READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 07-23-13--special---alconese rezoning — reading text

Part 9 of 30. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-32058-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Pa etola STATE Or FLORIDA OEPAaTMEW or TPo SPOATATroN FEN SUPPLEMENTAL NO. 428097- 1 - 38 01 - 842809]- 1 - 5 & 01 LOCAL AGENCY PROGRAM 1 SUPPLEMENTAL CONTRACT NO. DUNS AGREEMENT A0200 80- 939- 7102 desiresdesires toto supplement supplement thethe TheThe DeDe arlmarlm ff TrTr nsns orladoorlado asas IdentifiedIdentified above.above. AllAll provisionsprovisions inin thethe originaloriginal originaloriginal AgreementAgreement enteredentered intointo andand executedexecuted onon SeptemberSeptember 99 20102010 Agreement Agreement andand supplements,supplements, ifif any,any, remainremain inin effecteffect exceptexcept asas expressly expressly modified modified byby thisthis supplementsupplement TheThe changeschanges toto thethe AgreementAgreement andand supplementssuppl , ements, itit any,any, areare described described asas fol ows:fol ows: PROJECT PROJECT DESCRIPTIONDESCRIPTION LengthLength 1.1. 367367 milesmiles NameName WahlWahl PaIPaI SidewalksSidewalks Termini From SR 30 IUS IUS 98 98 to SIR a93 (Mary Ether to SIR Ether Blvd Blvd De lion of Work: The project is to construct sidewalk along Wright Parkway to fill gaps on both sides between SR 30 and SR 393. Reason for Supplpment ad auto2origio engineenri andfor cost analysis: Local Agency Program Agreement funding is being increased to due recent bid amounts. The responsive low bidder was over the amount originally programmed for construction. P S' d.2. d I= RJOUCrIOry SUPPORT 09tl: Poor 2 Ot 3 ADJUSTED EXHIBIT B SCHEDULE OF FUNDING STATE Or FLORIDA OFFARTNV1 OF TRANSFOWATON FPN '.. SUPPLEMENTAL NO LOCAL AGENCY PROGRAM 428097- 1 - 3 8-01 & 4280974 -5 & 01 1 SUPPLEMENTAL CT NO. AGREEMENT DUNS NO. A0200AQ200 80- 939 -7102 FUNDING TYPETYPE OFOF WORKWORK 3)3) 4) 6)6) u 1) TOTALTOTAL STATE&STATE& ByBy FiscalFiscal YearYear PREVIOUS TOTAL PROJECT FUNDS PROJECTFUNDS ADDIT121IONAL CURRENTCURRENT TCTALTCTAL PROJECTPROJECT FUNDSFUNDS TOTALFUNDS AGENCY FEDERALFEDERAL FUNDSFUNDS 0 PlanniFY'FYF: Y:.ng FY: Project Development 8 Total Planning Cost 0.00 0, 00 soCo 000 0.00 a9NnTAY`l3 dn Environment (PD& E) ton 3 FY:FY: Total POSE Cost 0. 0. 0.0 O V04r 0. 00 16369W Daaign FY: 2010 -2011 1636900 000 16362. 00 mH 0 FY:FY!FYF: Y: aR Q 1 69. 0 00 1 369. 00 0. l D. n Cost nei FFY: 0N l Ri ht -ot-Wa Cost 00 dOCNEarIQ FY: n20122-013 3 -2014 163681. 00

Download this text file with its original spacing ↓