READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 16, 2016 — Access EC Rider TDP - August Draft Report — reading text
Part 4 of 52. These parts divide the reading text for browsing; they are not the source document's page numbers.
Access EC Rider TDP - August Draft Report — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
public transit service providers
such as Okaloosa County to develop, adopt, and annually update a 10-Year Transit Development Plan (TDP)
to ensure that the provision of public transportation is consistent with the mobility needs of the local
communities. Under legislation that became effective February 20, 2007, the TDP must undergo a Major
Update every five years. Each update must be submitted to the appropriate Florida Department of
Transportation (FDOT) District Office by September 1st.
Major updates involve more substantial reporting requirements than annual minor updates. Development
of the TDP includes a review of planning and policy documents, a documentation of study area conditions,
demographic characteristics, current transit services, creation of a financial plan, and incorporation of
public input through public involvement efforts.
Okaloosa County purchases public transportation operations to run the Emerald Coast (EC) Rider
(previously Okaloosa County Transit) from a private transportation provider. Through these contracted
services, EC Rider provides both deviated fixed-route and paratransit services and operates in the Fort
Walton Beach-Navarre-Wright Urbanized Area and in Crestview, a more rural city north of Eglin Air Force
Base.
This major TDP update, branded the Access EC Rider TDP, was initiated by Okaloosa County in cooperation
with the Okaloosa-Walton Transportation Planning Organization (TPO) to update Okaloosa County’s 10-
year TDP. The Access EC Rider TDP represents the community’s vision for public transportation in its service
area over the next 10 years. This next major update of Okaloosa County’s TDP is due by September 1, 2016,
and will extend the 10-year planning horizon to include FYs 2017–2026.
Objectives of the Plan
State Requirements
According to Rule 14-73.001, Public Transportation, of the Florida Administrative Code (F.A.C.), “The TDP
shall be the applicant’s planning, development and operational guidance document to be used in
developing the Transportation Improvement Program and the Department’s Five Year Work Program.”
The current TDP requirements were adopted by FDOT on February 20, 2007, and include the following:
Major updates must be completed at least once every 5 years, covering a 10-year planning horizon.
Section 1 – Introduction
A public involvement plan must be developed and approved by FDOT or be consistent with the
approved Metropolitan/Transportation Planning Organization’s (M/TPO) public involvement plan.
The Okaloosa-Walton TPO is the TPO serving both Okaloosa and Walton counties.
FDOT, the Regional Workforce Development Board, and the TPO must be advised of all public
meetings at which the TDP is presented and discussed, and these entities must be given the
opportunity to review and comment on the TDP during the development of the mission, goals,
objectives, alternatives, and 10-year implementation program.
Estimation of the community’s demand for transit service (10-year annual projections) using the
planning tools provided by FDOT or a demand estimation technique approved by FDOT must be
included.
An additional requirement for the TDP was added by the Florida Legislature in 2007 when it adopted House
Bill 985. This legislation amended s. 341.071, Florida Statutes (F.S.), requiring transit agencies to “…
specifically address potential enhancements to productivity and performance which would have the effect
of increasing farebox recovery ratio.” FDOT subsequently issued guidance requiring the TDP and each
annual update to include a 1–2-page summary report on the farebox recovery ratio and strategies
implemented and planned to improve it as an appendix item.
Okaloosa County Objectives
In additional to State requirements, the County’s primary goals of developing and implementing the Access
EC Rider TDP are as follows:
Determine strategies to increase ridership and service efficiency within existing service area.
Enhance local and regional transit service connectivity and efficiency.
Increase operating revenue and funding opportunities.
Upon completion, the Access EC Rider TDP will provide a 10-year plan for transit and mobility needs that
incorporate cost and revenue projections, community transit goals, objectives, and policies.
TDP Checklist
This 10-year plan meets the requirement for a major TDP update in accordance with Rule Chapter 14-73,
F.A.C. Table 1-1 provides a list of TDP requirements from Rule 14-73.001. The table also indicates whether
or not the item was accomplished in this 10-year plan as well as where in this document the information
can be found.
