READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — MSBU Policy — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 96-MSBU Policy.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
available to attend any community meetings concerning the
establishment of the district. Notification to property owners of any County-sponsored
meeting will be coordinated through Public Works. Public Works would appreciate the
opportunity to review any correspondence relating to the establishment of the district
prior to circulation.
Public Works will review the items submitted as part of the application to confirm that
the information is complete. The application will then be forwarded to appropriate
departments for review of the scope of work and plat information.
Preliminary engineering is required for sidewalk and roadway/drainage construction or
replacement.
All engineering and construction will be provided by County staff, contingent
upon approval by the Board of County Commissioners, up to the financial
limits as set forth by Florida State law. Projects exceeding the statutory limits
or staffing capabilities of the County will be competitively bid out for design
and/or construction.
All material costs will be funded by the MSBU.
County staff will present any requests for County participation in capital projects to the
Board of County Commissioners for consideration.
Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project.
The petition shall reflect the cost for preliminary engineering and the cost estimates for
13
final engineering and construction, provided by the preliminary engineering report. The
petition shall also reflect the appropriate reserves, contingencies, administrative fees
and interest expense during the construction period. The petition shall be prepared with
assistance from the Public Works Division and the District Liaison.
County staff will identify a date for petition return of 30-60 calendar days based upon
target time frame for public hearing and upon length of time cost estimates will be valid.
Petition Acceptance
The petition, to be considered, must be signed by at least 66% of the current property
owners (number of owners) representing at least 66% of the assessed properties
(number of lots) within the proposed district boundaries.
A property owner is the individual or group of individuals that own a parcel of
land.
Okaloosa County Property Appraiser and Tax Collector data shall be used to
determine eligible signatures of owners. All of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership
and parcel to count towards the 66% requirements.
Once submitted, names may not be withdrawn from the petition.
Upon return, County staff will review the petition for sufficiency.
No petition will be accepted without the signatures of all property owners who
would be required to dedicate right-of-ways or easements to the County.
If the petition is accepted, Public Works will request that the Board of County
Commissioners authorize a public hearing for consideration of the ordinance to
establish the district. Please note that once the petition is accepted and a public
hearing is authorized, the petition is not conclusive to the final determination by the
Board of County Commissioners to proceed (or not) with the project. The final
determination of the scope and feasibility of a project will be determined by Okaloosa
County.
Public Hearing
When the proposed ordinance and all documents are in order and a public hearing date
is scheduled, legal notices will be published. In addition, notification will be mailed to all
property owners listed on the tax roll within the proposed district.
No public hearing will be scheduled unless all affected property owners have agreed to
14
dedicate the necessary right-of-way to the County.
At the public hearing, the Board of county Commissioners may consider comments,
objections, and information relevant to the creation of the district. The County
Commissioners may amend, enact, or deny the proposed ordinance.
Implementation
Final engineering plans are prepared by County staff for construction projects to include
sidewalk, and roadway/drainage work. Property owners are responsible for material
costs of any construction projects. County staff will perform construction work as
approved by the Board of County Commissioners.
If recalculated project costs, using information derived from final engineering
data, would represent an increase of 20% or more, an additional petition
process will be required and an additional public hearing held. Notice of this
public hearing will be published; in addition, notification will be mailed to all
property owners.
Final Public Hearing
After construction is complete, all costs relating to the project will be compiled by Public
Works. Public Works will request to schedule a Final Public Hearing to adopt the final
assessment through a resolution or amending ordinance. The Public Hearing will be
advertised and notification mailed to all property owners listed on the tax roll within the
district. If adopted, the Resolution or Amending Ordinance, including Final Assessment
Liens, will be recorded in the Okaloosa County public records. Term of the repayment
for construction costs may be determined as follows:
Individual Assessment Amount Term
$3,000 and up 10 years
$2,500 to $2,999 8 years
$2,000 to $2,499 6 years
$1,500 to $1,999 4 years
$1,000 to $1,499 3 years
$ 500 to $ 999 2 years
$ -0- to $ 499 1 year
Final determination as to the terms of repayment will be made by the Board of County
Commissioners in conjunction with Public Works and the Okaloosa County Clerk of
Courts. Annual Assessments are collected either through the Tax Collector of Okaloosa
County, in the same manner as all other County taxes are collected or assessments
will be reimbursed through municipal or Okaloosa County Water and Sewer utility
billing.
15
DETAILED PROCEDURES, STREET LIGHTING DISTRICTS
16
STREET LIGHTING DISTRICTS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South Ferdon Blvd
Crestview, FL 32536
(850) 689-5772
The request must identify:
the area affected (e.g., community, subdivision or street)
the type of improvement involved (i.e., street lighting)
the type of district contemplated (i.e., street lighting)
Application for District
Application can be made by interested property owners for establishment of a new
street lighting district or changes or additions to an existing one.
In order to proceed with establishing a new district interested homeowners or property
owners must submit the following as the official request for consideration:
$100.00 application fee (per street lighting district) made payable to the Board of
County Commissioners, Okaloosa County.
Contact individual and proposed liaison names, addresses and phone numbers.
A copy of the cost estimate for streetlight improvements as prepared by the
appropriate power provider.
Copy of a map with:
o Proposed boundaries for the district outlined.
o Boundaries must be continuous and not split parcels or lots. Enclaves are
17
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of establishment of the district.
o Tracts for drainage, buffer zones, etc. are usually included in the district
but not assessed for street lighting.
o The district to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
o Districts must contain a minimum of two distinct taxable (or platted) pieces
of property.
Petition Submission
The Board of County Commissioners has determined that a petition may serve as an
indicator of the amount of community interest for a proposed project. The petition
process is not a requirement of Florida Law.
Public Works will prepare a petition for distribution by the District Liaison. Only petitions
prepared by Public Works will be accepted.
The petition will reflect the various charges included in calculating the assessments.
The street lighting assessment will include: all costs associated with installation of the
streetlights, as determined by the appropriate power provider, 5% administrative fees
for collection of the assessments, and a reserve which totals 120% of the proposed
yearly expenditures.
Petition Acceptance
The petition, to be accepted, must be signed by at least 51% of the current property
owners (number of owners) representing at least 51% of property (number of lots or
number of front feet, measured consistent with the method of assessment) within the
district boundaries.
A property owner is the individual or group of individuals that own a parcel of
land.
In determining eligible signatures of owners, all of the non-related current owners
of a parcel or the designated trustee must sign the petition for the ownership and
parcel to count towards the 51% requirements.
Once submitted, names may not be withdrawn from the petition.
18
Upon return, Public Works will review the petition for acceptability, consulting other
departments as appropriate.
If the petition is acceptable, Public Works will request that the Board of County
Commissioners schedule a public hearing for consideration of the ordinance to establish
the district or revisions to the ordinance for the existing district to incorporate the
changes. Please note that once the petition is accepted and a public hearing is
authorized, the petition is no longer relevant to the final determination by the Board of
County Commissioners to proceed (or not) with the project. The final determination of
the scope and feasibility of a project will be determined by Okaloosa County.
Public Hearing
When the proposed ordinance and all documents are in order and a public hearing date
is scheduled, legal notices will be published. In addition, notification will be mailed to all
property owners listed on the tax roll within the proposed district.
At the public hearing, the Board of County Commissioners may consider comments,
objections, and information relevant to the creation of the district. The County
Commissioners will enact or deny the ordinance. If the ordinance is enacted,
appropriate Board authorization to record the Ordinance in the Recording Department,
Okaloosa County Clerk’s Office, will be requested.
Implementation
Upon execution of the Ordinance by the Board, the local power provider can begin
