READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — June 2, 2015 — Okaloosa County Work Program — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Okaloosa County Work Program — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Page 1 of 3
" Type Work
Length Item Phase 2016 2017 2018 2019 2020
-« Description =i v 1
SR 8 (I-10) @ CR 4 ANTIOCH ROAD
INTERCHANGE PA&E/Emo Study 200 4079183 PD&E 0 1,020 0 0 o0
SR 8 (I-10) AT CR 189 HOLT EXIT
LIGHTING Lighting 697 2227131 Construction 0 0 828 0 o
SR 8 (I-10) FROM EAST OF CR 189 TO
W OF YELLOW RIVER Resurfacing 5.208 4348371 Construction 0 7.378 0 0o o
SR 8 (I-10) FROM SANTA ROSA
COUNTY LINE TO EAST OF CR 189 Resurfacing
4.408 4327371
Construction 6,452 0 0 0 0
i
Phase 2016 2017 2018 2019 2020
. i ‘Description i . i TypeWork . ilength Mem '
CRESTVIEW SIDEWALK PROJECT Sidewalk .750 4300382 Construction 0 303 0 0 0
FT WALTON AREAWIDE
COMPUTERIZED TRAFFIC SIGNAL
SYSTEM Traffic Signal Update 2202394 Operations 300 300 0 0 0
OKALOOSA AREA WIDE TRAFFIC
SIGNAL SYSTEM OPERATIONS Traffic Control Devices/System 4097971 Operations 300 300 400 400 400
OKALOOSA COUNTY JPAS FOR
TRAFFIC SIGNALS ON-SYSTEM
ROADWAYS Traffic Signals 4367491 Operations 362 379 397 416 435
SR 10 (US 90) FROM SUMMERTIME
DRIVE TO WEST OF SR 4 Resurfacing 7.180 4269691 Construction 3,179 0 0 0 0
SR 10 (US 90) FROM W OF SHOAL )
RIVER BR TO WALTON COUNTY LINE Resurfacing 7.483 4325411 Construction 3,646 0 0 0 0
SR 10 (US 90) FROM 1/2 MILE W OF SR
85 TO THE SHOAL RIVER BRIDGE Resurfacing 3.987 4346751 Preliminary Engineering 53 0 0 0 0
SR 10 (US 90) FROM 1/2 MILE W OF SR
85 TO THE SHOAL RIVER BRIDGE Resurfacing 3.987 4346751 Construction 0 0 4,027 0 0
SR 145 PERRY STREET FROM SR 30
(US 98) TO SR 85 EGLIN PARKWAY Resurfacing 487 4325671 Construction 0 590 0 0 0
SR 189 BEAL PARKWAY @ SR 393
MARY ESTHER BLVD INTERSECTION Intersection Improvement .255 4282082 Right Of Way 566 329 0 0 0
SR 189 BEAL PARKWAY @ SR 393
MARY ESTHER BLVD INTERSECTION Intersection Improvement .255 4282082 Construction 0 1,070 0 0 0
SR 189 BEAL PKWY @ CARMEL
DR/CLIFFORD ST INTERSECTION Add Right Turn Lane(S) .095 4367171 Preliminary Engineering 235 0 0 0 0
SR 189 BEAL PKWY @ CARMEL
DR/CLIFFORD ST INTERSECTION Add Right Turn Lane(S) .095 4367171 Right Of Way 0 470 0 0 0
SR 189 BEAL PKWY @ CARMEL
DR/CLIFFORD ST INTERSECTION Add Right Turn Lane(S) .095 4367171 Construction 0 0o 21 0 0
SR 189 BEAL PKWY FROM MANNING
DRIVE TO SR 188 RACETRACK ROAD Resurfacing .970 4362581 Preliminary Engineering 529 0 0 0 0
SR 189 BEAL PKWY FROM MANNING
DRIVE TO SR 188 RACETRACK ROAD Resurfacing .970 4362581 Construction 0 0 1,561 0 0
SR 189 OVER FIVE MILE BAYOU
BRIDGE NOS. 570053 & 0941 Bridge Replacement 3312201622 Right Of Way 35 0 0 0 0
SR 20 FROM SR 293 NORTH BOUND
MID BAY CONNECTOR TO WALTON
COUNTY LINE Pd&E/Emo Study .2352201382 PD&E 0 0 56 0 0
SR 293 WHITE PT ROAD MID BAY
BRIDGE BRIDGE NO. 570091 Toll Plaza 3.649 4153656 Preliminary Engineering 93 93 93 93 93
SR 30 (US 98) @ CODY AVENUE
HURLBURT FIELD ENTRANCE
LANDSCAPING Landscaping 1.277 4150673 Construction 625 0 0 0 0
SR 30 (US 98) BROOKS BRIDGE NO.
