Okaloosa County BOCC — September 16, 2014 — Agenda — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 11-Agenda Request_06.17.2014.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: June 17, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Arbennie Pritchett WRF Expansion - Engineering RFQ Award & Contract
Approval
DEPARTMENT: Water and Sewer
BCC DISTRICT: All
STATEMENT OF ISSUE: OCWS and Purchasing staff seek approval to award RFQ #WS 37-
14 to Constantine Engineering to serve as the Owner's Representative and Design Criteria
Professional for the Arbennie Pritchett WRF Expansion Project and to authorize the Chairman to
execute the "Agreement for Consulting Services" with Constantine Engineering for an amount
not to exceed $1,189,400. Staff also requests to move forward with a qualifications based
selection process for a contract with a Design/Build (D/B) Team, as outlined below.
BACKGROUND: On January 7, 2014, the BCC authorized staff to move forward with the
qualifications based selection process (via a RFQ) for a contract with an engineering consultant
for the Arbennie Pritchett WRF Expansion Project. The BCC also approved a Review
Committee to review the Statement of Qualifications submitted by interested engineering firms.
That Agenda Request along with background information on the Arbennie Pritchett WRF
Expansion Project is attached for your review. This previous Agenda Request explains the
project need, funding, and the design-build process/roles.
Since the above-mentioned approvals, OCWS and Purchasing staff worked together to produce
Request for Qualifications (RFQ) # WS 37-14, titled "Design Criteria Professional, Owner's
Representative & Consulting Engineering Services for a Proposed 5 MGD Expansion to
Okaloosa County Water & Sewer's Arbennie Pritchett WRF". This RFQ went through County
Contract Review, and the Coordination Sheet is attached. The RFQ was then advertised via
multiple outlets: 1) newspaper, 2) BidNet, a statewide procurement tool, and 3) emails to
specific engineering firms in the area that have shown interest in past Engineering RFQs for
County projects.
Upon the March 28, 2014 deadline listed in the RFQ, one engineering firm submitted a
Statement of Qualifications - Constantine Engineering. The individuals of the Review
Committee reviewed Constantine's submittal, and deemed that they were a qualified engineering
firm capable of performing the required roles listed in the RFQ. Constantine was Program
Manager and Owner's Representative for the $65M program to construct the original Arbennie
Pritchett WRF and related sub-projects that concluded in 2011. They have also been pivotal in
other related wastewater projects, such as Ft. Walton Beach Consolidation, 7th Special Forces,
Eglin Main Base, and Niceville/Valparaiso (diverting East County flow).
After the Review Committee meeting, staff then negotiated a professional services agreement
with Constantine Engineering for them to serve as the Owner's Representative, Design Criteria
Professional, and perform other engineering services. The attached "Agreement for Consulting
Services" (Agreement) with Constantine Engineering is attached for your review, consideration,
and approval. Along with the Agreement, attached is Exhibit A (scope of work), Exhibit B
(compensation), and the County Contract Review Coordination Sheet.
Please recall that this is a design-build project, budgeted at $13M in the Capital Improvement
Program (CIP) years FY2014-FY2016. Of that budget, with the execution of this Agreement, an
amount not to exceed $1,184,900 would be under contract with Constantine. Over $11M would
be slated for the actual design/build construction, whereby a Design/Build Team would be under
contract in the future to produce the design and perform the construction. As the Owner's
Representative, Constantine would be overseeing the project in the following manner
summarized as: serve as the Design Criteria Professional; prepare the RFQ (for Design/Build
Team), the Request for Proposal (RFP), and the Design Criteria Package (DCP; performance
specifications and preliminary engineering); evaluate Statement of Qualifications and bids;
perform engineer's cost estimates; groundwater modeling; permitting; engineering services
during construction; resident observation; develop and manage Owner Purchased Equipment
(OPE) program; coordinate complete system startup; construction administration; perform any
miscellaneous engineering and technical service required in support of the project and
specifically requested by the County. A more thorough explanation is included with Exhibit A.
With the approval of this Agreement, Constantine's first major task would be to draft the RFQ
for a Design/Build (D/B) Team. Therefore, staff is also requesting to move forward with a
qualifications based selection process for a contract with a D/B Team, with the following
process:
- Constantine to prepare the RFQ for staff's consideration. Staff will then review and finalize the
RFQ.
- Purchasing Staff to advertise RFQ and oversee.
- Upon receiving submissions from interested D/B Teams, on behalf of the County, Constantine
to serve as the technical expert to evaluate the D/B Teams using pass/fail criteria and provide a
recommendation to the OCWS Staff as to the elimination of any firm that failed to meet the
minimum standards. OCWS Staff will then meet and evaluate those that meet the minimum
requirement to arrive at the short-list of D/B Teams.
- Constantine to prepare the DCP and RFP for staff's consideration. RFP would go through
County Contract Review. The DCP is a technical document - preliminary drawings and
performance specifications.
- RFP and DCP to be issued to short-listed D/B Teams.
- OCWS Staff and Constantine will hold a mandatory pre-proposal meeting with all short-listed
D/B Teams present. In addition, Proprietary Meetings will be held with each of the short-listed
D/B Teams to discuss confidential conceptual design ideas.
- Upon receiving the proposals from the D/B Team, the following Review Committee would
review:
Zan Fedorak or designee - Purchasing Manager (non-voting member to
oversee)
Nathan Boyles - Board of County Commissioners, Water & Sewer Liaison
Jeff Littrell - Water & Sewer, Director
Jeb Chessher - Water & Sewer, Project Manager
Darren Alford - Water & Sewer, Wastewater Operations Manager
Jason Autrey - Public Works, County Engineer
- Upon the Review Committee selecting the most qualified D/B Team to be recommended to the
BCC, OCWS Staff and Constantine would then open up the price envelope (a separate cost
proposal from the qualifications proposal), and then proceed to negotiate a contract with the D/B
Team. Florida Statutes 287.055 (AKA "Consultants' Competitive Negotiation Act (CCNA)")
will be followed and adhered to. This was also explained in the Jan. 7, 2014 Agenda Request.
-Resulting Agreement with the selected D/B Team would then be routed through County
Contract Review and then be brought to the BCC for approval and execution.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS and Purchasing staff recommend BCC approval to award
RFQ #WS 37-14 to Constantine Engineering to serve as the Owner's Representative and Design
Criteria Professional for the Arbennie Pritchett WRF Expansion Project and to authorize the
Chairman to execute the "Agreement for Consulting Services" with Constantine Engineering for
an amount not to exceed $1,189,400. Staff also recommend to move forward with a
qualifications based selection process for a contract with a Design/Build (D/B) Team, as outlined
above.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator