READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 6, 2013 — Lord & Son Contract with Exhibits & Internal Coordination Sheet — reading text
Part 11 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 116-Lord _ Son Contract with Exhibits _ Internal Coordination Sheet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
buildings located in a courtyard between Building “G” and “C”. They are to remain
in their location with utilities connected.
Roofing on all buildings will be torn off, decking replaced as needed and new roofing installed. (Exception:
Building “G” and “E” will not be re-roofed). The required roofing system is to be a Styrene-Butadiene-
Styrene (SBS) modified bituminous membrane system with roofing insulation. System must have a 20-
year warranty (from date of substantial completion; Roofers installation warranty shall be for 2 years from
substantial completion.
QO
A.2.5
Structural (limited, if needed)
Electrical
Mechanical, Plumbing
Landscape Architecture
A.2.6
Judicial Design Consultant
Security Planning
Associate Architect
EXHIBIT BB
Consultants
TBD
Humber-Garick Consulting Engineers
142 Eglin Parkway, SE
Fort Walton Beach, FL 32548-5545
David H. Melvin, Inc.
Consulting Engineers
P.O. Box 840
Marianna, FL. 32447
Horton Land Works
4151 Commons Drive West, #5413
Destin, FL 32541
DLR Group
100 East Pine Street, Suite 404
Orlando, FL 32801
Stokes Architectural, Inc.
9 Miracle Strip Pkwy., SW
Fort Walton Beach, FL 32548
