READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 06-02-09 special — reading text
Part 19 of 26. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22877-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
performed engineering and environmental review work on a project
to replace sanitary sewers, but scaled back the project before awarding a construction
contract due to funding constraints. Because engineering work has already been done, it
may be time- or cost -effective for the grantee to issue a separate construction contract for
the blocks of sewers that were excluded from the existing contract.
A grantee may use CDBG -R funds to finance the rehabilitation of several apartment
buildings that are on the waiting list for assistance under the grantee' s CDBG rental
housing rehabilitation loan program.
A grantee might consider physical improvements to a water treatment plant that will
reduce the energy costs of the plant' s operations or will conserve water resources.
A grantee that had to pare back funding for an activity (compared to the subrecipient' s
original funding request or prior levels of service) might execute a subrecipient
agreement to provide CDBG -R funds that will restore the activity to " full funding" levels.
23
CDBG -R funding will be tracked separately from a grantee' s regular CDBG funding
in the Integrated Disbursement and Infonnation System ( IDIS), will have separate funding
contract language, and will have a different grant number from a grantee' s regular CDBG
funding. Grantees are cautioned against commingling regular CDBG and CDBG -R funds.
However, this does not prevent a grantee from using CDBG -R funding in conjunction with
an existing activity funded with regular CDBG funds, where the additional funding will be
covered under a new contract or subrecipient agreement. Grantees will need to set up this
additional increment of funding as a separate activity in IDIS.
Grantees who wish to use CDBG -R funds to expand an ongoing or already- under-
construction project should keep the following additional considerations in mind.
Environmental review procedures: HUD legislation and regulations ( 24 CFR
58. 22) prohibit CDBG grantees and any party to the development process from committing
HUD or non -HUD assistance to a project until the environmental compliance review process
has been successfully completed. In adding CDBG -R funds to an existing project, grantees
must carefully consider the implications of the Part 58 definition of a commitment of federal
funds. No new environmental review is required when a CDBG -R project has been reviewed
previously by the same responsible entity, no change to the project activities or location or
size results from additional funding, and no new environmental conditions have been
discovered. HUD regulations and law prohibit the commitment of HUD and non HUD
assistance to a project until the environmental compliance review is successfully completed.
Therefore, because Recovery Act projects must expend their CDBG -R funds in such a short
timeframe, it is very important to begin and complete your environmental compliance review
as soon as possible. Grantees are urged to contact their Field Environmental Officer, and to
24
visit the HUD environmental website for more detailed information on environmental
clearance: http: / www
/ hud gov/ offices /cpd/ energyenviron/ environment /compliance /qa /clearance cfin
Labor Standards applicability: HUD will issue guidance concerning the applicability
of prevailing wage requirements at a later date. For more information about the federal labor
standards requirements in HUD programs, please visit the Office of Labor Relations website
at www.liud. g_ov /offices /olr.
B. Reimbursement for Pre -Award Costs
Background
CDBG -R grantees will need to move forward rapidly to prepare the CDBG -R
substantial amendment and to undertake other administrative actions, including
envirorunentai reviews. Therefore, HUD is granting pennission to states and entitlement
jurisdictions receiving a direct allocation of CDBG -R funds to incur pre -award costs
associated with the development of the substantial amendment to the action plan as if each
was a new grantee preparing to receive its first allocation of CDBG funds.
Grantees may also take advantage of the provisions of 24 CFR 570. 200( h) regarding
activity -specific pre -award costs. Grantees may incur costs prior to grant award for specific
activities, as of the date the grantee submits its CDBG -R action plan substantial amendment
to HUD. Where a grantee amends an existing construction contract or issues a new contract
in order to use CDBG -R funding to expand an existing activity, the date on which the
CDBG R
- costs are considered incurred for purposes of 24 CFR 570.200( h) will generally be
the date of the new or amended contract, not the date that funds were initially obligated for
the original project.
25
A number of entitlement grantees have used the provisions of 24 CFR
570. 200( h)( 1)( v) to incur pre -award costs against their regular CDBG program, where
payments will be made from future years' CDBG allocations. HUD has determined that it is
not consistent with the requirements of the Recovery Act to allow CDBG -R funds to be used
as payment for pre -award activity costs that grantees incurred under their regular CDBG
funds. HUD therefore finds good cause to waive 24 CFR 570. 200( h) to the extent necessary
to implement this prohibition.
