READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2021-16--Amend Comprehensive Fee Schedule--FY 21-22 — reading text

Part 8 of 20. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-40315-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Amendment to Development Order 450. 00 Res 2012- 15 06/26/ 12 Re- advertisement Fee Direct Cost of the Advertisement Res. 2016- 11 09/20/ 16 Site Plan Reviews- new construction commercial or 4 units or more multifamily residential Gross Building Floor Area or Improved Site Area whichever is greater cost per 100 sq ft Res 2012- 15 06/ 26/ 12 Up to 5, 000 sq feet 1. 50 1. 50 Res. 2010-25 09/28/ 10 Site Plan Review fee 5, 001 to 10, 000 1. 35 1. 35 added to permit fee Res. 2010-25 09/28/ 10 10, 001 to 25, 000 1. 15 1. 15 Res. 2010-25 09/ 28/ 10 25, 001 to 50, 000 1. 00 1. 00 Res. 2010- 25 09/ 28/ 10 _ 50,001 to 100, 000 0. 90 0. 90 Res. 2010- 25 09/ 28/ 10 over 100, 000 0. 85 0. 85 Res. 2010- 25 09/ 28/ 10 U:\ Finance\ Finance\ Fee Schedule\ 2021, September\ 20. 10. 1 Comprehensive Fee Schedule- MB Version Enacting Resolution/ Department and/ or Current Rate Fee Description Ordinance Service BUILDING PERMIT FEES( Sec. 3.02. 051* Res. 2010-25 09/ 28/ 10 for the purposes stated in F. S. 468. 631 and F. S. 553. 721. A surcharge will be collected in accordance with and General Fees 22. 50 Res. 2010- 25 09/ 28/ 10 Building permit processing fee 25. 75 per submittal SFD 51. 50 per submittal MF 77. 25 per Res 2008- 15 04/ 08/ 08 Revisions to approved permit, per submittal submittal Com Penalty for commencement prior to permitting 300% of permit fee or$ 250, whichever is greater Res 07- 15 09/ 05/ 07 Sec. 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03 Sec. 3. 01. 12) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Expired permit( Sec. 3. 01. 08) Conditional; no work has commenced and permit has Res 07- 15 09/ 05/ 07 Refund of permit fee( Sec. 3. 01. 10) not expired; requires written notice to the BO Construction Permit Fees No permit required for cosmetic work only, such as carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07 500 or less include any structural change or any work that requires an inspection per the FBC. 39. 00 for the first thousand, plus$ 6.60 for each Res. 2010- 25 09/ 28/ 10 501 to$ 50, 000 thousand or fraction thereof, to and including$ 50, 000 Permit based on value of work, includes labor, 360.55 for first$ 50,000 plus$ 5. 25 for each materials, site work, additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 50, 001 to$ 100, 000 and design fees $ including$ 100, 000 623. 00 for the first$ 100,000 plus$ 4.00 for each additional thousand or fraction thereof to and Res. 2010- 25 09/28/ 10 100, 001 to$ 500, 000 including$ 500,000 2, 219. 00 for the first$ 500,000 plus$ 2. 75 for each Res. 2010- 25 09/28/ 10 500, 001 and up additional thousand or fraction thereof 50% of building fee( Sec. 3. 02. 06) Res 2009- 35 09/ 09/09 Plan check fee 206. 00 Res 2008- 15 04/ 08/08 Threshold building transmittal/ processing fee/ ICC 113. 50 Res 2008- 15 04/ 08/ 08 Moving Fee 59. 50 plus$ 9. 45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/28/ 10 Demolition Fee or fraction thereof 38.00 Res. 2010- 25 09/28/ 10 Additional Inspection Fee 50. 00 per hour( 2 hour minimum) Res 2014- 2 02/ 11/ 14 Additional Inspection Fee- after hours First-$ 38. 00 Re- Inspection Fee( the building inspector returns to Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10 the job site to review corrected work denied on the Third and more-$ 115. 50 previous inspection for the same violation) 38. 00 Res. 2010-25 09/28/ 10 Certificate of Occupancy 38. 00 Res. 2010- 25 09/ 28/ 10 Certificate of Completion 270. 50 Res. 2010- 25 09/28/ 10 Temporary Certificate of Occupancy Mechanical Permits and Inspection 39. 00 Res. 2010-25 09/ 28/ 10 Permit Fee Base 15. 00 for the first$ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10 refrigeration systems conditioning and 1, 000 or fraction thereof additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or Res. 2010- 25 09/ 28/ 10 Inspecting repairs, alterations, and

Download this text file with its original spacing ↓