Attorney on the second floor, and the Growth Management Department on the first floor. As the renovation
plan is completed for the Shalimar Courthouse Annex, those in rented offices that are not going to the Shalimar
Courthouse Annex will be considered for relocation to the old FWB Hospital. The roof has reached the end of
its useful life. The elevator must be repaired to comply with the ADA requirements. Phase I remodeling work
will be limited to the 2-story portion of the facility. If the Board agrees, $500,000 will be needed in Fiscal Year
2014 for this phase of the project, which may be included in the Board’s anticipated debt service for the
Shalimar Courthouse Annex.
Public Works
Parks. The Parks Division is responsible for improving and maintaining 59 park properties in accordance with
the Parks Master Plan. Funding for park improvements is derived through general fund allocations for County
parks, Tourist Development Department (Fiscal Year 2013 amount was $491,719) for tourist related parks and a
Parks Municipal Service Taxing Unit (MSTU) for unincorporated parks. Recent MSTU projects include
extensive work on the old Essex treatment plant site (Don and Susan Stillwell Park) construction of a 210 foot
long wood boardwalk at Laurel Hill Park, and work on the new Parks storage property on Cavalier Dr. In
addition, County Park improvements include: Shoal River Park sewer upgrades, pier repairs at Marler Boat
Ramp, and new boat ramp at Shoal River Park. Recreation development grants, which previously provided a
source of funding for park improvements, continue to dwindle and are not considered a viable revenue source.
For Fiscal Year 2014, the Parks Division has identified park improvements in the following areas:
• Baker Recreation Center (adjacent to Mill Creek Subdivision) fencing along north property and
Page 27
upgrades to existing playground equipment - $40,000 (County Park)
• Beach Accessway Improvements at #1 Soundside Phase II - $40,000 - repairs to wood boardwalk (deck
and railings) (County Park)
• Cotton Bridge Park - $10,000 – replace rubber surfacing under play equipment (County Park)
• Don Stillwell Park Phase III (Garnier’s Plant Site) - $100,000 (Unincorporated)
• Wilderness Landing - $106,000 (Unincorporated)
• Neighborhood Park (site to be determined) -$200,000 (Unincorporated)
• Silver Oaks Park - $250,000 play equipment and wood boardwalk – (Unincorporated)
• Laurel Hill/Dorcas (Highway 393) - $40,000 – small play structure with rubber surfacing
(Unincorporated)
• Holt Park – $200,000 (Unincorporated)
• Laurel Hill Rails to Trails (Old railroad right-of-way) - $10,000 - upgrade railroad bed for walking trail,
benches, trail head parking and port-o-let (Unincorporated)
The Florida Boating Improvement Program (FBIP) continues to be a source of funding to provide water
recreation facilities. This revenue funds replacement of “No Wake Zone” signs and pilings, repair and
maintenance of boat ramps, and support facilities. In addition, it provides funding for the Derelict Vessel
Removal Program. FBIP can also provide allocations up to $15,000 for local municipalities within Okaloosa
County for various approved projects.
Solid Waste Program Public Works’ challenge in Fiscal Year 2014 will be to continue monitoring two solid
waste contracts, increase recycling participation, and work toward the goal of reducing long-term care and
maintenance costs for the three closed landfills, which totals approximately $875,000 annually. In Fiscal Year
2013, Public Works moved forward with a plan to expand its control over the municipal solid waste stream in
unincorporated Okaloosa County by conducting a public hearing giving notice of its intent to franchise
commercial garbage collection in the year 2016. This would provide Okaloosa County control of
approximately 50 percent of the waste stream, thereby positioning the County to competitively bid all solid
waste services to begin upon termination of the existing contracts on March 31, 2016. This bid will include
enhanced recycling, commonly called “1-1-1”, for all residents within the County’s five franchise areas. The
ultimate goal is to increase recyclable collections from the residential and commercial waste stream in an effort
to comply with the State mandated recycling goal of 75 percent by 2020.
Additionally in Fiscal Year 2014, the County will explore opportunities to encourage recycling within the
school district and the construction and demolition debris disposal industry. Yard trash operations will continue
to be managed in-house with the addition of contract grinding at the Wright Yard Trash Facility versus the
replacement ($850,000) of an existing grinder that is in the county inventory. Solid waste and recycling
budgets will be combined into one budget to reduce the administrative duplication of managing two divisions
instead of one. Staff will continue to explore ways to expand household hazardous waste services for local
residents in order to make the service more convenient for residents to dispose of household chemicals. This
may necessitate the creation of two technician positions to operate these services on a full time basis in Fiscal
Year 2015.
Fiscal Year 2013 was a transitional period for the active remediation systems at Baker Landfill (BLF) and
Wright Landfill (WLF). BLF and WLF infrastructure changes made to comply with remedial systems
modifications began in Fiscal Year 2012 and will be completed in Fiscal Year 2013. Cost reductions from these
infrastructure changes will be realized in the Fiscal Year 2014 budget. A slight increase in operation and
Page 28
maintenance costs associated with the remediation systems infrastructure changes is projected in order to
achieve cleanup and operational goals. A reduction in reporting requirements will further reduce the cost of
Long-Term-Care at BLF and WLF.
