READ ALONGSIDE THE SOURCE

Fort Walton Beach Council minutes — 08-08-06 regular minutes — reading text

Part 4 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10750-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

The on private property. Meters shall water main taps, installing City shall be responsible for performing any required the service lines up to the right-of-way line, and installing the water meters. The Developer shall be responsible for installing the backflow preventers and all onsite piping outside the right-of-way line. the building, and 5) cleanouts shall be required at all bends, outside Sanitary sewer at the right-of-way line. sewer stub- outs to the The Developer shall be responsible for locating the existing are to be used, the City shall install a property. If any of the existing stub-outs for all cleanout at the right-of- way line and the Developer shall be responsible the of- to the building. If a new connection is required, sewer piping from right- way and installing the lateral the City shall be responsible for making any sewer taps shall be responsible for from the main to the right-of-way line. The Developer line to the building. installing all sewer piping from the right-of-way in an readers and located 6) Water meters are to be accessible to the water meter area not susceptible to heavy traffic, preferably a grassed area, not in a driveway orparking space. determine if FDEP and/ or 7) responsibility of the Developer' s Engineer to It is the FDOT permitting is required for the water or sewer services. 8) Water and sewer impact fees shall apply to the new development. Hotel/ motel = 0. 50 ERCs per unit/room and the fees for sewer are $ 807 per ERC. Impact fees for water are $ 700 per ERC, units), the total number of Based on the number of units for the proposed hotel ( 68 water impact fees of ERCs for this development is 34, resulting in estimated 438. These estimates do not 23, 800 and estimated wastewater impact fees of $27, include any potential credits for prior usage. when the final utility plan 9) Water and sewer connection fees shall be determined has been submitted and approved. and FDOT standards 10) The development must meet FDEP environmental regulations and erosion control for sediment and soil erosion control. The proposed sediment of existing measures shall be installed prior to commencement of any demolition structures or construction of the proposed development. final plans. The plans shall not be 11) See the list of standard notes to be added to the included on the plans. approved until all required standard notes are and sewer service mains 12) The materials and sizes for existing and proposed water with invert elevations and appurtenances shall be identified on the plans along water and sewer systems and slopes of the proposed sewer mains. The onsite will end shall be deemed systems. The City' s maintenance responsibilities private at the right-of- way line. the vacated alley, as c. Owner shall provide proof of title for the entire parcel, including shown on the survey. 2. Prior to Certificate of Occupancy: and striped as per City and a. All public sidewalks/ crosswalks shall be constructed with ADA requirements. FDOT specifications as applicable, including consistency SW and First Street SW that will Any existing curb cuts along Miracle Strip Parkway no longer be utilized for this parcel will be curbed and sidewalk reconstructed where applicable. i. e., stormwater, utility, sidewalk, b.All required City and State easements and permits ( the appropriate agency. driveway, etc.) shall be executed and approved by Mr. Hartwell seconded motion and it carried unanimously with Holmes, Patterson, Campbell, Tucker, Pullen, Hartwell, and Minich in favor. Regular Council 8- 8- 06 282 SITE PLAN APPROVAL - CENTRAL PARK AT UPTOWN STATION Consideration of a request by project architect Jason Carter on behalf of property owner 99 Eglin, Ltd for site plan approval of Central Park at Uptown Station, 99 Eglin Parkway NEt subject to conditions outlined in the backup report. The project consists of the demolition of a of the portion existing asphalt parking area, and development of a park that will include: a playground, an interactive fountain, restrooms, entry pavilion and train stop, extensive landscaping, integrated audio system to broadcast music and event audio, area to host events such as outdoor drive- in movies, park benches throughout, decorative lighting and high quality concrete pavers in all paved areas. I~; The City Attorney gave the oath to those individuals who wished to speak on the issue, noting that the CDS Director and CDS Planner have already been SWOrn in. Jason Carter with Uptown Station briefly described the proposed project to develop a park that will be open to the general public located within the parking lot of the Uptown Station Shopping Center. He had no objections to the staff report with conditions. He that the requested permit fees and the water impact fees be waived. Peggy Fowler, CDS Planner, reported the CRA Board recommends approval with conditions. She submitted the staff report for the record. The Mayor opened the floor for public input. The City Attorney gave the oath to Chris Gibson. Chris Gibson, 249 Brooks Street, received clarification that the project will not receive CRA funds. As there was no one further, the public hearing was closed. Mr. Tucker moved to approve the site plan for Central Park at Uptown Station located at 99 Eglin Parkway NE, subject to the following conditions: Note: The recommendation is based upon the application submitted by 99 Eglin Ltd., site plan drawings developed by GCT, Inc. ( project Central Park at Uptown Station, 6/ 23/06), and architectural drawings developed by GCT ( project Central Park at Uptown Station, 9/ 29/ 05). 1. Prior to City Council review: a. The site plan shall be revised to include the raised intersections hump at the north and south entrances to the park. THIS HAS BEEN SHOWN ON THE SITE PLAN. 2. Prior to issuance of a building permit: a. Details of the raised intersection " hump" shall be included. b. A landscape plan prepared by a professional landscape architect or nurseryman must be submitted and approved by CDS staff. The plan must comply with all applicable regulations in Section 12. 71 of the LDC. Design for an irrigation system with a well must be provided. c. The plans must address all applicable items submitted by Public Works/ Engineering, Utilities, CDS, and Building Inspections departments/ divisions in memorandumsA~, distributed at the June 1, 20065 DRC meetings (as follows): CDS DeDartment - InsDection Division comments: 1) Plans shall be routed to the state prior to submitting for permit and have their stamp of approval. (Treated as commercial

Download this text file with its original spacing ↓