with applicable
COUNTY Manuals, Procedures, Handbooks, District specific requirements, and
Florida Statutes. Maps, surveys and legal descriptions will be prepared under the
direction of a Florida Professional Surveyor and Mapper (PSM) to COUNTY size
and format requirements utilizing COUNTY approved software, and will be designed
to provide a high degree of uniformity and maximum readability. The
CONSULTANT will submit maps, legal descriptions, quality assurance check prints,
checklists, electronic media files and any other documents as required for this
project to the COUNTY for review at stages of completion as negotiated.
Master CADD File
29.1 Alignment
29.2 Section and 1/4 Section Lines (Not applicable to this project)
29.3 Subdivisions / Property Lines (Not applicable to this project)
Packet Pg. 615
29.4 Existing Right of Way (Not applicable to this project)
29.5 Topography
29.6 Parent Tract Properties and Existing Easements (Not applicable to this
project)
29.7 Proposed Right of Way Requirements
The ENGINEER OF RECORD (EOR) will provide the proposed
requirements. The PSM is responsible for calculating the final geometry.
Notification of Final Right of Way Requirements along with the purpose and
duration of easements will be specified in writing.
29.8 Limits of Construction
The limits of construction DGN file as provided by the EOR will be imported
or referenced to the master CADD file. Additional labeling will be added as
required. The PSM is required to advise the EOR of any noted discrepancies
between the limits of construction line and the existing/proposed right of way
lines, and for making adjustments as needed when a resolution is
determined.
29.9 Jurisdictional/Agency Lines (Not applicable to this project)
These lines may include, but are not limited to, jurisdictional, wetland, water
boundaries, and city/county limit lines.
Sheet Files
29.10 Control Survey Cover Sheet (Not applicable to this project)
29.11 Control Survey Key Sheet (Not applicable to this project)
29.12 Control Survey Detail Sheet (Not applicable to this project)
29.13 Right of Way Map Cover Sheet
29.14 Right of Way Map Key Sheet
29.15 Right of Way Map Detail Sheet
29.16 Maintenance Map Cover Sheet (Not applicable to this project)
29.17 Maintenance Map Key Sheet (Not applicable to this project)
29.18 Maintenance Map Detail Sheet (Not applicable to this project)
Packet Pg. 616
29.19 Reference Point Sheet
This sheet(s) will be included with the Control Survey Map, Right of Way Map
and Maintenance Map.
29.20 Project Network Control Sheet
This sheet depicts the baseline, the benchmarks, the primary and secondary
control points and their reference points including the type of material used
for each point, their XYZ coordinates, scale factors and convergence angles.
This sheet(s) may be included with the Control Survey Map, Right of Way
Map and Maintenance Map.
29.21 Table of Ownerships Sheet
Miscellaneous Surveys and Sketches
29.22 Parcel Sketches (Not applicable to this project)
29.23 TIITF Sketches (Not applicable to this project)
29.24 Other Specific Purpose Survey(s) (Not applicable to this project)
29.25 Boundary Survey(s) Map
29.26 Right of Way Monumentation Map
29.27 Title Search Map (Not applicable to this project)
29.28 Title Search Report (Not applicable to this project)
29.29 Legal Descriptions
29.30 Final Map/Plans Comparison
The PSM will perform a comparison of the final right of way maps with the
available construction plans to review the correctness of the type of parcel to
be acquired and the stations/offsets to the required right of way. The PSM
will coordinate with the EOR to resolve any conflicts or discrepancies and
provide documentation of the review.
29.31 Field Reviews
29.32 Technical Meetings
29.33 Quality Assurance/Quality Control
29.34 Supervision
29.35 Coordination
Packet Pg. 617
29.36 Supplemental Mapping (Not applicable to this project)
30 GEOTECHNICAL
The CONSULTANT shall, for each project, be responsible for a complete
geotechnical investigation. Work performed by the CONSULTANT shall be in
accordance with COUNTY standards.
The CONSULTANT shall notify the COUNTY in adequate time to schedule a
representative to attend related meetings and field activities.
CONSULTANT shall perform specialized field-testing as required by project needs.
Testing and classification will be performed in accordance with applicable COUNTY
standards, ASTM Standards or AASHTO Standards, unless otherwise specified in
the Contract Documents.
Standard Penetration Testing will be performed using an automatic hammer.
30.1 Document Collection and Review
CONSULTANT will review printed literature including topographic maps,
county agricultural maps, aerial photography (including historic photos),
ground water resources, geology bulletins, potentiometric maps, pile driving
records, historic construction records and other geotechnical related
resources. Prior to field reconnaissance, CONSULTANT shall review
U.S.G.S., S.C.S. and potentiometric maps, and identify areas with
problematic soil and groundwater conditions.
Roadway
The CONSULTANT shall be responsible for coordination of geotechnical
related fieldwork activities. The CONSULTANT shall retain samples until
acceptance of Final plans.
