Relative
Category Criteria Measure of Effectiveness Category
Weighting
Weight
Public Public Level of interest in specific alternatives
30% 30%
Outreach Input (Very High, High, Moderate, Low)
Traditional
Percent of corridor in “High” or “Very High” TOI 15%
Market
Transit Discretionary Percent of corridor in areas that meet “minimum”
15% 40%
Markets Market DTA tier for employment or dwelling unit density
Urban/Regional
Connectivity to urban markets adjacent counties 10%
Market
Trips per hour (T-BEST-generated trips and
Productivity Productivity 15%
revenue hours of service) 30%
& Efficiency
Cost Efficiency Cost per trip (including new trips) 15%
Total 100% 100%
Public Outreach
An extensive public outreach process was conducted for the Access EC Rider TDP planning effort that
resulted in numerous opinions and suggestions on transit services from transit users, non-users, and
various stakeholders. In addition, the public outreach process included discussions with political leaders
and planning advisory committees to gauge their views on transit services. Based on an in depth review of
input from these public outreach efforts, a particular route or type of service was categorized as “Low
Interest,” “Moderate Interest,” or “High Interest” in the alternatives evaluation process.
Transit Markets
For the evaluation of alternatives, three transit markets were identified:
Traditional Market – For the existing population segments that historically have had a higher
propensity to use transit and/or are dependent on public transit for their transportation needs, the
proportion of each corridor operating within a “High” or “Very High” TOI area was calculated.
Discretionary Market – For potential riders living in higher-density areas of the county that may
choose to use transit as a commuting or transportation alternative, the proportion of each corridor
meeting at least the “Minimum” dwelling unit or employment density threshold in the 2015 DTA
was calculated and used for the alternatives evaluation.
Regional Market – Each potential route was assessed for potential regional connectivity. Routes
serving key areas outside of Okaloosa County were considered. Inter-county routes having
connections to adjacent counties were scored higher than those limited to serving just Okaloosa
County. Based on conclusions drawn from public involvement input, regional service to adjacent
counties such as Walton County is a much-desired attribute for Okaloosa County routes.
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan 141
Section 8: Alternatives Evaluation
Productivity and Efficiency
Productivity is generally measured in terms of ridership. Service efficiency is used by transit agencies to
gauge how well they are using their existing resources. Each measure is critical to the success of the agency,
and services performing well in terms of their productivity and efficiency should receive a higher priority.
Forecast ridership, revenue hours, and operating cost figures for each individual alternative are used in this
measure.
Ridership Productivity – This is measured in terms of annual passenger trips per revenue hour of
service. To provide for an equal comparison between alternatives, passenger trips and revenue
hours of service were generated using output from TBEST 2026 ridership data.
Cost Efficiency – This is evaluated for each alternative using a standard transit industry efficiency
measure, operating cost per passenger trip. Operating costs used are calculated using operating
cost per trip based on Okaloosa County performance data and TBEST 2026 ridership data.
Figure 8-4 shows the Access EC Rider TDP 10-year transit service alternatives evaluation process. A
summary of various criteria and thresholds used in each tier and the evaluation results are presented in the
remainder of this section.
Figure 8-4: Transit Service Alternatives Evaluation Process
Alternatives
Evaluation
TDP Steering Committee Public Outreach
Public Input
Baseline
Conditions Potential Priority
Service Transit Markets Ranking of
Public/ Alternatives1 Potential
Stakeholder Traditional Alternatives1
Alt A
Input Discretionary Alt C
Alt B
Regional Alt D
Transit Alt C
Demand Alt D Alt A
Assessment Alt B
Productivity &
Efficiency
Ridership
Productivity 1 For illustration
Cost Efficiency purposes only. See
list of alternatives
summarized
previously.
Situation Appraisal
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan 142
Section 8: Alternatives Evaluation
Alternatives Scoring Thresholds
Each criterion is assigned a weight; weighting affords the opportunity to measure the relative importance
of each criterion among the group of criteria to be applied. For each transit alternative, a score was
determined either through the computation of the selected measure of effectiveness or through the expert
judgment of the analyst. Potential scores were assigned depending on the relative comparison of a given
transit alternative with other transit alternatives as it relates to a given criterion. A higher score is
consistent with a higher ranking for a given alternative for the criterion being evaluated.
The thresholds for computation-based criteria (traditional market, choice market, trips per hour, operating
cost per trip) were determined using the average of the entire data set and one standard deviation above
or below the average. Table 8-2 shows the thresholds and scoring for each criterion used in the alternatives
evaluation.
Table 8-2: Alternatives Evaluation – Scoring Thresholds
Criterion Range Score
None 1
Public Input – Moderate 3
Interest in Improvement High 5
Very High 7
Less than (Average – 1 STDEV) 1
Traditional Market
Between (Average – 1 STDEV) to Average 3
Potential (% Serving
More than Average to (Average + 1 STDEV) 5
Traditional Market)
More than (Average + 1 STDEV) 7
Less than (Average – 1 STDEV) 1
Discretionary Market
Between (Average – 1 STDEV) to Average 3
Potential (% Serving
More than Average to (Average + 1 STDEV) 5
Discretionary Market)
More than (Average + 1 STDEV) 7
No 0
Regional Market Connectivity
Yes 5
Less than (Average – 1 STDEV) 1
Between (Average – 1 STDEV) to Average 3
Trips per Hour
More than Average to (Average + 1 STDEV) 5
More than (Average + 1 STDEV) 7
More than (Average + 1 STDEV) 1
More than Average to (Average + 1 STDEV) 3
Operating Cost per Trip
Between (Average – 1 STDEV) to Average 5
Less than (Average – 1 STDEV) 7
Note: STDEV = statistical standard deviation.
ACCESS EC RIDER | Okaloosa County’s 10-Year Transit Development Plan 143
Section 8: Alternatives Evaluation
Alternatives Evaluation
Once the