570034 Pd&E/Emo Study .250 4154741 Repayments 300 0 0 0 0
SR 30 (US 98) FROM BROOKS STREET
TO EMERALD COAST CONVENTION
CENTER Sidewalk .608 4257782 Construction 200 0 0 0 0
SR 30 (US 98) FROM CR 30F AIRPORT
ROAD TO WALTON COUNTY LINE Add Lanes & Reconstruct 4.145 4141323 Right Of Way 1,000 0 0 0 0
SR 30 (US 98) FROM CR 30F AIRPORT
ROAD TO WALTON COUNTY LINE Add Lanes & Reconstruct 41454141323 Construction 0 32,778 0 0 0
SR 30 (US 98) FROM SANTA ROSA C.O.
LINE TO SR 393 MARY ESTHER BLVD Pd&E/Emo Study 8.586 2201962 PD&E 1,212 0 0 0 0
SR 30 (US 98) FROM SANTA ROSA CO.
LINE TO SR 189 BEAL PKWY Add Turn Lane(S) 11.150 4282083 Construction 0 1,335 0 0 0
QR 2N /11R AR\ HARRNR RNI I F\/ARN
52712015
Page 2 of 3
AIRPORT ROAD Resurfacing 2.872 2202362 Preliminary Engineering 820 0 0 0 0
SR 30 (US 98) HARBOR BOULEVARD
FROM EAST PASS BRIDGE TO
AIRPORT ROAD Resurfacing 2.872 2202362 Construction 0 0 3,507 0 0
SR 30 (US 98) OVER EAST PASS
BRIDGE NO. 570054 Bridge-Repair/Rehabilitation .613 4176834 Construction 0 674 0 0 0
SR 397 EGLIN BOULEVARD FROM SR
85 EGLIN PARKWAY TO EGLIN AFB
GATE Resurfacing .840 4325511 Preliminary Engineering 247 0 0 0 0
SR 397 EGLIN BOULEVARD FROM SR
85 EGLIN PARKWAY TO EGLIN AFB
GATE Resurfacing .840 4325511 Construction 0 0 938 0 0
SR 397 JOHN SIMS PARKWAY OVER
TOMS BAYOU BRIDGE NO. 570055 Bridge Replacement .129 4061943 Right Of Way 0 279 0 0 0
SR 397 JOHN SIMS PARKWAY OVER
TOMS BAYOU BRIDGE NO. 570055 Bridge Replacement .129 4061943 Construction 0 0 10,600 0 0
SR 4 BLACKWATER RIVER BRIDGE NO.
570033 Bridge Replacement .146 4328281 Right Of Way 0 0 266 0 0
SR 4 BLACKWATER RIVER BRIDGE NO.
570033 Bridge Replacement .146 4328281 Railroad & Utilities 0 0 0 9 0
SR 4 BLACKWATER RIVER BRIDGE NO.
570033 Bridge Replacement .146 4328281 Construction 0 0 0 13,485 0
SR 4 BLACKWATER RIVER BRIDGE NO.
