READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 7, 2014 — reading text

Part 60 of 68. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

on the design and Pond Siting Report. The CONSULTANT will supply the R/W acreages and limits as set forth in the plan set. The CONSULTANT will not supply real estate cost estimates as a part of this Scope of Services. Packet Pg. 597 4.12 Technical Special Provisions (Not applicable to this project) 4.13 Other Roadway Analysis Aviation Support Services The CONSULTANT shall review the final design plans and specifications to ensure compliance with FAA criteria and the approved ALP for CEW. The CONSULTANT shall prepare the package for CEW to file FAA Form 7460-1 which shall cover impacted airspace during construction of the project. This will include the preparation of drawings and calculations required to accompany FAA Form 7460-1 and the completion of FAA Form 7460-1 Notice of Proposed Construction or Alteration. The preparation of FAA Form 7460-2 will be developed by the selected contractor. 4.14 Field Reviews 4.15 Technical Meetings 4.16 Quality Assurance/Quality Control 4.17 Independent Peer Review (Not applicable to this project) 4.18 Supervision 4.19 Coordination 5 ROADWAY PLANS The CONSULTANT shall prepare Roadway, Drainage, Traffic Control, Utility Adjustment Sheets, plan sheets, notes, and details. The plans shall include the following sheets necessary to convey the intent and scope of the project for the purposes of construction. Plan content of the phase submittals will follow the general guidelines of Florida Department of Transportation’s Phase II (60%), Phase III (90%), and Final Submittals Plans Checklist as set forth in the FDOT Plans Preparation Manual. 5.1 Key Sheet 5.2 Summary of Pay Items 5.3 Drainage Map 5.4 Interchange Drainage Map (Not applicable to this project) 5.5 Typical Section Sheets Packet Pg. 598 5.6 General Notes/Pay Item Notes 5.7 Summary of Quantities 5.8 Box Culvert Data Sheet (Not applicable to this project) 5.9 Bridge Hydraulics Recommendation Sheets (Not applicable to this project) 5.10 Summary of Drainage Structures 5.11 Optional Pipe/Culvert Material 5.12 Project Layout 5.13 Plan/Profile Sheet (Not applicable to this project) 5.14 Profile Sheet 5.15 Plan Sheet 5.16 Special Profile (Not applicable to this project) 5.17 Back of Sidewalk Profile Sheet (Not applicable to this project) 5.18 Interchange Layout Sheet (Not applicable to this project) 5.19 Ramp Terminal Details (Plan View) (Not applicable to this project) 5.20 Intersection Layout Details 5.21 Miscellaneous Detail Sheets (Not applicable to this project) 5.22 Drainage Structure Sheet (Per Structure) 5.23 Miscellaneous Drainage Detail Sheets 5.24 Lateral Ditch Plan/Profile (Not applicable to this project) 5.25 Lateral Ditch Cross Sections (Not applicable to this project) 5.26 Retention/Detention Ponds Detail Sheet 5.27 Retention Pond Cross Sections 5.28 Cross-Section Pattern Sheet (Not applicable to this project) 5.29 Roadway Soil Survey Sheet 5.30 Cross Sections Packet Pg. 599 5.31 Traffic Control Plan Sheets 5.32 Traffic Control Cross Section Sheets (Not applicable to this project) 5.33 Traffic Control Detail Sheets 5.34 Utility Adjustment Sheets 5.35 Selective Clearing and Grubbing (Not applicable to this project) 5.36 Erosion Control Plan 5.37 SWPPP 5.38 Project Control Network Sheet 5.39 Environmental Detail Sheets (Not applicable to this project) 5.40 Utility Verification Sheet (SUE Data) 5.41 Quality Assurance/Quality Control 5.42 Supervision 6 DRAINAGE ANALYSIS The CONSULTANT shall analyze and document Drainage Tasks in accordance with applicable manuals, guidelines, standards, handbooks, procedures, and current design memorandums. The CONSULTANT shall be responsible for designing a drainage and stormwater management system. Design work shall comply with the requirements of the appropriate regulatory agencies and the FDOT’s Drainage Manual. The CONSULTANT shall develop a drainage map based upon available information and field reviews. The available information should consist of old Florida Department of Transportation Plans, USGS Quadrangles, USGS Studies, NWFWMD Studies, FEMA Studies, Local Government Agency Studies or Contours, etc. The drainage map should be included in the Hydraulic Design Study. The Hydrology should be by regional or local regression equations, or by the rational method. An assumed velocity should not be used. The CONSULTANT shall document the Drainage Design in the Drainage Design Study. The Design Study should show that the design requirements of the COUNTY, FDOT and FAA have been met. The CONSULTANT has the responsibility for determining the need, appropriate locations, and sizes for water management facilities, and drainage outfalls. The CONSULTANT shall refer Phase I – NEPA Environmental Assessment for Packet Pg. 600 preliminary pond sites studied. The CONSULTANT shall be advised that pond locations must be located within the footprint of the Phase I – NEPA Environmental Assessment. The CONSULTANT shall evaluate the need for diversion ditch systems along the project length to prevent comingling of overland runoff with roadway runoff in order to minimize pond sizings. The CONSULTANT shall provide the COUNTY a Drainage Design Documentation. The documentation