READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — MSBU Policy — reading text
Part 2 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 96-MSBU Policy.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
assessment is levied for the
first time 2) assessment is increased beyond the
maximum rate authorized 3) upon any boundary
changes 4) upon change of purpose or use of
revenue
Between January 1 and September 15 Written Objections – Property owners have a
right to appear at the hearing and to file written
objections with the local government within 20
days of the notice
Local government makes agreement with Property
Appraiser and Tax Collector for providing
reimbursement of administrative costs. (Postage,
forms, supplies, etc.)
5
TYPES OF MSBU DISTRICTS & SERVICES
Currently there are two (2) types of MSBU Districts in Okaloosa County. These are
described below.
Construction Districts
Construction/reconstruction to current County or alternate/interim standards
- Area to be improved is platted/dedicated to the public.
- Area to be improved is currently private; proof of ability to transfer the area
to public ownership must be submitted as part of the application for
establishment of a MSBU.
Construction materials provided by MSBU. Engineering, construction labor and
equipment provided by County staff contingent on approval by the Board of
County Commissioners.
Street Lighting Districts
Construction/reconstruction and maintenance. These services are provided by
the appropriate power provider
Lights will be installed and subsequently maintained by appropriate power
provider
COSTS INVOLVED IN THE MSBU PROCESS
Costs involved with every district:
$100 application fee. The application fee shall not be returned if the MSBU is not
established
5% Administrative fee for collecting agency (or as addressed on a case-by-case
basis for MSBU’s.)
1/2% Tax Collector commission
Reserves for contingencies/cash balance forward
6
Any costs incurred for advertisement and publications
Additional Construction District costs
Annual repayment of financing, if required
Materials and right-of-way costs (All labor and equipment will be provided by
County staff, contingent on Board of County Commissioner approval.)
Interest on any funds borrowed through the construction period, if required
Additional Street Lighting District costs:
Installation costs and facilities costs as provided by the power provider
Reserves which total 120% of annual estimated expenditures
MSBU BOUNDARIES
Municipal Services Benefits Units (special assessment districts) may be created for the
following types of areas in Okaloosa County:
Platted, unplatted, or metes and bounds, where area to be improved is public
1. Initial Request for MSBU Procedures
Interested homeowners should send a letter, or call, requesting, “Guidelines and
Procedures” for the establishment of a special assessment district to:
Okaloosa County Public Works
1759 South Ferdon Blvd.
Crestview, Florida 32536
(850)689-5772
The request must identify:
the area affected (e.g., community, subdivision or street)
the type of improvement involved (e.g., paving and drainage or street lighting)
the type of district contemplated (i.e., construction or street lighting)
7
2. Application for District
Public Works will provide the “Guidelines and Procedures” booklet to use in
requesting establishment of a district. The necessary information and completed
forms are returned to Public Works as the formal application for a district, along with
a $100.00 application fee.
An informative letter can be mailed, if deemed necessary, to all of the property
owners in the proposed area to be improved or a meeting may be scheduled to
advise the property owners of the submitted application for an MSBU.
3. Petition Submission
The Board of County Commissioners has determined that a petition serves as an
indicator of the amount of community interest for a proposed project. The petition
process is not a requirement of Florida Law. The petition will be provided to the
District Liaison.
4. Petition Acceptance
The Board of County Commissioners shall consider petitions signed by at least 66%
(51% for Street Lighting Districts) of the current property owners (number of owners)
representing at least 66% (51% for Street Lighting Districts) of the properties
(number of lots) within the district boundaries.
If the petition meets the above requirements and is accepted by the Board of County
Commissioners, a public hearing shall be authorized for the consideration of an
ordinance to establish the district.
Please note that once the petition is accepted and a public hearing is authorized, the
petition is not binding as to a final determination by the Board of County
Commissioners to proceed with the project.
5. First Public Hearing
When the proposed ordinance and all documents are in order and a public hearing
date is scheduled, legal notices will be published in the newspaper. In addition,
notification will be mailed to all property owners listed on the tax roll within the
proposed district.
