AWARD: Transfield Services will consider award of the Contract to the bidder
Contract # 4600001084- Page 5 of 17
4.i:a
submitting the lowest responsive and responsible bid. Transfield Services reserves the
right to reject any or all bids, when doing so would be in Transfield Services' best
interest.
If the contract is not awarded to the low bidder for any reason, award may be made to
the next lowest responsive bidder. The work may be re- advertised, re -bid or
TRANSFIELD SERVICES may take any other course of action, which is determined solely
by Transfield Services cm
q
2. EXECUTION OF CONTRACT: The successful bidder shall execute and return the
necessary contract documents within 30 calendar days of award. No bid award will be
considered binding upon Transfield Services until the execution of the contract by
Transfield Services
Zrn
Transfield Services will endeavorto execute the contract within 5 days aftertimely
receipt of the executed Contract and /or other necessary or requested documents from p
the Contractor.
Failure of the Contractor to execute and /or provide all required documents within the O
time limits specified may result in award to another Contractor.
au
3. AUTHORITY OF THE PROJECT MANAGER: The administration of this project for Z
Transfield Services shall be through its Project Manager, who may act either directly or rn
o
through duly authorized representatives. The Project Manager will inspect and evaluate
the work of the Contractor for general conformity to the Contract. All work shall be
done to the satisfaction of the Project Manager. _
r
The Project Manager will decide all questions which may arise as to 1) the quality and
acceptability of work performed; 2) the rate of progress of the work; 3) the
interpretation of the Contract; and 4) the acceptable fulfillment of the Contract on the c
part of the Contractor. The Project Manager shall have the authority to alter work
priorities in order to address special needs of Transfield Services or to enforce and make
effective such decisions and orders as deemed necessary if the Contractor fails to 0
diligently carry out the work in accordance with these Contract Documents. U
Work shall be subject to periodic daily inspection. The quality and acceptance of
workmanship will be determined during these inspections. Areas that are determined z
to be unacceptable shall be re- worked by the Contractor at no additional cost to n
Tra nsfield Services The Project Manager will use reasona ble judgment when evaluating a
completed work and any decision as to acceptance or rejection will be final.
mN
During the prosecution of the work, the Project Manager may have the right, but not
the obligation to suspend the work, wholly or in part, due to failure of the Contractor to
1) correct conditions unsafe for the workers, or the general public 2) for failure to carry
out provisions of this Contract 3) failure of the Contractor to suspend operations due to
unsuitable weather 4) and other conditions or reasons deemed to be in the public' s H
interest. Suspension of work under this provision shall not be grounds for additional LL
compensation to the Contractor.
Transfield Services reserves the right to perform any type of highway maintenance cmE
within the limits of the work, including concurrent work by Transfield Services or other m
Transfield Services Contractors. Concurrent work may include the type of work noted in
these Contract Documents.
2a
4. COMMENCEMENT OF WORK: The Project Manager will issue a Work Order notifying
the Contractor to proceed with the work. The Contractor shall begin work no later than
Contract # 4600001084- Page 6 of 17
4. 1. a
fourteen ( 14) calendar days after the issue date of the initial Work Order. The
Contractor shall begin work no later than five ( 5) calendar days after the issue date of
subsequent Work Orders.
Unless otherwise specified or noted in the Work Order or Special Provisions, all Work
Orders must be complete WITHIN 14 CALENDAR DAYS.
If the Contractor begins work prior to the limits noted above, Work Order completion
time will begin to accrue when the Contractor begins work.
The Project Manager will schedule a Pre Work conference to review the work to be
done and the requirements of the Contract prior to issuing the initial Work Order. At
the pre -work or earlier, the Contractor shall submit to the Project Manager for review
two ( 2) copies of the Contractor' s proposed work plan and methods for performing the
required work including a listing of equipment (Attachment C) and anticipated
personnel.
5. LIQUIDATED DAMAGES: Liquidated damages of $250 /Calendar Day ( subject to
adjustment, see the Special Provisions) may be charged against the Contractor for each
calendar day beyond that provided in the Work Order, in which the work remains
incomplete. These charges are not a penalty, but both parties agree, fairly represent the
cost of administration, engineering, supervision, inspection, and other TRANSFIELD
SERVICES expenses related to the Contract.
If the contractor fails to meet the performance standards identified in the contract, in
addition to the liquidated damages, the contractor will be responsible for any penalties
imposed by DOT on TRANSFIELD SERVICES resulting from these failures. In addition,
TRANSFIELD SERVICES may take steps to have the work corrected. Once the contractor
is notified that TRANSFIELD SERVICES is taking corrective action, the contractor shall
refrain from performing work on the item in question unless approved by the Project
Manager. The costs associated with these measures will be at the Contractors sole cost
and expense and will be deducted from any monies due the contractor, if any, or repaid
to TRANSFIELD SERVICES, by the Contractor, within 20 days.
6. WORK ACCEPTANCE: Upon completion of the assigned work the Contractor will notify N
the Project Manager or his or her designee that the work is complete and the work
quantities and quality were accomplished in accordance with the Contract work order.
The work order will be reviewed and signed by both the Contractor and Transfield y
Services on the day the work is completed. All completed work will be reviewed to verify a
quality and quantity, prior to accepting the Contractor's work and signing the Work
Order. The Contractor will submit a copy of the signed work order with its invoice for m
payment. The Contractor shall execute the contract "Close -out and Release Form ", as F
part of final payment procedure, or annual renewal. v
The Contractor agrees that Transfield Services' inspection, review, acceptance, approval,
or payment for the Contractor' s work shall not relieve the Contractor of the Contractor' s r
or Sub- Contractor' s of any tier) sole responsibility for the work, including latent defects LL
in material and /or application, workmanship, use, quality, or Contractor's negligent acts,
errors, omissions, or Contractor' s improperly performing or improperly failing to E
perform the work under this contract.
rVN
7. MATERIALS: All materials shall conform to applicable sections of the Florida C
Department of Transportation ( FDOT) Standard Specifications for Road and Bridge
Construction ( Latest edition), as amended and supplemented, unless otherwise
specified in the Special Provisions.
Contract # 4600001084- Page 7 of 17
F- 4.1. a
Used, reconditioned, or remanufactured supplies shall not be utilized unless otherwise
specified or approved in writing by the Project Manager.
Any and all salvageable materials within the limits of each work site shall be utilized in
that work site at no additional cost. If not used, the material becomes the property and
responsibility of the Contractor.
8. TRAFFIC CONTROL: The Contractor is responsible for work site safety and work zone
traffic control. All traffic control devices shall conform to and be placed in accordance
with the requirements of Part VI of the U. S. DOT Manual on Uniform Traffic Control
Devices ( MUTCD). For operations requiring closure of travel lane( s), Contractor shall
comply with the, Worksite Traffic Supervisor, Department of Transportation Standard
Index 600 series of the Roadway & Traffic Design Standards, latest edition.
Transfield Services will fully enforce all Traffic control provisions; no deviations from the
manual are expected or will be permitted unless otherwise approved in writing by the
Project Manager.
The Contractor shall furnish any traffic control devices, including law enforcement
supports when required, and temporary sign panels, necessary to perform this work and
shall be responsible for their cost, placement, proper maintenance, and removal.
In addition to mainline signing, proper signs shall be displayed on all affected ramps
prior to the start of operations in interchange areas.
For work orders requiring maintenance of traffic, the Contractor shall submit to
the Project Manager for review, prior to beginning work, two (2) copies of their
proposed traffic and safety plan. The Contractor' s safety and traffic