shall include a narrative description of existing and proposed drainage structures, conditions, and facilities, and a listing of environmental regulatory permits required. Hydrologic and hydraulic drainage computations for the design presented in the plans shall be included along with supporting design information such as drainage maps, geotechnical data (such as soil borings and permeability tests), and correspondence that directly affected design decisions. The CONSULTANT shall coordinate fully with the appropriate permitting agencies and the COUNTY’s staff. Activities and submittals should be coordinated through the COUTNY’s Project Manager. The work will include the engineering analyses for any of the following: 6.1 Determine Base Clearance Water Elevation Analyze, determine, and document high water elevations which will be used to set roadway profile grade. Determine surface water elevations at cross drains, floodplains, outfalls and adjacent stormwater ponds. Determine groundwater elevations at intervals between the above-mentioned surface waters. 6.2 Pond Siting Analysis and Report Update Pond Siting Analysis and Report done in the Phase I – NEPA Environmental Assessment. 6.3 Design of Cross Drains Analyze the hydraulic design of cross drains. Check existing cross drains to determine if they are structurally sound and can be extended. Document the design as required. Determine and provide flood data as required. 6.4 Design of Roadway Ditches Design roadway conveyance ditches. This includes determining ditch cross sections, grades, selecting suitable channel lining, designing the side drain pipes, and documentation. 6.5 Design of Outfalls Analyze and document the design of ditch or piped outfalls. (Pond outlet structure included in task 6.6) Packet Pg. 601 6.6 Design of Stormwater Management Facility (Offsite Pond) Design stormwater management facilities to meet requirements for stormwater quality treatment and attenuation. Develop proposed pond layout (shape, contours, slopes, etc.), perform routing calculations, and design the outlet control structure. 6.7 Design of Stormwater Management Facility (Roadside Ditch as Linear Pond or Infield Pond) (Not applicable to this project) 6.8 Design of Flood Plain Compensation Area Determine flood plain encroachments, coordinate with regulatory agencies, and develop proposed compensation area layout (shape, contours, slopes, etc.). Document the design following the requirements of the regulatory agency. 6.9 Design of Storm Drains Develop a “working drainage map”, determine runoff, inlet locations, and spread. Calculate hydraulic losses (friction, utility conflict and, if necessary, minor losses). Determine Design Tailwater and, if necessary, outlet scour protection. 6.10 Optional Culvert Material Determine acceptable options for pipe materials. 6.11 French Drain Design (Not applicable to this project) 6.12 Drainage Wells (Not applicable to this project) 6.13 Drainage Design Documentation Report Compile drainage design documentation into report format. Include documentation for the drainage design tasks and associated meetings and decisions, except the Pond Siting Analysis Report. 6.14 Bridge Hydraulic Report (Not applicable to this project) 6.15 Temporary Drainage Analysis (Not applicable to this project) 6.16 Cost Estimate 6.17 Technical Special Provisions (Not applicable to this project) 6.18 Other Drainage Analysis (Not applicable to this project) 6.19 Field Reviews Packet Pg. 602 6.20 Technical Meetings 6.21 Quality Assurance/Quality Control 6.22 Independent Peer Review (Not applicable to this project) 6.23 Supervision 6.24 Coordination 7 UTILITIES The CONSULTANT shall identify utility facilities and secure agreements, utility work schedules, and plans from the Utility Agency Owners (UAO) ensuring no conflicts exist between utility facilities and the COUNTY’s construction project. The CONSULTANT shall certify utility negotiations have been completed with arrangements made for utility work to be undertaken. 7.1 Kickoff Meeting (Not applicable to this project) 7.2 Identify Existing UAO(s) Identify utilities in the corridor; check with Maintenance for Permits, Sunshine State One Call, Subsurface Utility Engineering (SUE) Report, Design Location Survey, and Existing Plans. 7.3 Make Utility Contacts First Contact: Send letters and two sets of plans to each utility, one set for the utility office, one set each to construction and maintenance if required. Includes contact by phone for meeting coordination. Request type, size, location, easements, cost for compensable relocation, and justification for any utility exceptions. Include the meeting schedule (if applicable) and the design schedule. Include typical meeting agenda. Second Contact: At a minimum of 4 weeks prior to the meeting, the CONSULTANT shall transmit two complete sets of Phase II plans to each UAO having facilities located within the project limits, and one set to the COUNTY Offices as required by the District. Third Contact: Identify agreements and assemble packages. Send agreements, letters and two sets of plans to the UAO(s) including component sets, one set for the utility office, one set to construction and maintenance if required. Include the design schedule. Not all

Download this text file with its original spacing ↓