Amendment to Development Order
450. 00 Res 2012- 15 06/26/ 12
Re- advertisement Fee
Direct Cost of the Advertisement
Res. 2016- 11 09/20/ 16
Site Plan Reviews- new construction commercial or 4 units or more multifamily residential
Gross Building Floor Area or Improved Site Area
whichever is greater cost per 100 sq ft Res 2012- 15 06/ 26/ 12
Up to 5, 000 sq feet 1. 50 1. 50 Res. 2010-25 09/28/ 10
Site Plan Review fee 5, 001 to 10, 000
1. 35 1. 35
added to permit fee
Res. 2010-25 09/28/ 10
10, 001 to 25, 000
1. 15 1. 15
Res. 2010-25 09/ 28/ 10
25, 001 to 50, 000
1. 00 1. 00 Res. 2010- 25 09/ 28/ 10 _
50,001 to 100, 000
0. 90 0. 90 Res. 2010- 25 09/ 28/ 10
over 100, 000
0. 85 0. 85 Res. 2010- 25 09/ 28/ 10
U:\ Finance\ Finance\ Fee Schedule\ 2021, September\
20. 10. 1 Comprehensive Fee Schedule- MB Version
Enacting Resolution/
Department and/ or Current Rate
Fee Description Ordinance
Service
BUILDING PERMIT FEES( Sec. 3.02. 051*
Res. 2010-25 09/ 28/ 10
for the purposes stated in F. S. 468. 631 and F. S. 553. 721.
A surcharge will be collected in accordance with and
General Fees
22. 50 Res. 2010- 25 09/ 28/ 10
Building permit processing fee
25. 75 per submittal SFD 51. 50
per submittal MF 77. 25 per Res 2008- 15 04/ 08/ 08
Revisions to approved permit, per submittal
submittal Com
Penalty for commencement prior to permitting 300% of permit fee or$ 250, whichever is greater Res 07- 15 09/ 05/ 07
Sec. 3. 01. 05)
Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03
Sec. 3. 01. 12)
Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07
Expired permit( Sec. 3. 01. 08)
Conditional; no work has commenced and permit has
Res 07- 15 09/ 05/ 07
Refund of permit fee( Sec. 3. 01. 10)
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
carpet, tile, painting, landscaping, etc. Exceptions Res 07- 15 09/ 05/ 07
500 or less
include any structural change or any work that
requires an inspection per the FBC.
39. 00 for the first thousand, plus$ 6.60 for each Res. 2010- 25 09/ 28/ 10
501 to$ 50, 000 thousand or fraction thereof, to and including$ 50, 000
Permit based on value
of work, includes labor,
360.55 for first$ 50,000 plus$ 5. 25 for each
materials, site work,
additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
50, 001 to$ 100, 000
and design fees $
including$ 100, 000
623. 00 for the first$ 100,000 plus$ 4.00 for each
additional thousand or fraction thereof to and Res. 2010- 25 09/28/ 10
100, 001 to$ 500, 000
including$ 500,000
2, 219. 00 for the first$ 500,000 plus$ 2. 75 for each Res. 2010- 25 09/28/ 10
500, 001 and up additional thousand or fraction thereof
50% of building fee( Sec. 3. 02. 06) Res 2009- 35 09/ 09/09
Plan check fee
206. 00 Res 2008- 15 04/ 08/08
Threshold building transmittal/ processing fee/ ICC
113. 50 Res 2008- 15 04/ 08/ 08
Moving Fee
59. 50 plus$ 9. 45 per 2, 000 sq ft above 20, 000 sq ft Res. 2010- 25 09/28/ 10
Demolition Fee or fraction thereof
38.00 Res. 2010- 25 09/28/ 10
Additional Inspection Fee
50. 00 per hour( 2 hour minimum)
Res 2014- 2 02/ 11/ 14
Additional Inspection Fee- after hours
First-$ 38. 00
Re- Inspection Fee( the building inspector returns to
Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10
the job site to review corrected work
denied on the
Third and more-$ 115. 50
previous inspection for the same violation)
38. 00 Res. 2010-25 09/28/ 10
Certificate of Occupancy
38. 00 Res. 2010- 25 09/ 28/ 10
Certificate of Completion
270. 50 Res. 2010- 25 09/28/ 10
Temporary Certificate of Occupancy
Mechanical Permits and Inspection
39. 00 Res. 2010-25 09/ 28/ 10
Permit Fee Base
15. 00 for the first$ 1, 000 or fraction thereof of the
Inspection of heating, ventilation, ductwork, air valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10
refrigeration systems
conditioning and 1, 000 or fraction thereof
additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or Res. 2010- 25 09/ 28/ 10
Inspecting repairs, alterations, and