projects will have all contacts
as described above.
Packet Pg. 603
7.4 Exception Coordination (Not applicable to this project)
7.5 Preliminary Utility Meeting (Not applicable to this project)
7.6 Individual/Field Meetings
The CONSULTANT shall meet with each UAO separately throughout the
project design duration to provide guidance in the interpretation of plans,
review changes to the plans and schedules, optional clearing and grubbing
work, and assist in the development of the UAO(s) plans and work
schedules. The CONSULTANT is responsible for motivating the UAO to
complete and return the necessary documents after each Utility Contact or
Meeting.
7.7 Collect and Review Plans and Data from UAO(s)
Make Determinations (Compensable Interest, Easements, Coordinate,
Analyze). Ensure information (utility type, material and size) is sent to the
designer for inclusion in the plans. Coordinate programming of funds.
7.8 Subordination of Easements Coordination (Not applicable to this
project)
7.9 Utility Design Meeting (Not applicable to this project)
7.10 Review Utility Markups and Work Schedules and Processing of
Schedules and Agreements
Review utility marked up plans individually as they are received for content
and coordinate review with the designer. Send color markups and schedules
to the appropriate COUNTY office(s) for review and comment if required.
7.11 Utility Coordination/Followup
This includes follow-up, interpreting plans, and assisting and the completion
of the UAO(s) work schedule and agreements. Includes phone calls, face-to-
face meetings, etc., to motivate and ensure the UAO(s) complete and return
the required documents in accordance with the project schedule. Ensure the
resolution of known conflicts. This task can be applied to all phases of the
project.
7.12 Utility Constructability Review
Review utility schedules against construction contract time, and phasing for
compatibility. Coordinate with and obtain written concurrence from the
construction office.
7.13 Additional Utility Services (Not applicable to this project)
.
Packet Pg. 604
7.14 Processing Utility Work by Highway Contractor (UWHC) (Not applicable
to this project)
7.15 Contract Plans to UAO(s) (Not applicable to this project)
7.16 Certification/Close-Out
This includes hours for transmitting utility files to the DUO and preparation of
the Utility Certification Letter. The CONSULTANT shall certify to the
appropriate COUNTY representative the following:
Utility negotiations (Full execution of each agreement, approved Utility Work
Schedules, technical special provisions written, etc.) have been completed
with arrangements made for utility work to be undertaken and completed as
required for proper coordination with the physical construction schedule.
OR
An on-site inspection was made and no utility work will be involved.
OR
Plans were sent to the Utility Companies/Agencies and no utility work is
required.
7.17 Other Utilities (Not applicable to this project)
8 ENVIRONMENTAL PERMITS, COMPLIANCE AND CLEARANCES
The CONSULTANT shall notify the COUNTY Project Manager and other
appropriate personnel in advance of scheduled meetings with the regulatory
agencies to allow a COUNTY representative to attend. The CONSULTANT shall
copy in the Project Manager and the Environmental Permit Coordinator on permit
related correspondence and meetings.
8.1 Preliminary Project Research
The CONSULTANT shall perform preliminary project research and shall be
responsible for early identification of and coordination with the appropriate
regulatory agencies to assure that design efforts are properly directed toward
permit requirements.
8.2 Complete Permit Involvement Form
The CONSULTANT shall document permit involvement in coordination with
the COUNTY Project Manager. This is to be done upon completion of
preliminary project research.
8.3 Establish Wetland Jurisdictional Lines and Assessments
Packet Pg. 605
The CONSULTANT shall collect data and information necessary to
determine the boundaries of wetlands and surface waters defined by the
rules or regulations of each agency processing or reviewing a permit
application necessary to construct a COUNTY project.
The CONSULTANT is to stake or flag the State and Federal jurisdictional
lines. A registered surveyor will be required to survey these jurisdictional
lines. The consultant must remove stakes or flags after the environmental
permits are approved.
The contractor is to be provided, in the plans, survey points to delineate or
flag the wetlands that are NOT TO BE IMPACTED. It is the contractor’s
responsibility to flag or stake these areas prior to construction beginning and
maintain them throughout construction. The CONSULTANT will identify this
responsibility of the contractor clearly in the plans.
The plans shall clearly show the jurisdictional lines(s). The jurisdictional
areas that are impacted shall be clearly designated and noted “Construction
activities allowed.” Jurisdictional areas that are not to be impacted and are to
remain undisturbed throughout construction should be clearly designated and
noted “Construction activities not allowed.”
