READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 2, 2013 — reading text
Part 20 of 33. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Packet Pg. 348
Spring Shoulder Season
Campaign Overview
2
Packet Pg. 349
Spring Shoulder Season Campaign
Objective
• Drive new visitation and increase bookings to Okaloosa County’s
Emerald Coast post-Spring Break through Memorial Day
Strategies
• Build and maintain visibility across all steps in the travel planning and
booking process
• Paid search, travel content and booking/deal sites and Social
Media
• Utilize media to drive consumers to campaign landing pages
• Communicate value messages to drive bookings
Timing
• March 19 – June 30
3
Packet Pg. 350
EmeraldCoastOffers.com
4
Packet Pg. 351
Campaign Highlights
• 55M impressions served
• 82K clicks on ad exposures
• 9,062 OTA-reported booking transactions:
• 23,071 hotel room nights booked
• $4.1M+ booking sales, based on a $178 average daily rate
• 22% lift in hotel sales, YOY
• 8,915 visits to EmeraldCoastOffers.com
• 2,574 clicks to OTA sites
• 2,505 new Facebook fans
• 1,349 new followers on Twitter
5
Packet Pg. 352
Fall Seasonal Savings Campaign
6
Packet Pg. 353
Fall Seasonal Savings Campaign
Objective
• Increase visitation to the Emerald Coast during the Fall with value and
event driven offers
Strategy
• Utilize both online and offline content-relevant opportunities that
complement each other while offering scale
Timing
• August 26 – November 1
7
Packet Pg. 354
Fall Seasonal Savings Campaign
Key Performance Indicators
• OTA bookings
• High-value site-side actions (visitor guide requests, accommodation
page views, etc.)
Print, $103,088
Southern Living
• Print (November Issue)
• Digital (8/26/13 – 11/15/13)
Texas Monthly
• Print (October Issue, Travel Planner Section)
• Digital (8/26/13 – 11/1/13)
8
Packet Pg. 355
Fall Seasonal Savings Campaign
Merchandising Placements, $85,000
Expedia & Hotels.com
• Merchandising placements driving to custom Okaloosa page
• Robust Expedia social media value add package, including multiple
posts/tweets with the potential to reach 1.8M+
• Reported the highest estimated hotel sales for the spring campaign
Priceline
• Geo-targeted banners within Travel Guides and Product homepages
• 10% reach against target audience (highest reach of the major OTAs)
Orbitz & Cheaptickets
• Strong YOY booking transaction gains from both Orbitz (+48%) and
Cheaptickets (+35)
• Air, Hotel and Vacation Packages targeted to Okaloosa-related searches
• Deals Pages banner rotation, geo-targeted to drive market
I.P. addresses
9
Packet Pg. 356
Fall Seasonal Savings Campaign
Travel Content Placement: $51,175
Visit Florida
• Prominent position on site’s most visited page
• #1 visited Florida site
Travelzoo
• Custom Okaloosa page will highlight direct links to hotelier booking
engines
• 40k guaranteed clicks to the dedicated page
Google
• Google has been a top site-side action driver for the Spring and Summer
campaigns
Social Media: 28,000
Facebook
• Geo- and interest-targeted tile ads
• Historical performance from Spring and Summer campaigns
• Promotional Contest
10
Packet Pg. 357
Fall Seasonal Savings Campaign
Vendor Opportunity Impressions/Clicks Net Budget
Southern Living 2/3 page 4C ad, digital banner placements 1.7M+ impressions $90,000
1.6M guaranteed impressions;
Expedia/Hotels.com Merchandising and support banners 2.9M+ potential social value add $55,000
impressions
TravelZoo Merchandising and support text/image ads 40k guaranteed clicks $40,000
Orbitz/
Merchandising and support banners 1.2M guaranteed impressions $15,000
Cheaptickets
Priceline Merchandising and support banners 1.7M guaranteed impressions $15,000
Texas Monthly 2/3 page 4C ad, digital banner placements 82,500+ impressions $13,088
Visit Florida Content tile ad N/A (250k+unique monthly visitors) $6,400
Google Keyword-targeted text ads 2,387 estimated clicks $4,775
Facebook Geo, demo and interest-targeted tile ads 5,084 estimated clicks $3,000
Estimated online ad serving fees $2,737
Total Spend $245,000
Contingency $30,000
11
Packet Pg. 358
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: August 6, 2013
TO: Honorable Chairman and Members of the Board
FROM: Elliot Kampert
SUBJECT: 2013 Local Mitigation Strategy Annual Update/Community Rating
System Section 510 Compliance
DEPARTMENT: Growth Management
BCC DISTRICT: All
Introduction
In 2011, Okaloosa County and all its municipalities adopted a substantially revised version of the
Local Mitigation Strategy (LMS). The new LMS was found in compliance by the Florida
Division of Emergency Management in April 2011, and by the Federal Emergency Management
Agency in May 2011. By July 2011, all the municipalities as well as the County had passed
ordinances or resolutions adopting the 2011 LMS. Because it includes a comprehensive analysis
of the County’s and municipalities’ floodplain areas and floodplain management strategies, as
well as analyses of all other hazards by which the County is threatened, the LMS serves as the
County’s Hazard Mitigation Plan as provided in Section 510 of the Community Rating System
(CRS) Coordinator’s Manual.