570033 Bridge Replacement .146 4328281 Environmental 0 0 117 0 0
SR 4 FROM SANTA ROSA COUNTY
LINE TO 16TH STREET Resurfacing 8.176 4362651 Preliminary Engineering 758 0 0 0 0
SR 4 FROM SANTA ROSA COUNTY
LINE TO 16TH STREET Resurfacing 8.176 4362651 Construction 0 0 3,942 0 0
SR 85 EGLIN PKWY FROM SR 30 (US
98) TO HUGHES ST LANDSCAPING Landscaping 1.329 2202313 Construction 100 0 0 0 0
SR 85 FROM BRANDT POND ROAD TO
SOUTH OF SR 123 Resurfacing 1.755 4269321 Construction 2,747 0 0 0 0
SR 85 GOVERNMENT ST FROM N OF
SR 190 TO S SR 397 JOHN SIMS
PARKWAY Resurfacing .545 4287411 Construction 622 0 0 0 0
TOLL OPERATIONS MID-BAY BRIDGE Toll Plaza 3.684 0001561 Operations 3,491 3,585 3,684 3,701 3,701
Phase 2016 2017 2018 2019 2020
Description _ TypeWork Length Item
PJ ADAMS PARKWAY FROM ASHLEY
DRIVE TO KEY LIME PLACE Add Lanes & Reconstruct .349 4219977 Construction 0 2,824 0 0 0
PJ ADAMS PARKWAY FROM ASHLEY
DRIVE TO KEY LIME PLACE Add Lanes & Reconstruct .349 4219977 Environmental 77 0 0 0 0
PJ ADAMS PARKWAY FROM KEY LIME
PLACE TO SR 85 S FERDON BLVD Add Lanes & Reconstruct .508 4219973 Construction 2,900 0 0 0 0
PJ ADAMS PARKWAY FROM WILD
HORSE DRIVE TO ASHLEY DRIVE Right Of Way - Future Capacity .305 4219978 Right Of Way 0 1,500 0 0 0
PJ ADAMS PARKWAY FROM
WILDHORSE DRIVE TO SR 8 (I-10) nght Of Way Future Capacity 1. 282 4219979 Right Of Way 0 0 3,400 0 0
Hi ff State Hwy E : :
S Descnptlon SH ,Type Work Length Item Phase 2016 2017 2018 2019 2020
RED BARROW ROAD OVER PANTHER
CREEK BRIDGE NO. 574043 Bridge Replacement .013 4358011 Preliminary Engineering 748 0 0 0 0
RED BARROW ROAD OVER PANTHER
CREEK BRIDGE NO. 574043 Bridge Replacement .013 4358011 Right Of Way 0 0 5 0 0
RED BARROW ROAD OVER PANTHER
CREEK BRIDGE NO. 574043 Bridge Replacement .013 4358011 Construction 0 0 0 0 792
STEEL ROAD OVER PENNY CREEK
BRIDGE NO. 574013 Bridge Replacement .028 4339101 Right Of Way 0 27 0 0 0
STEEL ROAD OVER PENNY CREEK
Construction 0 0 0 2,899 0
BRIDGE NO. 574013 Bridge Replacement 028 4339101
Descrip! ; : Length ltefm_’;"ji', Phase 2016 2017
' OKALOOSA-WALTON FY 17-18 UPWP Transportatlon Plannlng 4317411 Planning 0 430 430 0 0
OKALOOSA-WALTON TPO FY 15-16
UPWP Transportation Planning 4279291 Planning 430 0 0 0 0
OKALOOSA-WALTON TPO FY 18-19 Transportation Planning 4348771 Planning 0 0 0 430 430
SR 189 BEAL PKWY FROM SR 30 (US
98) TO SR 393 MARY ESTHER CUTOFF Transportatlon Plannmg 4279292 Planning
ASSET MANAGEMENT OKALOOSA
5/27/2015
Page 3 of 3
MID-BAY BRIDGE TOLL FACILITIES
MAINTENANCE Toll Plaza _ g/Rdwy/Contract Maint 88 89 89 89
Phase 2016 2017 2018 2019 2020
foin Description:® o
BOB SIKES AIRPORT CONSTRUCT
ACCESS ROADWAY Aviation Preservation Project 4256172 Capital 1,398 1,333 1,275 0 0
BOB SIKES AIRPORT DESIGN & CONST
4256185 Capital
Description Sk Length Item :Phase .. 2017 2018 2019 2020
BOB SIKES AIRPORT CONSTRUCT
