READ ALONGSIDE THE SOURCE
Okaloosa County School Board — Workshop Meeting, April 28, 2025 — reading text
Part 7 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — DG3QMF69F848.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
#44, GMP for Roof Replacement Project, Elliott Point Elementary School
(Phase 1).
Elliott Point Elementary School Roof Replacement Project - This project consists of the removal and replacement of the existing
modified bituminous cap sheet over built-up roofing with 1/2" wood fiber, lightweight concrete decking and corrugated metal form deck
system that covers the main building. The scope of this project consists of only a Phase 1 area at the West end of the building that
covers the kitchen and ten (10) classrooms to the West of the Main Office and Media Center areas. The high roof over the Cafeteria
portion of the building does not require replacement. This Phase 1 tear-off area is approximately 150 squares. A new TREMCO Powerply
Endure BIO 100 roofing system will be installed at all tear-off areas. New edge metal and coping is included.
The Total Cost if Work for Task Order #44, GMP for Roof Replacement Project, Elliott Point Elementary School (Phase 1):
Jacobs/Titan Guaranteed Maximum Price (GMP) $1,157,072.00
Pre-GMP Phase Services - Previously Authorized $150,000.00
Owner Direct Purchase (ODP) of TREMCO Materials $279,244.00
Total Cost of Work $1,586,316.00
Please contact Dr. Bill Smith for additional information, 689-7158.
File Attachments
TO44 GMP Elliott Pt Phase 1 Roofing Ver 1.0.pdf (225 KB)
TO#44 Elliott Point Phase 1 Cost Comp.pdf (33 KB)
10. Construction Program/Owner's Representative's Business
Subject : 10.3 TPM Program #6, Task Order
#12, Scope Modification #5, GMP
Edwins Elementary School Cafeteria
& Media Center Renovation Projects,
presented by Dr. Bill Smith, Program
Director, Facilities Planning, and
recommended by the Superintendent
for approval.
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action
Preferred Date : Apr 28, 2025
Absolute Date : Apr 28, 2025
Fiscal Impact : Yes
Dollar Amount : $3,803,621.00
Budget Source : Capital - Sales Tax
Recommended Action : Motion to approve TPM Program #6,
Task Order #12, Scope Modification
#5, GMP Edwins Elementary School
Cafeteria & Media Center Renovation
Projects, in the amount of $3,184,191,
Furniture, Fixtures & Equipment
(FF&E), in the amount of $520,000
and Owner Direct Purchase (ODP) -
HVAC Equipment, in the amount of
$99,430.
Public Content
Approval is requested for TPM Program #6, Task Order #12, Scope Modification #5, GMP Edwins Elementary School Cafeteria & Media
Center Renovation Projects.
Edwins Elementary School Old Cafeteria Renovation Project – This project consists of a major renovation of the existing Cafeteria
and Kitchen area which entails conversion
of the spaces into a new Media Center, STEM Classroom, Offices, Work Room and a Conference Room. All areas will receive new
interior finishes and new HVAC systems.
Edwins Elementary School Media Center Renovation Project – This project consists of minor renovation of the existing Media Center
ramp to convert it into three (3) new classrooms as well as an office and SLD area. All areas will receive new interior finishes and new
HVAC systems.
Jacobs/Titan Guaranteed Maximum Price (GMP) $3,184,191.00
Pre-GMP Phase Services - Previously Authorized $195,311.00
Furniture, Fixtures & Equipment (FF&E) $520,000.00
Owner Direct Purchase (ODP) - HVAC Equipment $99,430.00
Total Cost of Work $3,998,932.00
Please contact Dr. Bill Smith for additional information, 689-7158.
File Attachments
TO12 SM #5 GMP Edwins Cafeteria Reno Ver 1.0.pdf (230 KB)
TO#12 SM #5 GMP Cost Comp.pdf (33 KB)
10. Construction Program/Owner's Representative's Business
Subject : 10.4 TPM Program #6, Task Order
#28, Scope Modification #2, Phase 2
Security Upgrades at Niceville High
School and Baker School, presented
by Dr. Bill Smith, Program Director,
Facilities Planning, and recommended
by the Superintendent for approval.
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action
Preferred Date : Apr 28, 2025
Absolute Date : Apr 28, 2025
Fiscal Impact : Yes
Dollar Amount : $376,974.00
Budget Source : Sales Tax
Recommended Action : Motion to approve TPM Program #6,
Task Order #28, Scope Modification
#2, Phase 2 Security Upgrades at
Niceville High School and Baker
School, in the amount of $376,974.
Public Content
Approval is requested for TPM Program #6, Task Order #28, Scope Modification #2, Phase 2 Security Upgrades at Niceville High School
and Baker School, in the amount of $376,974.
Scope of Work:
Salto Locksets at Niceville High and Baker Schools: The scope of work included in this Scope Modification includes the installation and
configuration of Salto XS4 Mini Access Control Locksets on 200 classroom doors at Niceville High and Baker Schools. At completion,
this will enhance security, streamline access management and ensure compliance with school safety protocols. Some minor
modification of existing doors and hardware may be required during installation and is included in this scope. The associated Salto
ProAccess SPACE (or equivalent) software will be installed and configured as part of the project. Training of school personnel on the
lock functionality, credential testing and system software is also included.
Please contact Dr. Bill Smith for additional information, 689-7158.
File Attachments
TO#28 Scope Mod #2 Cost Comp.pdf (33 KB)
11. Attorney's Business
Subject : 11.1 Consideration of
recommendations, updates, requests,
and pending legal matters
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action, Information
Public Content
The attorney to the Board may provide updates, recommendations, or make requests regarding legal matters.
12. Superintendent's Business
Subject : 12.1 Out-of-State Student Trip
Requests approved by the
Superintendent.
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Information
Public Content
An updated list of out-of-state student trip requests approved by the Superintendent will be provided to the School Board Members at the
Workshop, and again at the Regular Meeting, to insure they receive the most current information.
12. Superintendent's Business
Subject : 12.2 Correspondence, requests and
other matters addressed by the
Superintendent
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action, Information
Public Content
The Superintendent may address correspondence, requests and other matters with the Board.
File Attachments
RM-Bd Presentation-Health Fair and Job Fair.pdf (1,471 KB)
13. Board Members' Announcements/Requests for Information
Subject : 13.1 Board Members'
Announcements/Requests for
Information
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action,Information
Public Content
Board Members may request information or address concerns and other matters.
14. Public Comment - General Public Comments (Yellow Card)
Subject : 14.1 Members of the public desiring to
address the School Board with general
comments - Form MIS 6120 General
Public Comments (Yellow Card)
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Information
15. Public Hearing
Subject : 15.1 Public Hearing for the proposed
re-missioning of Eglin Elementary
School to include fifth grade,
presented by John Spolski, Assistant
Superintendent, MIS/Community
Relations, and recommended by the
Superintendent for approval.
Meeting : Apr 28, 2025 - Workshop Meeting
Type : Action
Preferred Date : Apr 28, 2025
Absolute Date : Apr 28, 2025
Recommended Action : Motion to adopt Resolution 25-02
approving the proposed re-missioning
of Eglin Elementary School to include
the fifth grade.
Public Content
A public hearing will be held to receive public input on the proposed re-missioning of Eglin Elementary School
to add the fifth grade after the end of the 2024-2025 school year and thereafter, to operate as a K-5 elementary
school. Because of the re-missioning of this school it is necessary for the School Board to establish a new
student attendance area for those students residing on Eglin Air Force Base proper currently zoned to attend fifth
grade at Lewis School.
For