30.2 Develop Detailed Boring Location Plan
Develop a detailed boring location plan. Meet with COUNTY Geotechnical
Project Manager for boring plan approval. If the drilling program expects to
encounter artesian conditions, the CONSULTANT shall submit a
methodology(s) for plugging the borehole to the COUNTY for approval prior
to commencing with the boring program.
30.3 Stake Borings/Utility Clearance
Stake borings and obtain utility clearance.
30.4 Coordinate and Develop MOT Plans for Field Investigation
Packet Pg. 618
Coordinate and develop Maintenance of Traffic (MOT) plan. Work zone traffic
control will be performed in accordance with the FDOT’s Roadway and
Traffic Design Standards Index 600 series.
30.5 Drilling Access Permits
Obtain State, County, City, and Water Management District permits for
performing geotechnical borings, as needed.
30.6 Property Clearances
Notify property tenants in person of drilling and field activities, if applicable.
Written notification to property owners/tenants is the responsibility of the
COUNTY’s Project Manager.
30.7 Groundwater Monitoring
Monitor groundwater, using piezometers.
30.8 LBR / Resilient Modulus Sampling
Collect appropriate samples for Limerock Bearing Ratio (LBR) testing.
30.9 Coordination of Field Work
Coordinate field work required to provide geotechnical data for the project.
30.10 Soil and Rock Classification - Roadway
Refine soil profiles recorded in the field, based on results of laboratory
testing.
30.11 Design LBR
Determine design LBR values from the 90% and mean methods.
30.12 Laboratory Data
Tabulate laboratory test results for inclusion in the geotechnical report, the
report of tests sheet (Roadway Soil Survey Sheet), and for any necessary
calculations and analyses.
30.13 Seasonal High Water Table
Review the encountered ground water levels and estimate seasonal high
ground water levels. Estimate seasonal low ground water levels, if requested.
Packet Pg. 619
30.14 Parameters for Water Retention Areas
Calculate parameters for water retention areas, exfiltration trenches, and/or
swales.
30.15 Delineate Limits of Unsuitable Material
Delineate limits of unsuitable material(s) in both horizontal and vertical
directions. Assist the Engineer of Record with detailing these limits on the
cross-sections. If requested, prepare a plan view of the limits of unsuitable
material.
30.16 Electronic Files for Cross-Sections
Create electronic files of boring data for cross-sections.
30.17 Embankment Settlement and Stability
Estimate the total magnitude and time rate of embankment settlements.
Calculate the factor of safety against slope stability failure.
30.18 Stormwater Volume Recovery and/or Background Seepage Analysis
Perform stormwater volume recovery analysis as directed by the COUNTY.
30.19 Geotechnical Recommendations
Provide geotechnical recommendations regarding the proposed roadway
construction project including the following: description of the site/alignment,
design recommendations and discussion of any special considerations (i.e.
removal of unsuitable material, consolidation of weak soils, estimated
settlement time/amount, groundwater control, high groundwater conditions
relative to pavement base, etc.) Evaluate and recommend types of
geosynthetics and properties for various applications, as required.
30.20 Pavement Condition Survey and Pavement Evaluation Report (Not
applicable to this project)
30.21 Preliminary Roadway Report
If a preliminary roadway investigation is performed, submit a preliminary
roadway report before the Phase II plans submittal. The purpose of the
preliminary roadway report will be to assist in setting road grades and
locating potential problems.
Copies of U.S.G.S. and S.C.S. maps with project limits shown.
A report of tests sheet that summarizes the laboratory test results, the
soil stratification (i.e. soils grouped into layers of similar materials) and
construction recommendations relative to Standard Indices 500 and 505.
Packet Pg. 620
Results of tasks discussed in the previous section (Data Interpretation
and Analysis).
An appendix that contains stratified soil boring profiles, laboratory test
data sheets, sample embankment settlement and stability calculations,
design LBR calculation/graphs, and other pertinent calculations.
The CONSULTANT will respond in writing to any changes and/or
comments from the COUNTY and submit any responses and revised
reports.
30.22 Final Report
The Final Roadway Report shall include the following:
Copies of U.S.G.S. and S.C.S. maps with project limits shown.
A report of tests sheet that summarizes the laboratory test results, the
soil stratification (i.e. soils grouped into layers of similar materials) and
construction recommendations relative to Standard Indices 500 and 505.
Results of tasks discussed in the previous section (Data Interpretation
and Analysis).
An appendix that contains stratified soil boring profiles, laboratory test
data sheets, sample embankment settlement and stability calculations,
design LBR calculation/graphs, and other pertinent calculations.
The CONSULTANT will respond in writing to any changes and/or
comments from the COUNTY and submit any responses and revised
reports.
30.23 Auger Boring Drafting
Draft