READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 16, 2016 — Access EC Rider TDP - August Draft Report — reading text
Part 48 of 52. These parts divide the reading text for browsing; they are not the source document's page numbers.
Access EC Rider TDP - August Draft Report — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
the following:
A statewide, multimodal transportation system that supports Florida’s economic and livability goals
by providing better connectivity to both urban and rural areas.
Greater reliance on public transportation systems for moving people, including statewide
passenger rail network and enhanced transit systems in Florida major urban areas.
A statewide, multimodal system of trade gateways, logistics centers, and transportation corridors
to position Florida as a global hub for commerce and investment.
An evolving air and space transportation system enabling Florida to remain a global leader for
moving people and cargo between Florida and destinations in other states, nations, and orbit.
A new generation of infrastructure, vehicles, fuels, and technologies to enable travel with fewer
crashes, reduced delay, and fewer emissions.
Based on these core values of the 2060 FTP, public transportation plays an important role in shaping the
Florida’s transportation systems in the future. This implicates the necessities for Citrus County to comply
with the 2060 FTP by implementing more rigorous public transportation development approach.
State of Florida TD 5-Year/20-Year Plan
Developed by the Commission for the Transportation Disadvantaged (CTD), this plan is required under
Florida Statutes and includes the following elements:
Explanation of the Florida Coordinated Transportation System
Five-Year Report Card
Florida Office of Program Policy Analysis and Government Accountability Review
Strategic Vision and Goals, Objectives, and Measures
The long-range and five-year strategic visions were reviewed and used for guidance and are indicated
below.
Long-Range Strategic Vision
Create a strategy for the Florida CTD to support the development of a universal transportation system with
the following features:
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan E-2
Appendix E: Plans and Studies Review
Coordinated, cost-effective multimodal transportation system delivered through public-private
partnerships.
Single, uniform funding system with a single eligibility determination process.
Sliding scale of fare payment based on a person’s ability to pay.
Use of electronic fare media for all passengers.
Services designed and implemented regionally (both inter-county and inter-city) throughout the
state.
Five-Year Strategic Vision
Develop and field-test a model community transportation system for persons who are transportation
disadvantaged by incorporating the following features:
Statewide coordination of community transportation services using Advanced Public Transportation
Systems (APTS) including Smart Traveler Technology, Smart Vehicle Technology, and Smart
Intermodal Systems.
Statewide coordination and consolidation of community transportation funding sources.
Statewide information management system for tracking passenger eligibility determination.
Integration of Smart Vehicle Technology on a statewide multimodal basis to improve vehicle and
fleet planning, scheduling, and operations. This effort includes vehicle and ridership data collection,
electronic fare media, and geographic information system (GIS) applications.
Development of a multimodal transportation network to optimize the transportation system as a
whole, using Smart Intermodal Systems. This feature would be available in all areas of the state via
electronic access.
Florida TDP Requirements (updated August 2009)
A TDP is an FDOT-required, 10-year horizon plan intended to support the development of an effective
multimodal transportation system for Florida. Public transit means the transporting of people by
conveyances, or systems of conveyances, traveling on land or water, local or regional in nature and
available for use by the public. TDPs serve a number of purposes for transit agencies; however, the State’s
interest in TDPs is governed by Sections 339.135, and 339.155, F.S., as described in Chapter 14-73 (See
Florida Administrative Code: Rule 14-73.001 or https://www.flrules.org/gateway/RuleNo.asp?id=14-
73.001). The TDP serves as the basis for defining public transit needs, which is a prerequisite to receipt of
State funds. The rule requires that the TDP be the provider’s planning, development, and operational
guidance document.
Beyond these administrative motivations, TDPs are intended to serve as strategic planning documents.
They define public transportation needs; solicit broad input by coordinating with other plans, involve
substantial public participation, and explore community goals with decision makers and other stakeholders;
define alternative courses of action, and develop a systematic plan and monitoring program. Although
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan E-3
Appendix E: Plans and Studies Review
required by FDOT, the greatest value from the TDP planning effort, gathered data, and resultant documents
occurs when an agency uses the TDP to serve the local area and the traveling public by providing a logical,
comprehensive basis for exploring near and mid-term public transit needs and opportunities.
