on the design and Pond Siting Report. The
CONSULTANT will supply the R/W acreages and limits as set forth in the
plan set. The CONSULTANT will not supply real estate cost estimates as a
part of this Scope of Services.
Packet Pg. 597
4.12 Technical Special Provisions (Not applicable to this project)
4.13 Other Roadway Analysis
Aviation Support Services
The CONSULTANT shall review the final design plans and specifications to
ensure compliance with FAA criteria and the approved ALP for CEW. The
CONSULTANT shall prepare the package for CEW to file FAA Form 7460-1
which shall cover impacted airspace during construction of the project. This
will include the preparation of drawings and calculations required to
accompany FAA Form 7460-1 and the completion of FAA Form 7460-1
Notice of Proposed Construction or Alteration. The preparation of FAA Form
7460-2 will be developed by the selected contractor.
4.14 Field Reviews
4.15 Technical Meetings
4.16 Quality Assurance/Quality Control
4.17 Independent Peer Review (Not applicable to this project)
4.18 Supervision
4.19 Coordination
5 ROADWAY PLANS
The CONSULTANT shall prepare Roadway, Drainage, Traffic Control, Utility
Adjustment Sheets, plan sheets, notes, and details. The plans shall include the
following sheets necessary to convey the intent and scope of the project for the
purposes of construction.
Plan content of the phase submittals will follow the general guidelines of Florida
Department of Transportation’s Phase II (60%), Phase III (90%), and Final
Submittals Plans Checklist as set forth in the FDOT Plans Preparation Manual.
5.1 Key Sheet
5.2 Summary of Pay Items
5.3 Drainage Map
5.4 Interchange Drainage Map (Not applicable to this project)
5.5 Typical Section Sheets
Packet Pg. 598
5.6 General Notes/Pay Item Notes
5.7 Summary of Quantities
5.8 Box Culvert Data Sheet (Not applicable to this project)
5.9 Bridge Hydraulics Recommendation Sheets (Not applicable to this
project)
5.10 Summary of Drainage Structures
5.11 Optional Pipe/Culvert Material
5.12 Project Layout
5.13 Plan/Profile Sheet (Not applicable to this project)
5.14 Profile Sheet
5.15 Plan Sheet
5.16 Special Profile (Not applicable to this project)
5.17 Back of Sidewalk Profile Sheet (Not applicable to this project)
5.18 Interchange Layout Sheet (Not applicable to this project)
5.19 Ramp Terminal Details (Plan View) (Not applicable to this project)
5.20 Intersection Layout Details
5.21 Miscellaneous Detail Sheets (Not applicable to this project)
5.22 Drainage Structure Sheet (Per Structure)
5.23 Miscellaneous Drainage Detail Sheets
5.24 Lateral Ditch Plan/Profile (Not applicable to this project)
5.25 Lateral Ditch Cross Sections (Not applicable to this project)
5.26 Retention/Detention Ponds Detail Sheet
5.27 Retention Pond Cross Sections
5.28 Cross-Section Pattern Sheet (Not applicable to this project)
5.29 Roadway Soil Survey Sheet
5.30 Cross Sections
Packet Pg. 599
5.31 Traffic Control Plan Sheets
5.32 Traffic Control Cross Section Sheets (Not applicable to this project)
5.33 Traffic Control Detail Sheets
5.34 Utility Adjustment Sheets
5.35 Selective Clearing and Grubbing (Not applicable to this project)
5.36 Erosion Control Plan
5.37 SWPPP
5.38 Project Control Network Sheet
5.39 Environmental Detail Sheets (Not applicable to this project)
5.40 Utility Verification Sheet (SUE Data)
5.41 Quality Assurance/Quality Control
5.42 Supervision
6 DRAINAGE ANALYSIS
The CONSULTANT shall analyze and document Drainage Tasks in accordance
with applicable manuals, guidelines, standards, handbooks, procedures, and
current design memorandums.
The CONSULTANT shall be responsible for designing a drainage and stormwater
management system. Design work shall comply with the requirements of the
appropriate regulatory agencies and the FDOT’s Drainage Manual.
The CONSULTANT shall develop a drainage map based upon available information
and field reviews. The available information should consist of old Florida
Department of Transportation Plans, USGS Quadrangles, USGS Studies,
NWFWMD Studies, FEMA Studies, Local Government Agency Studies or Contours,
etc. The drainage map should be included in the Hydraulic Design Study. The
Hydrology should be by regional or local regression equations, or by the rational
method. An assumed velocity should not be used. The CONSULTANT shall
document the Drainage Design in the Drainage Design Study. The Design Study
should show that the design requirements of the COUNTY, FDOT and FAA have
been met.
The CONSULTANT has the responsibility for determining the need, appropriate
locations, and sizes for water management facilities, and drainage outfalls. The
CONSULTANT shall refer Phase I – NEPA Environmental Assessment for
Packet Pg. 600
preliminary pond sites studied. The CONSULTANT shall be advised that pond
locations must be located within the footprint of the Phase I – NEPA Environmental
Assessment. The CONSULTANT shall evaluate the need for diversion ditch
systems along the project length to prevent comingling of overland runoff with
roadway runoff in order to minimize pond sizings.
