Fort Walton Beach Council agenda — 03-23-2010 Special-Soundside Develp. Project — reading text
Part 3 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25154-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
infrastructure improvements, which will be completed by
are estimated at
City personnel or the City' s annual contractors,
1, 550,000. This includes the installation of the potable water system, fire
suppression system, sanitary sewer system, stormwater drainage system,
sidewalks, curb and gutter, and road and parking area paving.
2. 2. 3 The projected site preparation and restoration costs are estimated at
250, 000.
2. 2. 4 The estimated cash contribution from the City is $ 500, 000 and includes
the pre- closing costs and bond fees.
5-
2.3 The total fiinding request is not -to- exceed $ 2, 500, 000 with all but $ 500, 000
consisting of in -kind services for the demolition and infrastructure improvements
to serve the development.
2. 3. 1 The $ 2, 500, 000 investment by the City will be in the form of a loan to the
FWBHA.
2. 3. 2 The terms of the loan would be included in an interlocal agreement
between the City and the FWBHA that would be developed by the City
Manager, Finance Director, Engineering & Utility Services Director, and
City Attorney and approved by City Council.
2. 3. 3 No funds for the in -kind services will be expended by the City prior to the
interlocal agreement being approved by City Council.
2. 4 The City has been coordinating with the FWBHA and HomeCorp to explore all
options for financing the development. The most viable option is the Build
America Bond ( BAB) program, which is a Federal stimulus program
implemented through the American Recovery and Reinvestment Act of 2009
ARRA).
2. 4. 1 The BAB program permits issuers of certain governmental municipal
bonds to elect to have interest treated as includable in gross income for
federal tax purposes and to receive a cash subsidy payment from the U.S.
Treasury equal to 35% of the interest payable on the bonds. These bonds
are called " Direct Subsidy Build America Bonds ".
2. 4. 2 Between April 15, 2009 and January 28, 2010, there were 878 issues of
BABs totaling $ 71 billion, or approximately 24 %, of the $ 301 billion of
municipal bonds issued during this period.
2. 4. 3 The Build America Bond program is scheduled to sunset on December 31,
2010, but the Obama Administration is proposing to continue the BAB
program in perpetuity but lower the cash subsidy to 27% of the interest.
2. 5 The basic requirements of the BAB program include:
2. 5. 1 The issuer of the bonds and the user of the facilities financed each must be
a state or apolitical subdivision of a state, which the FWBHA qualifies as.
The issuer and the borrower may be the same public entity which is the
case for the Sound Side Affordable Housing development.
2.6 HUD has recently agreed to " wrap" a portion of the BAB cash subsidy stream
into the mortgage loan underwriting, which will enable the FWBHA to achieve
maximum : proceeds. HUD can only insure up to 90% of the total mortgage
amount.
2. 6. 1 This will allow the FWBHA to utilize the BAB cash subsidy to offset any
shortfalls in operating expenses while filling the 200 units in Sound Side.
6-
2. 7 The Build America Bond program would allow the FWBHA to repay the City' s
contribution over a period of time based on the details of the interlocal agreement
that would be forwarded to HUD and the City Council for review and approval.
2. 8 The estimated project schedule would allow the City to begin demolition within
six months from the date the City' s contribution is approved. Work cannot begin
on the site until a Firm Commitment is given by HUD for insuring the loan. The
overall project schedule is listed below ( all timeframes are based on City Council
23rd
approval at the March Special Council Meeting):
2. 8. 1 45 days to submit the Pre -Application to HUD, including a revised market
study
2. 8. 2 45 days for HUD review
2. 8. 3 30 days to submit the Firm Application
in the issuance of a Firm
2nd
2. 8. 4 45 days for HUD' s review resulting
Commitment from HUD
2. 8. 5 30 days to closing and issuance of the mortgage
3. FINANCIAL INFORMATION:
3. 1 To provide the in -kind services for the project, the City would be required to
purchase the necessary materials for the infrastructure and site work, contract the
demolition services via Invitation to Bid, and provide cash to the FWBHA for
pre- closing costs and Build America Bond fees. The total estimate for the City to
provide the in -kind services is $ 2, 500, 000.
