READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 03-24-05 — reading text

Part 14 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-10028-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

programs). pump-out facilities and water quality monitoring I Complete watershed mapping and delineation project outlining the various drainage basins within the City. Evaluate funding options for various water and sewer capital improvement I projects and initiate construction. Revise Utility Ordinance as necessary to ensure the goals of the Water Quality Initiative are met ( Grease Trap Inspections and Septic Tank Removal). I Implement a Geographic Information System for the Water Quality Initiative. Outline environmental compliance strategy for upcoming year. I EnPineerinl! The Engineering Division is responsible for providing the City with survey and design data for drainage, water, and sewer projects. This Division coordinates closely with the I other Public Works divisions and the CDS Department. Engineering reviews all site plans, subdivision plans, and as- built drawings for compliance to City codes and outside agency requirements. The Division produces all mapping for the City, including street I maps, land-use maps and zoning maps as well as mapping required for the Comp Plan amendments and newspaper advertisements. This Division coordinates with various outside agencies such as DEP, DOT and Okaloosa County Engineering. This Division I 40 ft III

Download this text file with its original spacing ↓