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan 2
Section 1 – Introduction
Table 1-1: TDP Checklist
Public Involvement Process TDP Section
√ Public Involvement Plan (PIP) drafted
√ PIP approved by FDOT
√ TDP includes description of Public Involvement Process Section 4, Appendix A
√ Provide notification to FDOT
√ Provide notification to Regional Workforce Board
Situation Appraisal
√ Land use Section 5
√ State and local transportation plans Section 5, Appendix E
√ Other governmental actions and policies Section 5 , Appendix E
√ Socioeconomic trends Section 5
√ Organizational issues Section 5
√ Technology Section 5
√ 10-year annual projections of transit ridership using approved model Section 7
Assessment of whether land uses and urban design patterns support/hinder
√ Section 5
transit service provision
√ Calculate farebox recovery Section 3, Appendix C
Mission and Goals
√ Provider's vision Section 6
√ Provider's mission Section 6
√ Provider's goals Section 6
√ Provider's objectives Section 6
Alternative Courses of Action
√ Develop and evaluate alternative strategies and actions Section 8
√ Benefits and costs of each alternative Section 8
√ Financial alternatives examined Section 8, Section 9
Implementation Program
√ 10-year implementation program Section 9
√ Maps indicating areas to be served Section 8
√ Maps indicating types and levels of service Section 8
√ Monitoring program to track performance measures Section 9, Appendix F
√ 10-year financial plan listing operating and capital expenses Section 9
√ Capital acquisition or construction schedule Section 9
√ Anticipated revenues by source Section 9
Relationship to Other Plans
√ Consistent with Florida Transportation Plan Section 5
√ Consistent with local government comprehensive plan Section 5
√ Consistent with MPO long-range transportation plan Section 5
√ Consistent with regional transportation goals and objectives Section 5
Submission
√ Adopted by Okaloosa County Board of County Commissioners TBD
√ Submitted to FDOT TBD
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan 3
Section 1 – Introduction
Organization of Report
This report is organized into nine major sections (including this introduction).
Section 2 summarizes the Baseline Conditions for Okaloosa County. This includes a review of baseline
conditions—physical description of the study area, a population profile, and demographic and journey-to-
work characteristics. Land use trends, major transit trip generators and attractors, economic factors,
existing roadway conditions, and major employers also are explored.
Section 3 summarizes Existing Transit Services in Okaloosa County. This section includes an overview of
public transportation services and facilities in Okaloosa County. It discusses the results of the trend and
peer review and analysis conducted for fixed-route bus services in Okaloosa County, which reviews the
performance of the public transportation system over time, from fiscal years 2009 to 2013, and compares
the performance of the public transportation system with other transit systems selected as having similar
characteristics.
Section 4 presents the Public Involvement efforts undertaken as part of the Access EC Rider TDP and
summarizes the public involvement activities undertaken. The goal of the public involvement activities is to
increase the likelihood of active participation from citizens and stakeholder agencies during the
development of the updated plan. Input from the public is critical since the 10-year plan provides a
strategic guide for public transportation in the community over the next 10 years.
Section 5 reviews transit policies at the federal, local, and regional levels of government. Transit plans such
as Comprehensive Plans and TDPs were reviewed, as well as various transportation planning and
programming documents, with an emphasis on issues that may have implications for EC Rider. This is
followed by an evaluation of potential revenues for EC Rider. These reviews as well are the previous efforts
in the TPD process are then synthesized to develop the situation appraisal, a State requirement that
assesses EC Rider’s operating environment.
Section 6 discusses goals and objectives, which are an integral part of a transportation plan because they
provide the policy direction to achieve the community’s vision. The goals and objectives presented in this
section were prepared based on the review and assessment of existing conditions, feedback received
during the public involvement process, and the review of local transportation planning documents.
Section 7 discusses the technical analysis of the demand and mobility needs assessment of Okaloosa
County. The assessment techniques are summarized, followed by the results of each analysis used to assess
demand for transit services in Okaloosa County. The
