About this source
Florida Statutes from the Okaloosa County BOCC meeting of October 21, 2014 (IQM2 meeting #1236). Original portal label: Florida Statutes. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Florida Statutes
- Date
- October 21, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Florida Statutes (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 58.0 KB
Download ↓Machine-extracted text — 61-Florida Statutes.pdf
Text extracted on 2026-10-31 from 61-Florida Statutes.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 3.7 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
556.105 Procedures
(1)(a) Not less than 2 full business days before beginning any excavation or demolition…. an
excavator shall provide the following information through the system:
(b) The excavator shall provide the information by notifying the system through its free-access
notification system during business hours…,
(c) Information provided by an excavator is valid for 30 calendar days after the date such
information is provided to the system.
(3) The system shall provide the person who provided notification with the names of the
member operators who shall be advised of the notification and a notification number that specifies
the date and time of the notification.
(4) The notification number provided to the excavator under this section shall be provided to
any law enforcement officer, government code inspector, or code enforcement officer upon
request.
(5) All member operators within the defined area of a proposed excavation or demolition shall
be promptly notified through the system, except that member operators with state-owned
underground facilities located within the right-of-way of a state highway need not be notified of
excavation or demolition activities and are under no obligation to mark or locate the facilities.
(a) If a member operator determines that a proposed excavation or demolition is in proximity
to or in conflict with an underground facility of the member operator..….the member operator
shall identify the horizontal route by marking to within 24 inches from the outer edge of either side
of the underground facility by the use of stakes, paint, flags, or other suitable means within 2 full
business days after the time the notification is received under subsection (1). If the member
operator is unable to respond within such time, the member operator shall communicate with the
person making the request and negotiate a new schedule and time that is agreeable to, and should
not unreasonably delay, the excavator.
(c) When excavation is to take place within a tolerance zone, an excavator shall use increased
caution to protect underground facilities. The protection requires hand digging, pot holing, soft
digging, vacuum excavation methods, or other similar procedures to identify underground
facilities. Any use of mechanized equipment within the tolerance zone must be supervised by the
excavator.
(6)(a) An excavator shall avoid excavation in the area described in the notice given under
subsection (1) until each member operator underground facility has been marked and located or
until the excavator has been notified that no member operator has underground facilities in the
area described in the notice, or for the time allowed for markings set forth in paragraphs (5)(a)
and (b), whichever occurs first. If a member operator has not located and marked its underground
facilities within the time allowed for marking set forth in paragraphs (5)(a) and (b), the excavator
may proceed with the excavation, if the excavator does so with reasonable care and if detection
equipment or other acceptable means to locate underground facilities are used.
(9)(a) After receiving notification from the system, a member operator shall provide a positive
response to the system within 2 full business days, or 10 such days for an underwater excavation
or demolition, indicating the status of operations to protect the facility.
(b) The system shall establish and maintain a process to facilitate a positive-response
communication between member operators and excavators. The system is exempt from any
requirement to initiate a positive response to an excavator when an excavator does not provide a
valid electronic address to facilitate a positive response by the system.
Related sources
This florida statutes is part of the Okaloosa County BOCC meeting of October 21, 2014.