BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: TRANSPORTATION
DEPARTMENT/PROGRAM: ROADS
PROGRAM DESCRIPTION: The Roads Division of the Public Works Department provides to the public;
road construction and maintenance, stormwater maintenance and repair, resurfacing and asphalt millings base
stabilization, open graded hot mix road paving, bridge construction, and other infrastructure maintenance and
repair services. The Road Division also provides both rescue and recovery operations during disasters and other
emergencies which impact road and stormwater infrastructure.
REVENUE: Road Division is funded within the County Transportation Trust Fund. Supporting revenue of the
County Transportation Trust Fund is fuel taxes, local government half-cent sales tax, charges for services,
interest, other miscellaneous revenue and transfers from other funds.
EXPENDITURES:
Expenditures Budget
FY12 FY13 FY14 FY15
Category Actual $ Actual $ Original $ Approved $
Personal Services 4,048,721 4,086,201 4,547,572 4,570,664
Operating Expenses 2,635,497 1,768,699 1,811,542 1,845,277
Capital Outlay 135,111 2,264 0 0
Reserves 0 0 0 0
Total 6,819,329 5,857,164 6,359,114 6,415,941
HISTORICAL STAFFING SUMMARY:
Category FY12 FY13 FY14 FY15
Full-time 94 95 95 94
Part-Time 0 0 0 0
Relief 0 0 0 0
Total 94 95 95 94
MAJOR ACCOMPLISHMENTS LAST YEAR:
MAJOR ACCOMPLISHMENTS LAST YEAR:
Maintained 671 miles of paved roads and 74 miles of cold mix base stabilized roads.
Graded 199 miles of dirt roads once per week.
Maintained 223 retention ponds.
Mowed 727 miles of right of way.
Completed 153 work orders from customer requests.
Placed 1,680 tons of milled asphalt on damaged dirt roads throughout the north and county.
o State Line Road & John B Cadenhead Road.
Accepted 1 new sub-divisions/roads into county maintenance program totaling 1.25 miles or roadway and 2
retention ponds.
Reviewed, issued, and inspected 400 right-of-way permits.
Converted Old River Road bridge at Deadfall Creek from timber to steel/concrete.
Converted Reeves Road bridge from timber/asphalt to steel/concrete
PROGRAM GOAL: The mission of the Okaloosa County Public Works Road Division is to provide
transportation and infrastructure services to residents and visitors of Okaloosa County. The goal is to
accomplish this mission through its four primary sections: North Road Maintenance, South Road Maintenance,
Asphalt, and Bridge Sections.
KEY OBJECTIVES:
Maintenance:
1. To maintain all roads on the county-maintained list to a clean, safe, and passable condition.
2. To maintain all bridges and culverts on the county-maintained list to a clean, safe, and passable condition.
3. Grade and maintain all dirt roads on the county-maintained list once per week.
4. Maintain and repair paved roads, road edges, and safe zones.
5. Mow roadsides twice per growing season.
6. Maintain pavement markings on county roads. Restripe roads every 5 years.
7. Conduct herbicide operations on roadsides throughout the county.
8. Staff and equip a litter control crew (Inmate Crews).
9. Respond to work requests from the public in a timely and efficient manner.
Projects:
1. Complete Districts 1–5 road resurfacing program.
2. Rehabilitate cold mix roads.
3. Complete the road striping program.
4. Install and maintain guardrails at critical points in the county.
5. Repair critically eroded and worn stormwater structures affecting our roads.
6. Place asphalt millings on critically eroded roads in the county.
7. Continue paving dirt roads as feasible in the county.
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY12/13 FY13/14 FY14/15
Number of FTEs 95 95 95
Input
Salaries & Operating Expenditures $6.173M $6.372M $6.372M
Capital Expenditures $3,200 $0 $0
Number of Work Orders Completed 478** 500** 380**
Output
Miles of Roads Resurfaced 19.8*** 20.1*** 20.0***
ROW Permits Issued 540 225 400
Convert 20% of all required signage to new retro-reflectivity
20% 20% 20%
standards.
Efficiency
Grade/maintain 201 miles of dirt roads at least once per week. 95% 95% 95%
13.2
Road Striping 24.7 Miles 25 Miles
Miles*****
Effectiveness
% of County Roads Paved/Base Stabilized 71.75**** 72.8**** 73.3****
*Bridge conversion funding has been shifted from Operating to Local Option Gas Tax funding.
**Stormwarer related workorders (~600) have been excluded from this figure this year.
***Includes roads addressed under pavement preservation program, not necessarily resurfaced.
****Numbers reflect corrected calculations based on currently available data.
*****Road Striping focusing primarily on School Zones, Cross Walks, and Stop Bars