This Annual Report is structured to comply with the requirements of CRS Activity 510 reporting
criteria as provided on pages 510-30 and 510-31 of the National Flood Insurance Program
Community Rating System Coordinator’s Manual, FEMA publication FIA-15/2007.
Annual Report Preparation, Submittal to Governing Bodies, Release to Media, and Public
Availability
This annual report was prepared internally by the Planning Division of the Okaloosa County
Growth Management Department and has been distributed to all the municipalities.
For credit under the Community Rating System, this Annual Report must be distributed to the
media and be made available to the public. To this end, it is being sent to the Northwest Florida
Daily News, and copies of this Report are available for review or download online at the Growth
Management portion of the County Website, and may be viewed or obtained in hard copy at the
Growth Management Department’s offices located at the Water & Sewer Administrative
Complex, 1804 Lewis Turner Boulevard, 2nd Floor in Fort Walton Beach, or the North Planning
Office located at 402 Brookmeade Drive in Crestview. The entire 2011 LMS, as amended, may
also be accessed via the Growth Management portion of the County website or at the previously
mentioned Growth Management office locations.
Packet Pg. 359
Revisions to Local Mitigation Strategy
With the approval of the Local Mitigation Strategy Committee (comprised of representatives
from the County, all nine municipalities, Eglin Air Force, the Okaloosa County Public School
District, and private citizens) and as noted in the 2012 Annual Report, the County amended the
2011 Local Mitigation Strategy to include its Disaster Housing Plan as a revised section 5.10.06.
Additional Changes for this Annual Report
The following projects have been completed:
The Okaloosa County Water & Sewer Department has completed the replacement of the
Okaloosa Island Lift Station.
The following projects have been removed from the attached project list:
Project # 5 Main Island lift station has been completed, per Mr. Mark Wise, Engineer for
Okaloosa County Water & Sewer Dept.
Status of LMS Goals and Objectives
At this time, much of the work identified in the LMS is ongoing.
The Goals and Objectives (the statements under each Goal), provide the broad range of what is
to be accomplished during the five-year planning period from 2011 through 2015 by the LMS
Steering Committee. Since Action Items are, for the most part, ongoing activities - such as
implementation of the Florida Building Code, Floodplain Management practices, etc. - that are
undertaken as part of the County’s and municipalities’ day-to-day operations, their status is
ongoing. Projects, on the other hand, may be part of on-going, programmatic activities (such as,
for example, installing generators to supply emergency power at key infrastructure) or major,
one-time (or at least very long term) upgrades of facilities such as the construction of a new
emergency operations center. At the time of this 2013 Annual Report, all of the Goals and
Objectives are being met, and projects have been completed as noted, above.
2013 LMS Projects
Attachment A is the current list of LMS projects as approved by the LMS Committee. This list
also provides the status of each project, and states the reason (typically lack of funds) for any
projects for which action has been deferred. It should be noted that Rebuild Northwest Florida, a
private, non-profit organization, has submitted to the Florida Division of Emergency
Packet Pg. 360
Management one of the projects on the 2013 LMS Priority List Projects, Okaloosa Residential
Retrofit program submitted by Rebuild Northwest Florida in response to the availability of funds
resulting from Hurricane Isaac. This project was considered and endorsed by the LMS
Committee. In addition, the City of Mary Esther submitted a project to replace an existing
stormwater drainage pipe located on the rear of several lots located on Brewer Circle.
Recommendations for New projects or Revised Recommendations
Except for the City of Mary Esther project noted above, there are no new projects contemplated,
nor are