3. 2 The return on investment from the Sound Side Affordable Housing development
includes the following items:
3. 2. 1 The monthly revenue from services provided by the City, including water,
8, 225. The
sanitary sewer, stormwater, and solid waste, is approximately $
annual revenue is $ 98, 700. This estimate is based on a minimum monthly
water consumption of 2, 000 gallons per unit.
3. 2. 2 The projected ad valorem revenue or Payment In Lieu of Taxes ( PILOT)
is estimated at $ 90, 000 to $ 100, 000 per year.
3. 3 The payback mechanisms for the $ 2, 500, 000 loan to the FWBHA will be in the
form of the following:
3. 3. 1 The Build America Bond program issues a cash subsidy of 35% of the
interest, which would allow the City to recoup the in -kind and cash
contribution over a period of time. The payback terms would be included
in the interlocal agreement between the City and the FWBHA.
3. 4 HomeCorp' s typical occupancy goal is to have at least 80%
of the units rented
within six to eight months of project completion. The total construction schedule
7-
for this project is 12 to 18 months. The units will be rented as soon as each
building is completed.
3. 5 The CRA Fund Balance is $ 3, 207, 305 as of September 30, 2009. The
disbursement of funds would occur over an 18 -month period starting with the
initial disbursement of the pre- closing costs and the bond fees.
3. 5. 1 Based on the proposed timeline to close the loan and begin construction, a
cash flow analysis has been completed and is attached to this report.
4. RECOMMENDATION:
4. 1 At the March 17, 2010, CRA Special Meeting, the CRA Board of Commissioners
voted unanimously ( 6 -0) to utilize up to $ 2, 500, 000 in CRA Fund Balance to
provide in -kind services in form of cash, labor, and materials to allow the Sound
Side Affordable Housing development to proceed with submitting the necessary
items to HUD to secure a conventional loan and proceed with the Build America
Bond program.
5. STAFF RECOMMENDATION:
5. 1 Staff requests City Council approval of Resolution 2010 -12 to utilize CRA funds
to provide in -kind services in the not -to- exceed amount of $2, 500, 000 in the form
of cash, labor, and materials to allow the Sound Side Affordable Housing
development to proceed with submitting the necessary items to HUD to secure a
conventional loan and proceed with the Build America Bond program.
5. 1. 1 The in -kind services include labor and materials for demolition, site
grading, potable water, fire service, sanitary sewer, stormwater, sidewalks,
curb and gutter, paving, and site restoration. The expenditures for these
items would be encumbered over the 12- to 18 -month schedule for the
proj ect.
5. 1. 1.. 1 The demolition work will be contracted out via Invitation to Bid,
and the paving work will be completed by the City' s annual paving
contractor.
5. 1. 2 Approximately $ 500, 000 in cash would be required for the pre- closing
costs and bond fees. The cash would be required between City Council
approval of the funding and closing of the loan, which would occur in
approximately six months.
5. 2 Staff also requests City Council authorization for the City Manager, City
Attorney, Finance Director, and Engineering & Utility Services Director to
develop an interlocal agreement with the FWBHA that will include the payback
terms of the; $ 2, 500, 000. The final interlocal agreement will be forwarded to HUD
and City Council for final approval.
8-
0 0 0 0 0 0 0 0 ":..LO O M
N OU') d O O O O N :: N O O ...•
B O N N O O Lf) 0 0 00 O
00 x L I i 0 0 M O M N O M
O M 00 O O In Ln • M l0 f
D ti U*) N CO In I` LO N f
r
aa
N
0=0=
O QQ
N
O OO
M
LLLL
d' C_C_
0) U)U)
NN
NN
O N UU
0=0=
d p NN