READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-02-09 special — reading text
Part 20 of 26. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22877-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
income in an amount at least equal to the amount of float so used. Because
program income generated from CDBG R
- activities will not be treated as program income to
the CDBG -R program, grantees may not use CDBG -R funds to assist any float -funded
activity or guarantee. 24 CFR 570.301( b) is therefore waived.
E. Eligibility, Allowable Costs, and National Objective Waivers
Background
Overall low- and moderate- income benefit alternative requirements: The
requirement that 70 percent of funds are for activities that benefit low- and moderate- income
persons [ found at 42 U. S. C. 5301( c), 42 U. S. C. 5304( b)( 3)( A), 24 CFR 570. 200( a)( 3) and 24
CFR 570.484] will apply to the use of CDBG -R funds. A grantee must ensure that 70
percent of its CDBG --
R grant be expended for activities that benefit low- and moderate -
income persons. Compliance with the overall benefit requirement must be demonstrated
separately for the CDBG -R grant and not in combination with regular CDBG funding or
commitments under the Section 108 Loan Guarantee program; thus, there is no option for
selecting the timeframe for compliance.
29
Urgent need national objective criteria: In the regular CDBG program, to meet the
urgent need national objective pursuant to 24 CFR 570. 208( c) and 24 CFR 570. 483( d), the
recipient must certify: that the activity is designed to alleviate existing conditions which pose
a serious and immediate threat to the health and welfare of the community which are of
recent origin or recently became urgent, that the recipient is unable to finance the activity on
its own, and that other sources of funds are not available. In the regular State CDBG
program, the local government provides this certification and the State makes the
determination of the same. For CDBG -R, HUD is eliminating the recordkeeping
requirement that grantees document the nature, degree and timing of seriousness of the
condition to be addressed by the activity if the urgent need is based on current economic
conditions, HUD will accept a grantee' s certification that current economic conditions are of
recent origin and constitute a serious and immediate threat to the welfare of the community.
However, the grantee must still demonstrate that it is unable to finance the activity on its
own, and that other sources of funding are not available. For the State CDBG program,
states may make this certification on behalf of units of general local government.
Limitations on public services activities: In the regular CDBG program, entitlement
grantees are permitted to obligate no more than 15 percent of their annual CDBG allocation
plus 15 .percent of the prior program year' s prograrn income for public service activities.
States are permitted to expend no more than 15 percent of each annual CDBG allocation plus
program income for public service activities. HUD is providing an alternative requirement
because there will be no program income attributed to CDBG -R, and because CDBG --R is to
be treated as a separate appropriation of funds. Compliance with the public service cap must
be demonstrated separately based on each grantee' s total CDBG- R grant allocation and not
30
in combination with its regular CDBG funding or program income. For both states and
entitlements, compliance will be demonstrated based on expenditures of CDBG -R funds, not
on obligations as in the regular CDBG entitlement prograrn. HUD is waiving 42 U. S. C.
5305( a)( 8) to exclude program income from the amount of funds on which the cap is based.
Other provisions of that section remain in place.
Limitations on planning and general administration activities: Pursuant to 24 CFR
570. 200 (8), in the regular CDBG program, a CDBG entitlement grantee is permitted to
obligate no more than 20 percent of its annual CDBG allocation plus program income for
planning and administrative costs as defined in 24 CFR 570. 205 and 24 CFR 570.206.
Pursuant to 24 CFR 570. 489( a)( 3), a state and its funded units of general local government
are, in aggregate, pennitted to expend no more than 20 percent of the state' s annual grant
plus program income for planning and administrative costs as defined at 42 U. S. C.
5305( a)( 12), 5305( x)( 13) and 5306( d)( 3). HUD is providing an alternative requirement
because there will be no program income attributed to CDBG -R, and because CDBG -R is to
be treated as a separate appropriation of funds. Compliance with the planning and
administration costs cap must be demonstrated separately based on each grantee' s total
CDBG- R grant allocation and not in combination with its regular CDBG funding or program
income. For CDBG -R, up to 10 percent of a CDBG -R- grant directly provided to a
jurisdiction ( State, entitlement community, Insular Area or non -entitled county in Hawaii)
may be used for general administration and planning activities. For all grantees, including
states, the 10 percent limitation applies to the grant as a whole. States should note that the 10
percent limitation includes any funds the State expends for technical assistance to units of
general local government and non- profit organizations pursuant to 42 U. S. C. 5306( d)( 5) and
31
6). Consistent with Recovery Act provisions to expedite the use of CDBG -R funds, HUD is
waiving the requirement for matching State administrative funds. Requiring states to match
administrative funds may considerably slow down the expenditure of CDBG -R funds in
states struggling to stabilize their budgets.
