable
items submitted by Pubic Works/ Engineering,
Utilities, and Building Inspections
departments/ divisions in memorandums distributed
at the May 30, 2006 DRC
meetings ( as follows):
CDS DeDartmentllnsDection Division comments:
1) Four complete sets of plans shall be submitted
including structural calculations.
2) Indicate special
inspector qualifications. Will need reports submitted on
inspections performed and will need verifications on all hurricane connections
and final letter of approval.
3) Architect of design shall also submit final letter of
approval.
4) Title page
including occupant load ( Section 106. 3. 5).
5) Submit product approvals.
6) Need geotechnical soil
analysis done and submitted with plans.
7) Show truncated dome for
any street transitions/ sidewalks.
8) Show backflow preventor - put on notes that backflow will
be tested by AI Jordan
of our water ops 833- 9630.
9) Submit energy forms.
10) Detail all firewalls and penetration.
11) Show termite treatment procedure.
12) An as built survey shall be submitted after slab
inspection.
13) A compaction test shall be submitted.
14) Show bonding of all water,
gas, steel in foundation.
15) Street number shall be installed final
by inspection.
16) Water heaters shall have a switched disconnect.
17) Mechanical units shall be
physically
secured.
18) Show attic accesses.
19) Show insulations.
20) Signage shall be permitted
separately.
Public Works DeDartmentlEnaineerina Division comments;
1) The official address for the
development is 45 Eglin Parkway NE.
2) Clarify the correct
spelling of the development and make corrections on the plans
as necessary.
3) Identify the vertical datum used on the
plans, i.e. NGVD ' 29.
4) Installation of parking spaces in
City right-of-way requires special review by the
Public Works Director and must be approved
by City Council. The parking cannot
interfere with the clear line of sight for all street connections or
any other line of
sight necessary for safe traffic movements.
5) Parking spaces in right- of-way cannot be part of required number of parking
spaces for the development.
6) A Letter of Credit to the
City of Fort Walton Beach will be required for the
installation of the proposed sidewalk and
parking ( if approved) within the right-of-
way. The Letter of Credit will be released after completion of the
improvements in
the right- of-way is approved by the Public Works
Department.
7) Handicap ramps for sidewalks shall be constructed at raised curbs, according to
the latest Florida
Accessibility Code.
8) It appears there will be a
large drop in elevation from the parking area to the
existing street connection at the proposed driveways. Add the note regarding the
2% cross slope at the crosswalk locations so
they are not overlooked by the
contractor. ( Note number 8 in the CRA Standard Notes on the
Grading Plan)
9) Instead of 2 foot drop curb install the
City' s Standard 4 foot wide Driveway
Turnout Curb and Gutter at the
driveway connection on Staff Drive. This provides
a seamless
gutter line in the curb.
Regular Council
8- 8- 06
286
SITE PLAN APPROVAL - CBG
WALDORFF BUILDING cont.
10) The Florida Department of
Transportation ( DOT) must be notified of all work
a State Road. Contact the
DOT asset manager, VMS, at ( 850) 678-
along
2993. If a permit
is required from DOT, notice of
approval shall be provided to the City prior to the
issuance of a building permit.
11) Change the note on the
dumpster gate clearance to be at least 10 feet 6 inches.
12) Locate the stop bars at the
driveway connections to the approaching side of the
crosswalks. J_
Utilities Department comments:
1) There is a 6" cast iron water main
available on the east side of Eglin
a 6" water main available
Parkway and
along Staff Drive for any required water service
connections. The plans do not indicate IiiW'
any existing or proposed water service
connections. Any proposed water services
should be identified on the
plans,
including the size of the tap, location and size of the meter, and location and
of backflow preventer. If type
any existing water services are to be used, shall
also be identified on the they
plans.
The sizes and locations of
existing water mains and appurtenances shall be
verified and shown on the plans
prior to approval of this development.
2) According to office
drawings, there is an existing 8" terra cotta sanitary sewer
gravity main available on the north side of Staff Drive. There are two
outs extending to the existing stub-
property: one from an existing manhole ( MH # 388) and one
from the 8" gravity sewer. The
plans do not show any existing or proposed
sanitary sewer connections. The use of any existing or
shall be indicated on the
proposed sewer laterals
plans, including location of the connection,
pipe material, upstream and downstream invert elevations, and pipe, size,
The sizes and locations of the slope.
existing sanitary sewer main and manholes shall be
verified and shown on the
plans prior to approval of this development.
3) Backflow preventers are
required on all water service lines and shall be installed
on private
property. Meters shall be installed in a right-of-way or easement.
The City shall be
responsible for performing any required water main
taps,
installing the service lines up to the right-of-way line, and
meters. The Developer shall be installing the water
responsible for installing the backflow preventers
and all onsite
piping outside the right-of-way line.
4) Sanitary sewer cleanouts shall be
required at all bends, outside the building, and
at the right- of-way line.
The Developer shall be
responsible for locating the existing sewer stub- outs to the
property. If any of the existing stub- outs are to be used, the
cleanout at the right- of-way line and the City shall install a
Developer shall be responsible for all
sewer piping from the
right-of-way to the building. If a new connection is required,
the City shall be responsible for
making any sewer taps and installing the lateral
from the main to the
right-of-way line. The Developer