The CONSULTANT shall provide the COUNTY a Drainage Design Documentation.
The documentation shall include a narrative description of existing and proposed
drainage structures, conditions, and facilities, and a listing of environmental
regulatory permits required. Hydrologic and hydraulic drainage computations for the
design presented in the plans shall be included along with supporting design
information such as drainage maps, geotechnical data (such as soil borings and
permeability tests), and correspondence that directly affected design decisions.
The CONSULTANT shall coordinate fully with the appropriate permitting agencies
and the COUNTY’s staff. Activities and submittals should be coordinated through
the COUTNY’s Project Manager. The work will include the engineering analyses for
any of the following:
6.1 Determine Base Clearance Water Elevation
Analyze, determine, and document high water elevations which will be used
to set roadway profile grade. Determine surface water elevations at cross
drains, floodplains, outfalls and adjacent stormwater ponds. Determine
groundwater elevations at intervals between the above-mentioned surface
waters.
6.2 Pond Siting Analysis and Report
Update Pond Siting Analysis and Report done in the Phase I – NEPA
Environmental Assessment.
6.3 Design of Cross Drains
Analyze the hydraulic design of cross drains. Check existing cross drains to
determine if they are structurally sound and can be extended. Document the
design as required. Determine and provide flood data as required.
6.4 Design of Roadway Ditches
Design roadway conveyance ditches. This includes determining ditch cross
sections, grades, selecting suitable channel lining, designing the side drain
pipes, and documentation.
6.5 Design of Outfalls
Analyze and document the design of ditch or piped outfalls. (Pond outlet
structure included in task 6.6)
Packet Pg. 601
6.6 Design of Stormwater Management Facility (Offsite Pond)
Design stormwater management facilities to meet requirements for
stormwater quality treatment and attenuation. Develop proposed pond layout
(shape, contours, slopes, etc.), perform routing calculations, and design the
outlet control structure.
6.7 Design of Stormwater Management Facility (Roadside Ditch as Linear
Pond or Infield Pond) (Not applicable to this project)
6.8 Design of Flood Plain Compensation Area
Determine flood plain encroachments, coordinate with regulatory agencies,
and develop proposed compensation area layout (shape, contours, slopes,
etc.). Document the design following the requirements of the regulatory
agency.
6.9 Design of Storm Drains
Develop a “working drainage map”, determine runoff, inlet locations, and
spread. Calculate hydraulic losses (friction, utility conflict and, if necessary,
minor losses). Determine Design Tailwater and, if necessary, outlet scour
protection.
6.10 Optional Culvert Material
Determine acceptable options for pipe materials.
6.11 French Drain Design (Not applicable to this project)
6.12 Drainage Wells (Not applicable to this project)
6.13 Drainage Design Documentation Report
Compile drainage design documentation into report format. Include
documentation for the drainage design tasks and associated meetings and
decisions, except the Pond Siting Analysis Report.
6.14 Bridge Hydraulic Report (Not applicable to this project)
6.15 Temporary Drainage Analysis (Not applicable to this project)
6.16 Cost Estimate
6.17 Technical Special Provisions (Not applicable to this project)
6.18 Other Drainage Analysis (Not applicable to this project)
6.19 Field Reviews
Packet Pg. 602
6.20 Technical Meetings
6.21 Quality Assurance/Quality Control
6.22 Independent Peer Review (Not applicable to this project)
6.23 Supervision
6.24 Coordination
7 UTILITIES
The CONSULTANT shall identify utility facilities and secure agreements, utility work
schedules, and plans from the Utility Agency Owners (UAO) ensuring no conflicts
exist between utility facilities and the COUNTY’s construction project. The
CONSULTANT shall certify utility negotiations have been completed with
arrangements made for utility work to be undertaken.
7.1 Kickoff Meeting (Not applicable to this project)
7.2 Identify Existing UAO(s)
Identify utilities in the corridor; check with Maintenance for Permits, Sunshine
State One Call, Subsurface Utility Engineering (SUE) Report, Design
Location Survey, and Existing Plans.
7.3 Make Utility Contacts
First Contact: Send letters and two sets of plans to each utility, one set for
the utility office, one set each to construction and maintenance if required.
Includes contact by phone for meeting coordination. Request type, size,
location, easements, cost for compensable relocation, and justification for
any utility exceptions. Include the meeting schedule (if applicable) and the
design schedule. Include typical meeting agenda.
Second Contact: At a minimum of 4 weeks prior to the meeting, the
CONSULTANT shall transmit two complete sets of Phase II plans to each
UAO having facilities located within the project limits, and one set to the
COUNTY Offices as required by the District.
Third Contact: Identify agreements and assemble packages. Send
agreements, letters and two sets of plans to the UAO(s) including component
sets, one set for the utility office, one set to construction and maintenance if
required. Include the design schedule. Not all