Public benefit standards: In the regular CDBG program, the public benefit standards
at 24 CFR 570. 209( b), ( c) and ( d) ( for entitlement grantees) and 24 CFR 570. 482( f) and ( g)
for states) apply to economic development projects under the authority of 24 CFR 570. 203,
24 CFR 570. 204, 24 CFR 570. 208( a)( 4)( vi)( F)( 2), 24 CFR 570. 483( b)( 4)( vi)(F)( 2), and 42
U. S. C. 5305( a)( 2), ( 14), ( 15), or ( 17), respectively. HUD is waiving portions of these
regulations to expedite the timely use of funds by grantees. HUD will presume that activities
that meet the requirements and Congressional intent of the Recovery Act provide sufficient
public benefit. Grantees are still encouraged to provide economic assistance at the lowest
possible cost per job, or cost per low- and moderate -income beneficiary.
Activities identified in these regulations as providing insufficient public benefit
remain ineligible for CDBG -R funding: general promotion of the conununity as a whole;
assistance to professional sports teams; assistance to privately -owned recreational facilities
that serve a predominantly higher -income clientele, where the recreational benefit to users or
members clearly outweighs employment or other benefits to low- and moderate -income
persons; acquisition of land for which the specific proposed use has not yet been identified;
and assistance to a for -profit business while that business or any other business owned by the
same person( s) or entity(ies) is the subject of unresolved findings of noncompliance relating
to previous CDBG assistance provided by the recipient. ( Those ineligible activities are in
32
addition to those which the Recovery Act specifically prohibits: casinos, other gambling
establishments, aquariums, zoos, golf courses, or swimming pools.) Furthermore, HUD is
not waiving the provisions of 24 CFR 570. 209( a) ( for entitlement grantees) and 24 CFR
570.482( e) ( for states) regarding underwriting guidelines.
Relationship ofCDBG -R to the Section 108 Loan Guarantee program: In the Section
108 program, 24 CFR 570. 705( a)( 2)( i) permits a CDBG grantee to borrow an amount of up
to five times of its most recent CDBG grant for a Section 108 loan. 24 CFR 570. 705( b)
permits CDBG hands to be used as a pledge of security for the repayment of Section 108
loans. 24 CFR 570. 705( c) permits the use of CDBG funds to repay funds borrowed under
the Section 108 program. The Section 108 program is intended to provide longer -term
project financing and requires a pledge of CDBG future funds over the life of the loan
guarantee, whereas CDBG -R. is a one --time appropriation of funds of limited duration.
CDBG --R funds may not be used as a pledge of security for the repayment of Section 108
loans, may not be used to securitize borrowing under the Section 108 program, may not be
used as repayment for funds borrowed under the Section 108 program, and may not be
counted toward a grantee' s maximum Section 108 borrowing authority.
Requirements
1, 42 U.S. C. 5304( b)( 3)( A), 24 CFR 570. 200( x)( 3) and 24 CFR 570.484 are waived to the
extent necessary to require that CDBG -R funds shall principally benefit persons of low and
moderate income in a manner that ensures that not less than 70 percent of such funds are
used for activities that benefit such persons, exclusive of any other funds received by the
33
grantee under 42 U.S. C. 5306 or as a result of a guarantee or a grant under 42 U. S. C. 5308.
A grantee must meet this requirement over the life of its CDBG --
R grant.
2. 24 CFR 570. 506( b)( 12)( i) and ( iii) are waived, and 24 CFR 570.208( c), 24 CFR
570. 483( d), and 24 CFR 570. 490( a) and ( b) are waived to the extent necessary to allow
grantees to certify that an activity is designed to address current economic conditions which
pose a serious and iixunediate threat to the welfare of the community. HUD has determined
that current economic conditions are of recent origin and pose a serious and immediate threat
to the economic welfare of communities. States may provide this certification on behalf of
units of general local government. Grantees must maintain other documentation specified in
these regulations.
3. 42 U. S. C. 5306( a)( 8), 24 CFR 570, 201( e)( 1) and 24 CFR 570. 201( e)( 2) are waived to the
extent necessary to require that no more than 15 percent of CDBG -R funds shall be expended
for eligible public service activities, exclusive of any other funds received by the grantee
under 42 U. S. C. 5306. A grantee must meet this requirement over the life of this grant.
4. 42 U. S. C. 5306( d)( 3), ( 5) and ( 6), 24 CFR 570. 200( g) and 24 CFR 570.489( a) are waived
to the extent necessary to establish the following requirement: No more than 10 percent of
CDBG -R funds shall be expended for eligible planning and general administration activities
as defined in 42 U. S. C. 5305( a)( 12), 5305( a)( 13) and 5306( d)( 3), and in 24 CFR 570. 205 and
24 CFR 570.206, exclusive of any other funds received by the grantee under 42 U. S. C. 5306.
For states, this 10 percent limitation includes technical assistance eligible under 42 U. S. C.
5306( d)( 5) and ( 6). A grantee must meet this requirement over the life of this grant. For
states, this requirement applies in total to the state and all entities it funds.
34
5. The requirements at 42 U. S. C. 5306( d)( 3)( A) and 24 CFR 570. 489( a) are waived to the
extent necessary to eliminate the state match requirement for general administrative costs.
