September 2, 2025

Okaloosa County BOCC — September 2, 2025 — fianl.signed-ITB 02-25 Crestview Phase2 Contract

fianl.signed-ITB 02-25 Crestview Phase2 Contract in the September 2, 2025 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the September 2, 2025 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1946). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used March 1, 2025; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
fianl.signed-ITB_02-25_Crestview_Phase2_Contract
Date
September 2, 2025
Publisher
Okaloosa County Board of County Commissioners
Where to find it
248
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Every preserved file is checksummed with SHA-256 when it is added, so any later change to the stored bytes would show. That confirms the file is unchanged since ingest — it does not prove the file matches the original source, who produced it, or when it was captured.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

fianl.signed-ITB 02-25 Crestview Phase2 Contract — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 727.5 KB · 248

Download ↓

fianl.signed-ITB 02-25 Crestview Phase2 Contract — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 23.9 MB · 248

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

fianl.signed-ITB 02-25 Crestview Phase2 Contract — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Crestview Sidewalk Phase 2 August 05, 2025 DOCUMENT 00520 –AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT THIS AGREEMENT is by and between Okaloosa County, a political subdivision of the State of Florida, by and through its Board of County Commissioners, situated at 1250 N. Eglin Parkway, Shalimar, Florida (“OWNER”) and Chavers Construction, Inc. of 801 Virecent Rd. Cantonment, FL 32534, certified to do business in the State of Florida (“CONTRACTOR”). OWNER and CONTRACTOR hereby agree as follows: ARTICLE 1 – WORK 1.01 CONTRACTOR shall complete all WORK as specified or indicated in the Contract Documents. The WORK is generally described as follows: Crestview Sidewalk – Phase 2. ARTICLE 2 – THE PROJECT 2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: The Project consists of installation of a 5' wide sidewalk along Industrial Drive, Long Drive, and Commerce Drive The work is further defined as shown on the Plans and as described by the Contract. ARTICLE 3 – ENGINEER 3.01 The part of the Project that pertains to the WORK has been designed by Donald R. Petrey (Design Engineer). 3.02 The OWNER has retained the County Engineer (“ENGINEER”) to act as OWNER’s representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4 – CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times: Days A. The Work will be substantially completed within 120 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 165 calendar days after the date when the Contract Times commence to run. 4.03 Liquidated Damages A. Section 337.18(2) of the Florida Statutes, requires the OWNER adopt regulations for the determination of default and provisions that the Contractor pay liquidated damages (daily Agreement Between Owner and Contractor for Construction Contract Page 00520-1 Crestview Sidewalk Phase 2 August 05, 2025 charge per calendar day) for any failure of the Contractor to complete the Contract work within the Contract Time. B. Applicable liquidated damages are based on the total award of the contract. C. CONTRACTOR and OWNER recognize that time is of the essence as stated in Paragraph 4.01 above and that OWNER will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay. 1. Substantial Completion: CONTRACTOR shall pay OWNER $1,685 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph

Download this text file with its original spacing ↓

Read all text · 62 parts →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — September 2, 2025 — fianl.signed-ITB 02-25 Crestview Phase2 Contract.” September 2, 2025. fianl.signed-ITB_02-25_Crestview_Phase2_Contract. Crypt of Echoes evidence ID LED-2026-5bc4ff82b342437096f111fd0eb0cc9f. https://cryptofechoes.com/evidence/LED-2026-5bc4ff82b342437096f111fd0eb0cc9f. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, fianl.signed-ITB 02-25 Crestview Phase2 Contract, meeting materials for September 2, 2025. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=47316&MeetingID=1946

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