READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-14-2010 Regular — reading text
Part 6 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25184-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
mm
O a° N
Q v v 3 v v w 00
WW
N
N N r
W
E N
W E M Z
w
a W QJJQ
p C Ci
d
L
D E p m D L c
a '.-.+
I cn
N
J
W
Q N d .•
LL Iml c W
a
7 Cf
c w ea Q H
W
H mm
J W N
C9 3
m
O_
T V
ea
Y
H
O' Z
ui
HH
D coco
c V)C. 0 a- R q m 0 0 aa
rA,
7 N o a
o
N
N o a N
CL
N
CC CD
m
m
a mm
T N M
ATTACHMENT 1
BID SUMMARY COMMENTS
BID NO. 10 -015
Specification # 1- Low bidder John Deere Landscapes, did not meet
specififcations. The fertilizer they submitted contained urea as its quick
release nitrogen source and muriate of potash as its potassium source. Our
specifications require ammonium sulfate for the nitrogen source and sulfate
of potash as the potassium source. Second low bidder Advanced Lawn, did
not meet specifications because the fertilizer submitted contained sulfur
coated urea as the slow release portion of the nitrogen, and our
specifications required a tri -coat or polymer coated urea as the slow release
portion of the nitrogen. Third low bidder Spencer Turf, did not supply
information regarding product ingredients and therefore did not meet
specifications. Recommend award item # 1 to Regal Chemical
Specification # 2- Low bidder John Deere Landscapes did not meet
specifications due to muriate of potash contained in fertilizer submitted as
the potassium source, and our specifications require all sulfate of potash as
the potassium source. Second low bidder Advanced Lawn did not meet
specifications due to sulfur coated urea contained in fertilizer submitted as
the slow release portion of the nitrogen. Our specifications require a tri -coat
or polymer coated urea as the slow release portion of the nitrogen.
Recommend award item #2 to Regal Chemical
Specification # 3- is 20 -0 -10 ( Ronstar). Ronstar is a pre- emergent
herbicide /fertilizer combination. In early spring and again in early summer,
the Golf Club applies this herbicide /fertilizer combination to feed the turf
and to greatly reduce grassy weed infestation. Recommend award item #3
to low bidder John Deere Landscapes
CITY COUNCIL MEETING
September 14, 2010
Consent Agenda
AWARD OF BID FOR RBC DEMOLITION
Synopsis: Awards bid at no cost to the City to Deco
Industrialfor demolition and removal ofRBC units at the
WWTP
Agenda Item Number: 8. 3
CITY OF FORT WALTON BEACH
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Michael D. Beedie, P. E., Engineering and Utility Services Director
Date: September 1, 2010
Subject: Request to Award Invitation to Bid No. 10 -018 Dismantle & Dispose of Sewer
Plant :Equipment ( Rotating Biological Contactor Units)
1. BACKGROUND:
1. 1. In March 2010, the City of Fort Walton Beach started transmitting all of its raw
wastewater to the new Okaloosa County Arbennie Pritchett Water Reclamation Facility
WRF).
1. 2. Upon the completion of the raw wastewater interconnect with Okaloosa County, the City
began the process to decommission the equipment at the wastewater treatment plant
WWTP).
1. 3. So far, the City has emptied the headworks, the rotating biological contactor ( RBC)
units, secondary clarifiers, and chlorine contact chamber.
1. 4. Liquid still remains in the primary clarifiers, digesters, thickener, and holding pond.
1. 5. City staff has also begun the process of removing the sprinkler heads on the sprayfield
on the property leased from the Air Force in order to return that property to the Air Force
prior to the lease expiring in October 2010.
2. DISCUSSION:
2. 1. On August 2, 2010, the Purchasing Division issued Invitation to Bid No. 10 -018 for the
Demolition & Removal of Sewer Plant Equipment. On, August 17, 2010, nine ( 9)
vendors submitted bids to provide all labor, materials, and equipment to dismantle,
remove,
and dispose of 21 each RBC assemblies from the City of Fort Walton Beach
WWTP.
2. 2. The nine ( 9) vendors that submitted bid packages were as follows:
2. 2. 1. Deco ]Industrial
2. 2. 2. Jobe' s Dirt Works, LLC
2. 2. 3. Fleisc]unan' s, Inc.
2. 2. 4. Cajun Contractors, Inc.
2. 2. 5. Diamond M. Concrete, LLC
2. 2. 6. Gordon Land Clearing
2. 2. 7. D.H. Griffin Wrecking Co.
2. 2. 8. Crestview Site & Underground
2. 2. 9. Redfish Marine Construction
2. 3. Based on the bid package submittals, the base bid prices for the pumps and other items
were as follows:
2. 3. 1. Deco Industrial 0. 00
2. 3. 2. Jobe' s Dirt Works, LLC 75400. 00
2. 3. 3. Fleischman' s, Inc. 191400. 00
2. 3. 4. Cajun Contractors, Inc. 321604. 00
2. 3. 5. Diamond M. Concrete, LLC 35, 628. 00
2. 3. 6. Gordon Land Clearing 36, 500. 00
2. 3. 7. D.H. Griffin Wrecking Co. 45, 960. 00
2. 3. 8. Crestview Site & Underground 1151000. 00
2. 3. 9. Redfish Marine Construction 135, 360.00
2. 4. After reviewing the bid packages, it was determined by the Purchasing Division and
staff that Deco Industrial is the lowest responsive, responsible bidder. All materials, with
the exception of the concrete slab and fiberglass covers, will be removed and become the
property of the contractor and shall be completed within 90 days of issuance of the
Notice to Proceed.
3. FINANCIAL INFORMATION:
3. 1. The Demolition &
Removal of the RBC Units is related to the decommissioning of the
WWTP, so