READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 15, 2013 — Task Order#13_ATCT Design-Bidding-Permitting Services — reading text

Part 3 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 78-Task Order_13_ATCT Design-Bidding-Permitting Services.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Requests For Additional Information received from the FDEP. Upon completion of the project, RS&H shall prepare the Certification of Completion packages for both the water and sewer permits to turn the systems over for operation. Task B.2.5 National Pollutant Discharge Elimination System Permitting (NPDES): RS&H will prepare the stormwater Pollution Prevention Plan (SWPPP) and the Notice of Intent (NOI) application as required by DEP for NPDES permitting. Task B.2.6 US Army Corp of Engineers Section 404 Permit: RS&H will prepare and submit an application for a Section 404 with the USACE for wetlands. The permit set will contain plans and details necessary for the horizontal improvements proposed. Task B.3.0 Wetland Mitigation and Permitting Assistance Task B.3.1 Wetland Mitigation Identification / Flag Wetland in Project Area. RS&H will perform site investigation to review potential mitigation areas and flag wetland jurisdictional line within project limits. The A/E will investigate existing on-Airport wetlands for use as mitigation. Task B.3.2 NWFWMD Field Review Meeting. RS&H will meet individually onsite with the NWFVWMD to review project area and coordinate mitigation area. Task B.3.3 USACE Field Review Meeting. RS&H will meet individually onsite with the USACE to review project area and coordinate mitigation area. Task B.3.4 Request For Additional Information (RAI) Response. RS&H shall respond to one Request for Additional Information (RAls) for USACE 404 Permit and NWFWMD Environmental Resource Permit. Project Team: The project team is comprised of these firms and their role: 1. RS&H- Prime Architect/Engineer 2. Air Traffic Consulting Service — Air Traffic Control Tower (ATCT) Specialist 3. NOVA Engineering and Environmental ~- Geotechnical Investigation 4. Gustin, Cothern & Tucker, Inc. ~ Surveying and Utility Locates Meetings: The AVE will prepare for and attend the following meetings (all meeting are in Destin except as noted): 1. Design Kickoff Meeting 2. Design Development (60% CD) Review Meeting 3. Construction Document (90% CD) Review Meeting 4. Pre-Bid Meeting 5. Bid Opening 6. Pre-Application Permit meeting with City of Destin 7. Pre-Application Permit meeting with USACOE 8. Pre-Application Permit meeting with NWFWMD ' 9. Field Meeting with USACE 10. Field Meeting with NWFWMD Destin Airport Air Traffic Control Tower Design, Bidding and Permitting Services Page 6 Deliverables: The AVE will provide the following deliverables: 1. Six paper copies of the following packages: « Schematic Design Package e Design Development Package e Construction Documents 7460 / Tower Communications Package Wetland Mitigation Plan with Boundary Survey Drawing Permits with City of Destin, USACE, NWFWMD, FDEP, NPDES One electronic copy of each Deliverable in a *.pdf or *.dwg format: Minutes of all meetings OaArAN Proposed Schedule: NTP from Okaloosa County Design Kickoff (month 1) Complete Geotechnical Investigation (month 2) Complete Survey (month 2) Submit Programing Study/Estimate (month 3) Submit Design Development Plans (60% CD)/Specs/Estimate (month 6) Design Development Review Meeting (month 6) Submit 7460 to Obtain FCC Frequencies (month 6) Submit Tower Communications Package (month 6) Submit Stormwater Permit (month 6) Submit 90% Construction Document Plans /Specs/Estimate (month 10) Construction Document Review Meeting (month 10) Submit Bid Plans (month 11) Pre-Bid Meeting (month 11) Bid Opening (month 12) End of Proposal Destin Airport Air Traffic Control Tower Design, Bidding and Permitting Services Page 7 RSH HUPROVING YOUR WORLD Reynolds, Smith and Hills, Inc, Proposed ATCT Location Propose Access Road CARINE Te FUTILE A aber (eames Leah _ . raven ells) Hutu pet 8 a mudauater v FUTURE AIR RAFF —. coeiyeoR HOTA B NEM EGEATION HATE AD oat ———— BONE AIC cn Bp Kone Seinen . a Exhibit 1: Site Plan RS‘ DESTIN AIRPORT . AIR TRAFFIC CONTROL TOWER IMPROVING YOUR WORLD TASK ORDER 13 PERMITTING, DESIGN AND BIDDING SERVICES SUMMARY BASIC SERVICES Totals A. SCHEMATIC DESIGN Basic Services $68,280 Subconsultant Services $19,175 Subtotal $87,455 A.2. DESIGN DEVELOPMENT Basic Services $83,274 Subtotal $83,274 A.3 CONSTRUCTION DOCUMENTS Basic Services $143,441 Subtotal $143,441 A4 BIDDING Basic Services $22,742 Subtotal $22,742 BASIC SERVICES - TOTAL $336,913 SPECIAL SERVICES B.1. AIR TRAFFIC CONTROL TOWER SPECIALIST Subconsultant Services $30,000 Subtotal $30,000 B.2. PERMITTING SERVICES - SITE AND UTILITIES Basic Services $41,637 Subtotal $41,637 B.3. PERMITTING SERVICES - WETLAND MITIGATION Basic Services $15,653 Subtotal $15,653 SPECIAL SERVICES ~ TOTAL $87,290 GRAND TOTAL LUMP SUM FEE $424,203

Download this text file with its original spacing ↓