Requirement
24 CFR 570. 200( h) is waived to the extent necessary to allow entitlement jurisdictions
receiving a direct CDBG -R allocation under this notice to incur pre -award costs as if each
was a new grantee preparing to receive its first allocation of CDBG funds. In accordance
with OMB Circular A -87, Attachment B, paragraph 31, 24 CFR 570. 200( h) is similarly
applied to States. A CDBG -R grantee will be allowed to incur costs necessary to develop the
CDBG. R substantial amendment to its action plan and undertake other administrative actions
necessary to receive its grant, prior to the costs being included in the final plan, and to incur
activity -specific costs as of the date the substantial is submitted to HUD, provided that the
other conditions of 24 CFR 570.200( h) are met. For units of general local governments
funded:by a state, 24 CFR 570.489(b) applies unmodified. 24 CFR 570. 200( h) is waived to
the extent necessary to prohibit a grantee from using CDBG -R funds for reimbursement of
pre -award costs incurred against the grantee' s regular CDBG funding.
C. Recovery Act Requirements for CDBG -R Expenditures
W41
Title XII of Division A of the Recovery Act requires that in selecting CDBG -R
projects to be funded, recipients shall give priority to projects that can award contracts based
on bids within 120 calendar days from the date the funds are made available to the recipients.
Section 1602 of the Recovery Act requires that grantees shall use grant funds in a
manner that maximizes job creation and economic benefit. Section 1602 also states that,
when CDBG -R funds are being used for infrastructure investments, grantees must give
preference to activities that can be started and completed expeditiously, including a goal to
obligate at least 50 percent of the funds for activities that can be initiated within 120 days of
enactment of the Recovery Act.
HUD has defined the term " use" for purposes of these requirements to mean
obligation of funds. HUD is adopting the definition of "obligation" as it appears in 24 CFR
85. 3 for all grantees, including states, to mean the amount of orders placed, contracts and
sub -grants awarded, goods and services received, and similar transactions during a given
period that will require payment by the grantee during the same or a future period.
Section 1605 of the Recovery Act requires that all iron, steel and manufactured goods
used in construction, alteration, repair, or maintenance of a public building or public work
project assisted with funds under the Recovery Act must be produced in the United States,
unless the Secretary finds that: the requirement is inconsistent with public interest; those
goods are not reasonably available or produced in sufficient quantity in the U. S.; or the use of
the goods will increase the project cost by more than 25 percent. Grantees must request a
waiver.of this provision if, in the process of carrying out an eligible activity, one of these
conditions arises. If the Secretary determines that it is necessary to waive this requirement,
he must publish in the Federal Register a detailed written justification why the requirement
27
was waived; therefore, all grantees are expected to adhere to these provisions. These
requirements must be applied consistent with U. S. obligations under international
agreements. To streamline compliance with the provision of Section 1605 in detennining the
project cost using American -made materials, grantees may want to consider acquiring two
cost estimates with bids: one with only American -made materials and the other with any
materials.
Section 1604 of the Recovery Act prohibits CDBG -R funds fi-om being used for any
pool. In
casino or other gambling establishment, aquarium, zoo, golf course, or swimming
This
applying this prohibition, HUD will interpret the definitions of these tenns broadly.
requirement is further discussed in section ILE. of this notice.
Section 1512 of the Recovery Act requires that for each activity carried out with
CDBG -R funds, grantees must report on the number of jobs estimated to be created or
retained. This reporting requirement applies to all activities, and is unrelated to the reporting
ofjobs for purposes of meeting the low- and moderate- income benefit national objective
requirements. This requirement is further discussed under section II.G of this notice.
As part of the CDBG -R substantial amendment, grantees will be required to submit
certifications regarding these requirements.
D. Program Income Requirements
Any program income generated from the use of CDBG -R funds will be treated as
program income to the regular CDBG program, not as program income to the CDBG -R
program. HUD is waiving a number of statutory and regulatory provisions to implement this
requirement, many of which are described in Section F. below. 24 CFR 85. 21 and 24 CFR
570. 504 ( for entitlements) and 24 CFR 570. 489( e)( 3) and 31 CFR part 205 ( for states),
require grantees and subrecipients to disburse program income before requesting additional
cash withdrawals of regular CDBG funds from the U.S. Treasury. Those requirements will
not apply to the drawdown of CDBG --R funds.
In the regular CDBG program, 24 CFR 570. 301( b) provides for float- funded
activities and guarantees, a short -term financing mechanism which allows a grantee to use
undisbursed funds in its line of credit and CDBG prograrn account that are budgeted in action
plans for one or more other activities that do not need the funds immediately. Each activity
carried out using the float must meet all CDBG requirements and must be expected to
produce program
