READ ALONGSIDE THE SOURCE

Fort Walton Beach Council minutes — 08-08-06 regular minutes — reading text

Part 5 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10750-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

recreational " pool") Section 424 FBC. 2) Submit product approvals for bathhouses. Include water fountain. 3) Include adequate representative support for the Florida Accessibility guidelines including handicapped parking which should be near to the park area. 4) Electrical plans shall be stamped/ signed by an engineer if designed for 800 amps 240v.) or more on a commercial system. Regular Council 8- 8- 06 283 SITE PLAN APPROVAL - CENTRAL PARK AT UPTOWN STATION cont. Public Works DecartmentlEnaineerina Division comments: 1) The official address for the development is 99 Eglin Parkway NE # 49. 2) It will be the responsibility of the owner to empty the trash receptacles for the Park into the existing City dumpsters. 3) All facilities must meet the latest Florida Accessibility Code. CDS Decartment comments: 1) Please submit a site plan for the entire shopping center so that parking spaces can be verified. 2) Because the park will be utilized by residents from adjoining neighborhoods, pedestrian accessfrom points outside the shopping center needs to be addressed. This might include crosswalks on Hughes Street to the shopping center entrances, construction of a sidewalk along the south side of Hughes Street, enhanced pedestrian access from Eglin Parkway at the entrances to the shopping center, etc. Please address this issue on a site plan showing the entire shopping center in relation to adjoining street. 3. As was brought up by some CRA Board members when they reviewed the conceptual plans, safety is a major concern. The fact that the park is located between drive aisles for back- up parking is the primary issue. Please address these safety concerns possibly in the following ways: a. The drive aisle between the parking spaces and the park' s curbing is 16 or 17 feet in width. Consider striping at the 12' required drive aisle width to give the perception of a smaller lane for vehicular access and using stamped asphalt or pavers for the 4- 5' " pedestrian walk." b. Consider installation of an open style fence 3- 4' in height along the entire perimeter of the park, with gates at all pedestrian entrances. c. Where the pedestrian entrances are located, consider installing intersection humps" raised to the level of the curbing. 4. Although there are handicapped spaces located throughout the shopping center parking lot, there are none shown near the park. Please add one or two spaces, perhaps across from the car " drop- off' area using the raised intersection hump. Utilities Decartment comments: 1) The water and wastewater demands listed on the Concurrency Forms shall be verified and revised as necessary. The estimated flows seem low for two restrooms and a fountain. 2) The Utility Plan shows 455 linear feet of proposed 2" water service main coming from the south. The plan should indicate the tie-in point to the south and whether the connection will be to an existing or proposed water main. 3) According to office drawings, there is an available 8" terra cotta gravity sanitary sewer main available as shown on the Utility Plan. The plans show a proposed 6" service line with two new manholes and one cleanout. TheDeveloper shall be responsible for all onsite sewer installation and the existing sewer main. The sizes and locations of the existing connection to the sanitary sewer manholes and mains shall be verified prior to approval of this development. 4) The proposed Utility Plan requires a 6" sewer main connection to an existing 8" gravity sewer main with a new manhole and a 2" water service line with a new 2" water meter, valve, and backflow preventer. Backflow preventers are required on all water service lines and shall be installed on private property. Meters shall be installed in a right-of-way or easement. 5) Water meters are to be accessible to the water meter readers and located in an area not susceptible to heavy traffic, preferably a grassed area, not in a driveway orparking space. 6) responsibility of the Developer' s Engineer to determine if FDEP and/ or It is the FDOT permitting is required for the water or sewer services. Regular Council 284 8- 8- 06 SITE PLAN APPROVAL - CENTRAL PARK AT UPTOWN STATION cont. 7) Water and sewer impact fees shall to the apply new development. The must Developer complete an ERC Determination Form based on the table provided in the impact fee ordinance or estimated water and wastewater flows. 8) Water and sewer connection fees shall be determined when the final utility plan has been submitted and approved. Based on the preliminary utility plan, the connection fees are $ 1, 000 for water and 600 for sewer. This does not include potential fees for pavement or sidewalk cuts or any other additional fees that may be necessary. 9) The development must meet FDEP environmental regulations and FDOT standards for sediment and soil erosion control. The proposed sediment and erosion control measures shall be installed prior to commencement of any demolition of structures or construction of the existing proposed development. 10) The proposed sediment and erosion control measures shall be shown and identified on the Demolition Plan. 11) See list of standard notes to be added to the final plans. The plans shall not be approved until all required standard notes are included on the 12) The pipe material of the plans. proposed 2" water service main and 6" sanitary sewer main shall be indicated on the plans. 13) The construction plans shall include a detail sheet depicting the connection to the sanitary sewer manhole and proposed installation of the water and sewer service mains. Mr. Campbell seconded motion and it carried unanimously with Holmes, Patterson, Tucker, Pullen, Hartwell, and Minich in favor. Campbell, Mr. Tucker moved to waive the permit fee for the project. Mr. Patterson seconded motion and it failed by a vote of 3 to 4 with Patterson, Campbell and Tucker in favor and Holmes, Pullen, Hartwell, and Minich opposed. SITE PLAN APPROVAL - CBG WALDORFF BUILDING Consideration of a request by DAG Architect on behalf of WFW of N. W. Florida, LLC for site property owner CBG Properties, Inc. and plan approval of the CBG Waldorff Building, 45 Eglin subject to conditions outlined in the backup report. The project consists of the Parkway NE, construction of a three- story, 35, 000 square foot office building, with associated parking, landscaping and other amenities. Ame LeMay, Choctaw Engineering, briefly went over the proposed project. Peggy Fowler, CDS Planner, reported staff recommends approval, with conditions. She staff report for the record. Ms. submitted the LeMay had no object to the staff report. The Mayor opened the floor for public input. As there was none, the public hearing was closed. Mr. Tucker moved to approve the site plan for the CBG Waldorff Building, located at 45 Eglin Parkway NE, subject to the following conditions: Note: The recommendation is based upon the application submitted by the applicant, site drawings developed by Choctaw Engineering, Inc. ( project 2005-282- A, dated 5/ 10/ 06, plan 6/ 23/ 06), architectural revised drawings developed by DAG Architects ( project # 05048, dated 6/ 23/06), and landscape plan by Bradford R. Davis, Inc. ( project 45 Eglin Parkway, dated 6/ 23/ 06). 1. Prior to issuance of a building permit: a. The placement of on- street parking spaces identified as " future" on site plan must be approved by Public Works to satisfy safety requirements. b. A landscape plan prepared by a professional landscape architect or be submitted and approved nurseryman must by CDS staff. The plan must comply with all applicable regulations in Section 12. 71 of the LDC. Design for an must be provided. The irrigation system with a well plan shall

Download this text file with its original spacing ↓