At the public hearing, the Board of County Commissioners may consider comments,
objections, and information relevant to the creation of the district. The County
Commissioners may enact or deny the ordinance. If the ordinance is enacted, it will
8
be officially recorded the Okaloosa County Clerk’s Office, reflecting the preliminary
assessment amount for each property.
7. Implementation
The final engineering plans are prepared by County staff, contingent upon approval
of the Board of County Commissioners.
Upon completion of the final engineering plans, if the total project cost is 20% or
more over the preliminary cost estimates, an additional petition process will be
conducted and an additional public hearing will be held by the Board of County
Commissioners to determine if the affected citizens desire the project to continue.
Notices for this public meeting will be published in the newspaper; notification will
also be mailed to all property owners listed on the tax roll within the proposed
district.
8. Final Public Hearing
After construction is complete, all costs relating to the project are compiled by Public
Works. The Board of County Commissioners is requested to authorize a Final
Public Hearing to adopt the Final Assessment Resolution or enact an Amended
Ordinance. All property owners listed on the roll within the district will be notified of
the Public Hearing and the results. The final adjusted assessments will be recorded
Okaloosa County Clerk’s Office.
Notification and action concerning subsequent annual increases or decreases in the
yearly assessments will be governed by:
- Requirements of Florida Statutes;
- County policy; and
- On-going coordination mechanisms between the District and County identified in the
Detailed Procedures
DISSOLUTION PROCEDURES FOR MSBUs
Upon written request, the County will provide guidelines for dissolving an existing
district. The steps to take in requesting dissolution of a district are:
Submission of an application to dissolve the district and $100 application fee.
Submission of a petition which includes a statement regarding funding to
pay for any outstanding financial obligations and distribution of credits of
the district.
9
The petition, to be considered, must be signed by at least 66% (51% for
Street Lighting Districts) of the current property owners (number of
owners) representing at least 66% (51% for Street Lighting Districts) of the
assessed properties (measured consistent with the method of
assessment) within the district boundaries.
Notice and Public Hearing by the Board of County Commissioners to
establish final assessments
EXCEPTIONS TO THE GUIDELINES
The Board of County Commissioners may address exceptions to any of the guidelines
on a case-by-case basis.
QUESTIONS?
Contact the Okaloosa County Public Works 850-689-5772
NOTE: Detailed Procedures for each type of District should be consulted for more
specific information concerning requirements and procedures.
10
DETAILED PROCEDURES, CONSTSRUCTION DISTRICTS
11
CONSTRUCTION DISTRICTS
DETAILED PROCEDURES
Initial Request for MSBU Procedures
Upon request of the procedures to establish an MSBU, Public Works will forward a copy
of the “Guidelines and Procedures” booklet to the requestor. The request should be
made to:
Okaloosa County Public Works
1759 South Ferdon Blvd.
Crestview, Florida 32536
(850)689-5772
The request must identify:
the area affected (e.g., community, subdivision or street)
the type of improvement involved (e.g., paving or drainage)
the type of district contemplated (i.e., construction or street lighting)
Application for District
In order to proceed with establishing a district, interested homeowners must submit the
following as the official request for consideration:
1. Scope of Services for the proposed improvement or construction.
Thoroughness in describing the desired scope of services is important as it
is the key to the development of more accurate preliminary cost estimates.
2. A map depicting the proposed district boundary.
Boundaries must be continuous and not split parcels or lots. Enclaves are
not allowed if the reason is to remove a lot or lots because the property
owner is not in favor of the establishment of the district.
The district to be assessed does not necessarily include an entire
subdivision if the entire subdivision does not materially benefit from the
proposed action.
Districts may be established in unplatted residential areas where the
proposed action benefits property owners in a definable geographic area.
12
Districts must contain a minimum of two distinct taxable (or platted) pieces
of property.
3. Contact person and proposed liaison names, addresses and phone numbers.
4. $100.00 application fee made payable to the Board of County Commissioners,
Okaloosa County.
Application Review/Preliminary Engineering Report
Upon receipt of the application for a MSBU, a letter may be mailed to each property
owner advising of the application’s submittal and the imminent petition process. The
District Commissioner may request an informative meeting with the property owners to
discuss the MSBU process. Upon request by the district Liaison and with sufficient
notice, Public Works is
