READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — November 5, 2013 — MX-2300N_20131206_113342 — reading text
Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 14-MX-2300N_20131206_113342.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
TASK ORDER APPROVAL FORM
C14-2117-TDD
CONTRACT #:
TASK ORDER #: 1
TASK ORDER AMOUNT: $_5!06,108.00
OFFERED BY CONSULTANT:
TAYLOR EGINEERING, INC.
FIRM'S NAME
Kenneth R. Craig
REPRESENJAT a NAME
SIGNATURE
Vice President
November 27, 2013
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
SIGNATURE
L berm 7 DD Direc “
TITLE
fe-~C=25
DATE
Cen Joy
COUNTY ADMINISTRATOR (if applicable)
/ 246 /; z
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e $25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved by
Purchasing Directorand County sy
Administrator
e In excess of $50,000 approved by the Board.
Clie por:
UREAASING DIRECTOR
J2 /t VP
DATE
CHAIRMAN (if applicable)
DATE
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 17, 2013
TO: Honorable Chairman and Members of the Board
FROM: Rick Owen
SUBJECT: Veterans Park Living Shoreline - Preliminary Design and Environmental
Permitting
DEPARTMENT: _ Tourist Development Department
BCC DISTRICT: ALL
STATEMENT OF ISSUE: Staff requests the Board approve and authorize the Chairman to
sign Task Order #1, contract C14-2117-TDD with Taylor Engineering in the amount of
$106,108.00 for preliminary engineering design, coastal engineering analysis, natural resources
survey, and permit application assistance to pursue regulatory authorizations for Phase I of the
living shorelines project for Veteran's Park.
Staff also requests that the Board authorize staff to pursue any and all grant/funding
opportunities for this project.
BACKGROUND: The Choctawhatchee Bay shoreline along Veteran's Park is experiencing
long term chronic erosion. This erosion is responsible for loss of valuable property with the
resultant loss of recreational opportunities and loss of upland resources and habitat. Staff
proposes a "soft", living shorelines approach to counter this erosion. This approach has been
successful in countless areas and will create educational and tourism related opportunities as
well. Also, in beginning the permitting process we can position this project in a more favorable
position for National Resource Damage Assessment, RESTORE and other funding opportunities.
OPTIONS: Approve/Disapprove
RECOMMENDATIONS: Approve and authorize the Chairman to sign Task Order #1, contract
C14-2117-TDD with Taylor Engineering in the amount of $106,108.00 for the preliminary design
and environmental permitting of the Veteran's Park living shoreline project and authorize staff to
pursue grant/funding opportunities for this project.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
TOURIST DEVELOPMENT DEPARTMENT |
ATTORNEY APPROVAL FORM
CONTRACTOR NAME: TAYLOR ENGINEERING
CONTRACT #: C14-2117-TDD
TASK/PURCHASE ORDER #: 1
Phase I Preliminary Design &
Environmental Permitting Assistance
TASK/PURCHASE ORDER AMOUNT: NOT TO EXCEED $106,108
I have reviewed the above-referenced task/purchase order and find it to be in
compliance with the terms of the contract, Tourist Development Department
Operations & Procedures Manual, the Okaloosa County Purchasing Manual and
applicable local, state and federal laws, rules and regulations.
(Initial applicable authorization)
LH This approval authorizes the goods/work described in the attached Task or
Purchase Order to be performed or acquired.
This approval authorizes the goods/work described in the attached invoice(s)
to be processed for payment.
APPROVED AS TO FORM AND LEGALITY:
“FS
TDD ATTORNEW CD
LYNN M. HOSHTHARA
PRINT NAME
12 for [13
DATE
EXHIBIT A
Scope of Work
For
OKALOOSA COUNTY PROJECT GREENSHORES
PHASE I PRELIMINARY DESIGN AND
ENVIRONMENTAL PERMITTING ASSISTANCE
INTRODUCTION
Taylor Engineering presents this scope of work and cost estimate to Okaloosa County (“County”) for
coastal engineering analysis, preliminary engineering design, and permit application assistance to pursue
regulatory authorizations for Phase I of the Project Greenshores conceptual design. Phase I of the
conceptual design includes all water-dependent improvements — offshore breakwaters/oyster reefs, public
access pier, existing dock expansion (Marler Park Boat Ramp), water access features (e.g., kayak launch),
and salt marsh restoration. Taylor Engineering staff met with the Florida Department of Environmental
Protection (FDEP) and U.S. Army Corps of Engineers (USACE) staff on July 11, 2013 to discuss the
proposed project and potential permitting requirements for the first phase. Following this meeting, Taylor
Engineering performed background data collection and natural resource investigations to further refine
the project conceptual design. This scope of work addresses the analysis, design, and permitting
requirements as discussed with regulatory staff.
ASSUMPTIONS
We have developed this scope of work with the following assumptions:
« Access to the proposed improvements will be through the existing Marler Park.
* A concrete floating dock/breakwater will comprise the proposed public access pier.
* Project design and permitting will not include installation of a marina fuel system or sewage
pumpout facility.
« The proposed improvements will not require dredging or underwater debris removal.
« The proposed access pier design will not require or include construction of a shoreline bulkhead
structure.