ACCESS ROADWAY Aviation Preservation Project 4256172 Capital 0 519 164 0 0
BOB SIKES AIRPORT CONSTRUCT
EASTSIDE AIRCRAFT PARKING APRON Aviation Capacity Project 4256162 Capital 0 0 0 0 6,000
BOB SIKES AIRPORT DESIGN & CONST
INTERMODAL ACCESS CONNECTOR Aviation Preservation Project 4256185 Capital 0 0 0 820 0
BOB SIKES AIRPORT OVERLAY
AIRCRAFT PARKING APRON Aviation Preservation Project 4256163 Capital 0 0 0 0 5,000
BOB SIKES AIRPORT REPLACE
EASTSIDE SECURITY FENCING Aviation Preservation Project 4256186 Capital 0 0 0 800 0
BOB SIKES AIRPORT REPLACE HIGH
MAST LIGHTING Aviation Preservation Project 4256184 Capital 450 0 0 0 0
BOB SIKES AIRPORT TREE REMOVAL Aviation Safety Project 4256164 Capital 0 0 0 0 300
DESTIN-FT WALTON BCH AIRPORT
CONSTRUCT MAINT BUILDING Aviation Revenue/Operational 4256152 Capital 500 0 0 0 0
DESTIN-FT WALTON BCH AIRPORT
REHAB APRON Aviation Preservation Project 4256153 Capital 0 1,552 0 0 0
DESTIN-FT WALTON BCH AIRPORT '
REPLACE E SECURITY FENCE Aviation Preservation Project 4239063 Capital 0 0 0 750 0
DESTIN-FT WALTON BEACH AIRPORT
EXPAND/RECONSTRUCT PARKING
APRON Aviation Capacity Project 4256155 Capital 0 0 0 0 3,000
DESTIN-FT WALTON BEACH AIRPORT
REPAINT/RESTRIPE Aviation Preservation Project 4256154 Capital 0 0 0 0 625
N/W FLORIDA REGIONAL AIRPORT
CONST TERMINAL GATE EXPANSION Aviation Capacity Project 4256144 Capital 0 0 0 1,290 0
N/W FLORIDA REGIONAL AIRPORT
REHAB EMPLOYEE PARKING Aviation Revenue/Operational 4181933 Capital 1,900 0 0 0 0
N/W FLORIDA REGIONAL AIRPORT
WESTSIDE DEVELOPMENT
sa County
Aviation Safety Project
4239074
on: Transit
Capital 0 0 3,000 0 0
* Phase 2016
a8 Description .. TypeWork Length Item 12017 2018 2019 2020
OKALOOSA COUNTY CAPITAL-
OPERATING 5310 Capital For Fixed Route 4336841 Capital 1,000 1,000 1,000 1,150 1,000
OKALOOSA COUNTY COMMUTER
ASSISTANCE Commuter Trans. Assistance 4203152 Operations 20 20 20 20 20
OKALOOSA COUNTY CORRIDOR
OKALOOSA TRANSIT Urban Corridor Improvements 4222561 Operations 210 210 212 226 233
OKALOOSA COUNTY SECTION 5307
CAPITAL Capital For Fixed Route 4222552 Capital 2,011 891 1,244 0988 2,506
OKALOOSA COUNTY SECTION 5307
OPERATING Operating For Fixed Route 4222553 Operations 2,850 2,950 2,650 3,000 3,000
OKALOOSA COUNTY SECTION 5339 Capital For Fixed Route 4156176 Capital 1,250 0 0 0 0
OKALOOSA COUNTY SECTION 5339 Capital For Fixed Route 4156177 Capital 0 1,250 0 0 0
OKALOOSA COUNTY SECTION 5339 Capital For Fixed Route 4156178 Capital 0 0 1,250 0 0
OKALOOSA COUNTY SECTION 5339 Capital For Fixed Route 4156179 Capital 0 0 0 1,250 1,250
OKALOOSA COUNTY TRANSIT NON-
URBANIZED AREA 5311 Operating/Admin. Assistance 4213652 Operations 500 0 0 0 0
OKALOOSA COUNTY TRANSIT
OPERATING ASSISTANCE Operating For Fixed Route 4222531 Operations 896 926 919 949 997
OKALOOSA-WALTON TPO PLANNING
SECTION 5303 GRANT Modal Systems Planning 4217182 Planning 65 0 0 0 0
5/27/2015