Private property access continues to be an issue at BLF. The County has groundwater monitoring infrastructure
on four privately owned parcels. Of the four, only one is covered by an access agreement. Two of the
remaining three changed owners in 2012-2013 and the County is actively pursuing access agreements. The
remaining parcel owner is currently in active negotiations with the County for long-term access. If access to
property agreements cannot be secured in Fiscal Year 2013, the County may be forced to abandon six
monitoring wells located on private property and reinstall the wells in a County easement.
Real estate agreements for Niceville Landfill (NLF) and WLF on United States Air Force (USAF) property are
projected to be in place by the end of Fiscal Year 2013. Individual agreements have been approved by the
Board and are awaiting signatures from the USAF. No additional costs will be incurred by the County in the
new agreements. In lieu of property use fees, landscaping and yard debris generated in the USAF cantonment
area at Eglin are processed and repurposed by the County at no cost to the USAF.
The field activities associated with the NLF remediation pilot study will be complete in Fiscal Year 2013. All
costs associated with field operations have been captured in the Fiscal Year 2013 budget. However, reporting
activities and costs could extend into the next fiscal year. County staff was successful in securing a passive
remediation strategy at NLF and the active pilot study remediation system will subsequently be
decommissioned at the end of the test. The passive remediation strategy is Monitored Natural Attenuation
(MNA). MNA has no active environmental cleanup infrastructure. Cleanup goals are achieved by allowing
natural environmental processes to reduce the concentration of contaminants. The County will continue to
assess the existing monitoring well network to validate the reduction in chemical concentrations. Three
additional monitoring wells have been budgeted to be installed in Fiscal Year 2013. However, the installation
of the wells is dependent on an in-place real estate agreement. If the USAF does not execute the real estate
agreement by September 2013, the cost of the well installations will be reflected in the Fiscal Year 2014 budget.
Transportation Okaloosa County maintains 201 miles of dirt roads, 74 miles of cold mix base stabilized roads,
666 miles of paved roads, and 73 bridges and large box culverts. The County accepted approximately 2 miles
of paved roads into the maintenance system in Fiscal Year 2013. The current revenue allocated for capital
transportation projects, including resurfacing and dirt to pave programs, is acquired through the Constitutional
Gas Tax (CGT) and the Local Option Gas Tax (LOGT). Average revenue from these sources in previous years
totaled approximately $3,500,000 per year.
The annual projection for resurfacing has been restructured to reflect pavement preservation and pavement
management techniques. These diverse methods stretch the County’s funding dollars to allow the maximum
benefit per dollar expended. Current funding is $500,000 per year, of which $20,000 per district is available for
other transportation-related expenses to the five districts. The remaining $400,000 allows staff to implement
pavement preservation techniques on roadways throughout the unincorporated areas of the County.
For Fiscal Year 2014, Public Works is planning to resurface over 4 miles of asphalt roads (under a pavement
management/pavement preservation strategy); provide further stabilization and or surface preservation
treatments to existing cold mix stabilized roads, continue the road striping program (under a pavement marking
management structure); and continue with the dirt-to-pave hot mix asphalt program.
Page 29
Existing dirt roads being considered for dirt-to-pave hot mix asphalt paving include Davis Road in Laurel Hill,
Hare Street and Taylor Road in Crestview, and Riley Barnhill Road in Baker. Aging cold mix stabilized roads
that are planned for further preservation and stabilization include Robin Road, Batten Road, Bear Head Road,
Bluebird Lane, and Perry Smith Road. The remaining dirt portion of Fairchild Road in Crestview is currently
under design as a dirt-to-pave project with construction scheduled to begin in Fiscal Year 2014.
Martin Luther King, Jr. and Green Acres Boulevards are being designed for mill and resurface with full depth
reclamation along with various drainage improvements. Mount Olive Road is also being considered for a mill
and resurfacing project. Completion of these projects depends upon gas taxes and will be completed based
upon revenue availability.
For Fiscal Year 2014, the Bridge Section will budget to convert two short length wood bridges (Trawick Creek
at Wilkerson Bluff Road and Turkey Hen Creek at Antioch Road tentatively) to concrete spans. Material costs
to reconstruct both bridges will be budgeted for a total of $200,000 to continue the 20-year program to convert
all wooden bridges to concrete.
During Fiscal Year 2013, Public Works was able to accomplish several much needed roadway improvement
projects. Projects completed during the year include the full depth reconstruction of Antioch Road (from
Brodie Lane to Wilks Drive) and the paving of the remaining dirt portion of Keyser Mill Road (from Skeeter
Lane to Galiver Cutoff). Clear Creek Road and West Plympton Road are dirt-to-pave projects that were also
completed.
From a planning and design perspective, Okaloosa County continues to develop improvement plans for both
Okaloosa Lane and P.J. Adams Parkway. The Federal Highway Administration has received the final review
package from the County, as approved by the Florida Department of Transportation (FDOT), for the Project
Development & Environment (PD&E) Study of