« Wetland delineation and habitat characterization work will only include the shoreline and wetland
areas in the immediate area of the proposed shoreline restoration.
« The permit application will not include any upland development component. Therefore, the FDEP
will receive and initially review the application. The FDEP will determine whether FDEP or the
Northwest Florida Water Management District (NWFWMD) will ultimately provide final permit
review. Given the water-dependent features, we assume FDEP will provide permit review and
processing.
¢ Based on our preliminary conversations with FDEP, we assume water quality testing will not be
required.
¢ Okaloosa County will be responsible for regulatory fees associated with the permits or permit
application reviews.
If any of these assumptions prove incorrect, we reserve the right to modify our scope of work and
associated costs.
ITEMS SUPPLIED BY COUNTY
Taylor Engineering assumes the County will provide the following additional documents:
A-1
* Digital property boundary survey in AutoCAD format including riparian lines, topography,
bathymetry (if available), and any surveyed wetland lines with the same survey data in hardcopy
form certified/sealed by a Florida-licensed Professional Land Surveyor.
* Digital master plan drawings of the County property in AutoCAD format showing all leased
property boundaries, existing uses, conservation/protected areas, proposed improvements, etc.
* Copies of existing regulatory authorizations associated with the project site or proposed
improvements (e.g., Marler Park Boat Ramp, Marler Park Boat Parking Improvements, etc).
* Copies of existing County easements across neighboring properties between the proposed project
site and the Gulf Islands National Seashore (GINS).
* Any available additional studies, investigations, or preliminary designs completed for the County
property.
* Any available geotechnical soil borings collected for construction projects on County property,
whether on land or in water.
If any of the above items are unavailable and engineering design or permit applications require such
items, Taylor Engineering may prepare an additional scope of work and fee request to collect the
necessary supporting data or complete the required supporting studies.
The following tasks comprise this scope of work.
TASK 1 — Coastal Conditions Analysis
Taylor Engineering will prepare a coastal conditions analysis to define key design parameters at the
proposed project site. The first step in the analysis will be to compile existing site-specific information
such as tidal datums, storm surge elevations, historic wind records, and existing bathymetric data. We will
use this information to estimate the wind-generated waves at the site for varying-level storm events based
on empirical wave modeling. The results of the study will provide critical design parameters for varying-
level storm events. The analysis will provide the information necessary to optimize the waterfront
structures (€.g., Orientation, crest heights, etc.) and allow the County to accurately assess the risks
associated with varying design conditions.
TASK 2 — Hydrodynamic Assessment
FDEP has stated in preliminary consultations that they will likely require a hydrographic assessment to
demonstrate that tides and currents reduce the concentration of a conservative pollutant introduced into
the project area by 90% within 96 hours. Taylor Engineering will further refine its existing in-house
hydrodynamic numerical models of the area and the adjacent waters to predict whether a potential
pollutant released within the proposed project area will meet the State’s criteria. The modeling analysis
will include a field effort to record tidal elevations and tidal velocities; this field work will support
calibration of the model as necessary to validate our results to the permitting agencies. We assume FDEP
will accept model calibration based on recorded current measurements. The hydrodynamic modeling will
also take into account the proposed breakwater structures. Taylor Engineering will complete the required
hydrographic assessment and prepare a report summarizing the findings. The report will serve as a key
component to the permit application.
We will confirm the requirement for this study at the pre-application conference. If the lead state agency
does not require this study, we will submit a change order to eliminate the hydrographic assessment from
the scope of work.
A-2
TASK 3 — Coastal Engineering Analysis
In addition to the hydrodynamic assessment under Task 2, FDEP has also stated numerical wave and
sediment transport modeling will likely be required to estimate the proposed breakwater structure
performance and the resulting sediment transport response landward of the structures. As such, Taylor
Engineering will perform additional hydrodynamic simulations of the proposed breakwater structures and
project area to determine the change in the sediment transport potential resulting from the structures. The
results of the investigations will provide FDEP with necessary information regarding the potential
changes resulting from the proposed structures.
Taylor Engineering will also develop a CGWAVE wave evolution model for the project area. CGWAVE
is a U.S. Army Corps of Engineers (USACE)-developed finite element wave propagation model that
includes wave refraction, diffraction, and reflection processes in the solution. The model will provide
insight into wave transformation effects along the project site and provide critical information for the
offshore structure design.
We will prepare a design document summarizing the modeling procedures and results of the sediment
transport potential and wave propagation modeling.
TASK 4 — Preliminary Engineering Design and Permit Drawings
Based on the results of previous background data collection, natural resource investigations, and Tasks |
- 3 above, Taylor Engineering will develop a preliminary design for the Project Greenshores in-water
structures and waterfront components. We anticipate this preliminary design to consist of a pile-supported
dock extension near the existing boat ramp; a combination floating pier/breakwater, a pile-supported pier
shore connection, and a gangway to connect the fixed pier to the floating pier/breakwater; offshore rock
breakwaters/oyster habitat; and the saltmarsh restoration areas. In addition, the County desires an
additional waterfront access structure (e.g., kayak launch area) which we anticipate to have minimal
structural components. Based on regulatory guidance, we will design the structures and