READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — February 26, 2015 — Agenda Packet — reading text
Part 9 of 30. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
property owners. Match may be cash
paid to implement the retrofit as documented by paid invoices to electricians or
DEP Agreement No. _____, Page 12 of 16
Packet Pg. 39
1.d.a
DEP Agreement No. _____
FWC Agreement No. _____
Attachment: I.d. FWC Turtle Lighting Grant (3886 : FWC/FDEP Turtle Friendly Lighting Retrofit Grant (Jim Trifilio))
construction companies or in-kind match for project implementation. Different bulbs or
fixtures may be substituted for the identified light provided FWC has reviewed and
approved all such substitutions prior to purchase and installation. A list of property
owners who do not participate in the retrofit lights or negotiate any in-kind match will be
provided.
• County or their agent will develop a good faith agreement with property owners which will
include at a minimum, a summary of lighting work to be completed, and a project report
which can include any projected expenses and matching dollars or in-kind contributions.
• The County or their agent and property owner shall install the retrofit identified for that
property, including cost estimates, the financial or in-kind match, and a project timeline. The
plan should specify the fixture and bulb type, and any electrical installation work. County
shall document in writing with pre and post-retrofit photographs.
• County or their agent will work with the electrician/electrical contractor to ensure fixtures
are installed properly.
• All reports and copies of good faith agreements between property owners/associations
will to be submitted quarterly.
Deliverable: Grantee or its agent shall produce report detailing the status and phase of retrofit
property, actions taken to date, and costs incurred. Agreement between the parties will be
provided as properties are retrofitted. Digital photographs documenting retrofits will also be
provided for each retrofit as part of the quarterly report. Each report will list the number of
unshielded light fixtures and short wavelength bulbs replaced with sea turtle friendly lighting,
number of glass windows or doors tinted, installation of window coverings, or other actions
consistent with IDA recommendations. Total costs for each conservation land and adjacent
properties with matching fund contributions will be reported.
Metric: List of properties successfully retrofitted; number of lights and fixtures replaced; length
of beach along property made darker, date retrofit was completed.
Timeline: Reports shall be submitted quarterly.
Task 3: Provide narrative progress reports (may incorporate charts, tables or spreadsheets) to
demonstrate a decrease in the number of private properties with problematic lighting, a decrease
in unshielded light fixtures and short wavelength bulbs.
Deliverable: Narrative quarterly report demonstrating progress with retrofit lighting fixtures and
if possible impact on number of sea turtle disorientation at same properties. Include any other
reports which also might demonstrate increased awareness among beachfront property owners.
Metric: List of properties which show decrease with problematic lighting for sea turtles and a
decrease in unshielded light fixtures.
DEP Agreement No. _____, Page 13 of 16
Packet Pg. 40
1.d.a
DEP Agreement No. _____
FWC Agreement No. _____
Attachment: I.d. FWC Turtle Lighting Grant (3886 : FWC/FDEP Turtle Friendly Lighting Retrofit Grant (Jim Trifilio))
Timeline: Reports shall be submitted quarterly until all retrofits have been completed.
Responsibilities of the FWC and DEP:
The FWC/DEP will provide and/or support Grantee during the task assignments period as follows:
1. Review of spreadsheet with listing of successful and unsuccessful attempts in contacting property
owners.
2. Review and approval of specific bulbs/fixtures proposed to be purchased.
3. Review of the good faith agreements or cost effective design for lighting for property owners,
which will include at a minimum, summary of lighting work to be completed, a projected budget
documenting requested match in cash, paid services, or in-kind, digital photographs documenting
project, receipts for equipment purchases and installation and any in-kind matching by property
owners.
4. Review narrative reports from county for progress, completion and success of the retrofits.
Schedule:
Description/Timeframe/Task
Review of spreadsheet for contacting all property owners
Within 3 months of the grant award-Task 1
Review of the agreements or cost effective design plan
Within 3 months of the grant award-Task 2
Progress Reports-Quarterly-Task 3
DEP Agreement No. _____, Page 14 of 16
Packet Pg. 41
1.d.a
DEP Agreement No. _____
FWC Agreement No. _____
Attachment: I.d. FWC Turtle Lighting Grant (3886 : FWC/FDEP Turtle Friendly Lighting Retrofit Grant (Jim Trifilio))
Budget Category DWH Funds Comment [k3]: This section will also need to be
filled in. It should match the cost benefit analysis
provided by DEP.
1. Salaries 0.00
2. Fringe Benefits 0.00
3. Travel ______________
4. Equipment Purchases ______________
5. Supplies 0.00
6. Contractual Services $ 0.00
7. Other Expenses ______________
Total $0.00
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
DEP Agreement No. _____, Page 15 of 16
Packet Pg. 42
DEP Agreement No. _____, Page 16 of 16
DEP Agreement No. _____
FWC Agreement No. _____
1.d.a
Packet Pg. 43
Attachment: I.d. FWC Turtle Lighting Grant (3886 : FWC/FDEP Turtle Friendly Lighting Retrofit Grant (Jim Trifilio))
1.d.a
DEP BUDGET-COST ANALYSIS FORM
PROJECT TITLE:Retrofit lights for Okaloosa Parks and adjacent properties.______________________________________________________________________________________________________________________________________
Attachment: I.d. FWC Turtle Lighting Grant (3886 : FWC/FDEP Turtle Friendly Lighting Retrofit Grant (Jim
BUDGET DETAIL COST ANALYSIS
Budget items below to be provided by the Contractor. See attached instructions. Cost Analysis to be completed by the Department Contract Manager. See attached
2020 instructions.
COMMENTS
1. PERSONNEL EXPENSES Allowable Reasonable Necessary (Basis for Decision)
A. Salaries - (Name/Title/Position) Hourly Cost ($) Hours Totals ($)
* = -
* = 0
* = 0
* = 0
* = 0
* = 0
Total Salaries -
B. Fringe Benefits (Rate% * Total salaries applicable) Rate % Total Sal. App.
