READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 6, 2013 — Lord & Son Contract with Exhibits & Internal Coordination Sheet — reading text

Part 11 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 116-Lord _ Son Contract with Exhibits _ Internal Coordination Sheet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

buildings located in a courtyard between Building “G” and “C”. They are to remain in their location with utilities connected. Roofing on all buildings will be torn off, decking replaced as needed and new roofing installed. (Exception: Building “G” and “E” will not be re-roofed). The required roofing system is to be a Styrene-Butadiene- Styrene (SBS) modified bituminous membrane system with roofing insulation. System must have a 20- year warranty (from date of substantial completion; Roofers installation warranty shall be for 2 years from substantial completion. QO A.2.5 Structural (limited, if needed) Electrical Mechanical, Plumbing Landscape Architecture A.2.6 Judicial Design Consultant Security Planning Associate Architect EXHIBIT BB Consultants TBD Humber-Garick Consulting Engineers 142 Eglin Parkway, SE Fort Walton Beach, FL 32548-5545 David H. Melvin, Inc. Consulting Engineers P.O. Box 840 Marianna, FL. 32447 Horton Land Works 4151 Commons Drive West, #5413 Destin, FL 32541 DLR Group 100 East Pine Street, Suite 404 Orlando, FL 32801 Stokes Architectural, Inc. 9 Miracle Strip Pkwy., SW Fort Walton Beach, FL 32548

Download this text file with its original spacing ↓