The CONSULTANT shall include a section in the roadway component set of
plans to reflect the items above. This section shall also include a Tabulation
Sheet or Block defining the undisturbed wetlands by x, y coordinates or
station and offsets. The disturbed wetlands shall also be tabulated in square
feet (or acres) indicating the area impacted. This section shall include any
general or project specific environmental notes.
On projects where no wetland impacts are anticipated, the plans will clearly
show the “Safe Upland Line”**. Areas outside this line shall be labeled or
noted “Construction Activities Not Allowed”. **According to the US Army
Corps of Engineers, a Safe Upland is any area that does not qualify as a
wetland because the associated hydrologic regime is not sufficiently wet to
elicit development of vegetation, soils, and/or hydrologic characteristics
associated with wetlands. The Consultant/Designer shall locate this line in a
manner that allows the Contractor to reproduce this line in the field – station
and offset, or state plan coordinates.
8.4 Agency Verification of Wetland Data
The jurisdictional lines will be verified during the permit submittal and review
by the State or Federal agency. A formal jurisdictional determination will not
be obtained prior to permit submittal except for new roadway alignments, or if
a questionable determination is anticipated. The CONSULTANT will be
responsible for jurisdictional determinations during permit reviews and will
respond to Requests for Additional Information by the reviewing agency.
8.5 Complete and Submit Required Permit Applications
Packet Pg. 606
The CONSULTANT will have a Pre-Application meeting with the State
permitting agency for projects involving Stormwater Ponds and bridge
replacement. The COUNTY project manager will be invited to the Pre-
Application meeting, and will be forwarded correspondence and meeting
minutes.
The Engineer of Record (EOR) shall prepare a narrative, in layman terms, for
the inclusion in the permit application package. It shall include work being
performed in this project, impacts to the environment and methods of
construction specifically related to the environmentally sensitive areas. This
brief description will aid the regulatory agency reviewer in understanding the
scope of the project.
For projects that do not have a wetland assessment (Unified Mitigation
Assessment Method, or UMAM), and the permit requires this information to
be issued, the CONSULTANT will prepare a UMAM to be submitted with the
permit application.
8.6 Prepare Dredge and Fill Sketches per Agency Criteria
8.7 Prepare USCG Permit Sketches per Agency Criteria (Not applicable to
this project)
8.8 Prepare Water Management District Right-of-Way Occupancy Sketches
(Not applicable to this project)
8.9 Prepare Coastal Construction Control Line (CCCL) Permit Application
(Not applicable to this project)
8.10 Prepare Tree Permit Information (Not applicable to this project)
8.11 Mitigation Coordination and Meetings
The CONSULTANT shall coordinate with COUNTY personnel prior to
approaching any environmental permitting or reviewing agencies. Once a
mitigation plan has been reviewed and approved by the COUNTY, the
CONSULTANT will be responsible for coordinating the proposed mitigation
plan with the environmental agencies.
8.12 Mitigation Design (To Be Provided by Others)
The COUNTY mitigation design will be in accordance with CH 373.4137 FS.
The NWFWMD will be responsible for developing a mitigation plan for the
wetland impacts associated with this project.
8.13 Environmental Clearances, Reevaluations and Technical Support (Not
applicable to this project)
8.14 Environmental Clearances and Reevaluations
Packet Pg. 607
The CONSULTANT shall prepare reports and clearances for the changes to
the project that occurred after the Phase I – NEPA Environmental
Assessment was completed. These changes could include but are not
limited to pond and/or mitigation sites identified, land use or environmental
changes, and significant design changes.
NEPA or SEIR Reevaluation: During the development of the final design
plans, the CONSULTANT shall be responsible for collecting the data and
preparing a Reevaluation in accordance with the National Environmental
Policy Act (NEPA), as described in 40 CFR Parts 1500 - 1508 and FAA
Order 1050.1E CHG 1, paragraph 401(g), Policies and Procedures for
Considering Environmental Impacts.
Archaeological and Historical Features: The CONSULTANT shall collect data
necessary to completely analyze the impacts, due to changes in the project
or project area, to cultural and historic resources, and prepare a Cultural
Resource Study, in accordance with the National Historic Preservation Act of
1966 (Public Law 89-665, as amended) and the implementing regulations (36
CFR 800) as well as with the provisions contained in Chapter 267, Florida
Statutes.
Wetland Impact Analysis: The CONSULTANT shall analyze the impacts to
wetlands for the changes to the project and complete the Wetlands
Evaluation Report, in accordance with FAA Order 1050.1E, Appendix A,
Section 18.
Wildlife and Habitat Impact Analysis: The CONSULTANT shall collect data
necessary and perform an Endangered Species Biological Assessment, and
analyze the impacts to