A TDP can lead to a clear identification of transit needs in a community-wide context, a prioritized listing of
recommended actions, a more favorable attitude toward transit by residents, riders, and decision-makers,
and a stronger competitive position for the transit agency in obtaining additional funding. The ultimate
success of the TDP process will not be decided for several years, but it is possible to suggest measures of
success now. These might include increased ridership (as latent mobility needs are met), improved
customer satisfaction, additional funding for the transit system, and a better overall image for transit.
Chapter 341, F.S., Public Transit Block Grants
Chapter 341 creates Public Transit Block Grants (PTBG) to be administered by FDOT. Block grant funds are
provided only to urban and rural providers designated by the U.S. Department of Transportation and
Community Transportation Coordinators, as defined in Chapter 427, F.S. Eligible providers must establish
public transportation development plans consistent, to the maximum extent feasible, with approved local
government comprehensive plans of the units of local government in which the provider is located. In
developing public transportation development plans, eligible providers must solicit comments from
regional workforce boards established under Chapter 445. The development plans must address how the
public transit provider will work with the appropriate regional workforce board to provide services to
participants in the welfare transition program. Eligible providers must provide information to the regional
workforce board serving the county in which the provider is located regarding the availability of
transportation services to assist program participants. Costs for which PTBG program funds may be
expended include:
Costs of public bus transit and local public fixed guideway capital projects
Costs of public bus transit service development and transit corridor projects
Costs of public bus transit operations
All projects must be consistent, to the maximum extent feasible, with the approved local government
comprehensive plans of the units of local government in which the project is located. Chapter 341 also
requires each public transit provider to establish public transportation development plans consistent with
approved local government comprehensive plans where there is an approved local government
comprehensive plan in the political subdivision or political subdivisions in which the public transportation
system is located. In particular, each public transit provider must establish productivity and performance
measures, which must be approved by FDOT and which must be selected from measures developed
pursuant to Section 341.041(3). Each provider must report annually to FDOT relative to these measures. In
approving these measures, FDOT will give consideration to the goals and objectives of each system, the
needs of the local area, and the role for public transit in the local area. In addition, each public transit
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan E-4
Appendix E: Plans and Studies Review
provider must publish the productivity and performance measures established for the year in the local
newspaper of its area and a report that provides quantitative data relative to the attainment of established
productivity and performance measures.
Regional Documents
Okaloosa-Walton TPO 2035 LRTP
Whereas the Comprehensive Plan provides a vision of where the County wants to go, the LRTP is a 20-year
guide for transportation goals and needs that provides the year-by-year methods to reach those
transportation-related goals. Development of a needs plan gives the community an opportunity to visualize
and evaluate possible transportation solutions along with anticipated travel demand. The possible solutions
can be later selected for implementation based on available funding. Although these needs are determined
at the local level, they must be consistent with federal and State requirements to maintain funding. The
Okaloosa-Walton TPO is responsible for updating the LRTP for the urbanized areas of Okaloosa and Walton
counties. The LRTP lists transportation related improvements for roads, public transportation, and
bicycle/pedestrian facilities. The current plan, which includes a planning timeframe through 2035, was
adopted in 2012. The LRTP is updated every five years. It is anticipated that the 2040 LRTP update will be
completed in spring 2017.
With respect to transit, the plan identifies the need for eight park-and-ride lots, multimodal corridors,
several express transit routes, and water transit routes within the region. Table E-1 lists the adopted needs
for express transit service and park-and-ride lots. Note that these needs do not factor the available financial
resources required to fund them, as only 4% of the $6 billion (in 2010 dollars) in estimated needs can be
funded by the TPO.
The Cost Feasible Plan is a plan that factors financial constraints. This plan lists transit improvements
including building five park-and-ride lots, at SR 285 and U S90 (SR 10) at Mossy Head, SR 85 and Commerce
Drive, SR 85 at Rattlesnake Bluff Road, SR 20 and East Bay Loop Road (Freeport), US 331 (SR 83) and
Rockhill Road (CST/CEI FY 16-20), and providing two express transit service from Niceville to Destin and
from Fort Walton Beach to Destin, as summarized in Table E-2. The 2035 Cost Feasible Plan includes transit
funding for operations and maintenance of existing transit services and routes.
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan E-5
Appendix E: Plans and Studies Review
Table E-1: Adopted Needs Plan Table
Project
Roadway From To Improvement
ID
High-Capacity Transit Projects
69 Express Transit Service Crestview Eglin Air Force Base Provide express transit service
70 Express Transit Service Crestview Fort Walton Beach Provide express transit service
Navarre (Santa
71 Express Transit Service Hurlburt Field Provide express transit service
