About this source
Action Item Printout from the Okaloosa County BOCC meeting of March 4, 2014 (IQM2 meeting #1192). Original portal label: Action Item Printout. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- Action Item Printout
- Date
- March 4, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
Action Item Printout (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 345.5 KB
Download ↓Machine-extracted text — 81-Action Item Printout.pdf
Text extracted on 2026-10-31 from 81-Action Item Printout.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 3.4 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: March 4, 2014
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Final Payment - Main Island Pump Station Temporary Shoring
DEPARTMENT: Water and Sewer
BCC DISTRICT: District 5
STATEMENT OF ISSUE: Staff requests BCC approval of the Final Contract Payment Request
for the completion of the Temporary Shoring Contract # C12-1979-WS, with Construction
Services Company of Florida, Inc. for the Main Island Pump Station Project.
Background: At their regular scheduled meeting on August 7, 2012, the BCC awarded Contract
# C12-1979-WS to the Construction Services Company of Florida for temporary shoring,
dewatering and excavation services associated with the Main Island Pump Station Replacement
Project. OCWS self-performed the rest of the work on the project, including installation of a new
30 feet deep wet well and associated pumps, piping, and controls. The new lift station replaced
the 35 year old aging and undersized dry well/wet well pump station and serves the entire
Okaloosa Island Service Area.
The Notice to Proceed was issued on September 24, 2012, and all work was completed prior to
the established contract final completion date of December 23, 2012. Processing of final
payment was delayed due to a claim by Construction Services’ dewatering subcontractor (F&W
Construction Company/ Burns Dewatering) for damage that occurred to onsite equipment during
the dewatering process. The claim was recently resolved and a notarized Release of Lien was
obtained for the project. All required contract close-out documents have been fully executed and
submitted with the final payment request. Approval of final payment has been provided from
Constantine Engineering, Engineer-of-Record for the Project. The Final Invoice is attached for
your review, along with the Contract Closeout Checklist and other supporting documentation.
There are 2 additional issues with this final payment that staff needs to disclose. First, the
warranty period is supposed to be 12 months following the final payment, per the Contract
Close-Out Checklist. It has actually been approximately 14 months since the contract work was
completed. The work was completed on time (by 12/23/2012) and with great success. Because
of extenuating circumstances (osprey made a nest in their crane, which couldn't be moved from
the site; and a claim that has now been settled), we are requesting that the final payment be made
without extending the warranty another 12 months. Second, the performance and payment bond
was originally made out for $156,700, when it should have been for $206,700. This error
occurred almost 2 years ago in part because the total contract amount ($206,700) is above the
base bid ($156,700). Staff is also requesting the final payment be made without re-issuing a
bond. We feel that a bond is not needed at this point because the contract work was completed
approximately 14 months ago with no problems. Staff has consulted the County Attorney on
these two issues, and he concurs with the above solution.
OPTIONS: Approve or deny.
RECOMMENDATIONS: Staff recommends BCC approval of Final Contract Payment Request
as attached to Construction Services Company of Florida, Inc. in the amount of $19,835.00 for
Contract # C12-1979-WS.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Related sources
This action item printout is part of the Okaloosa County BOCC meeting of March 4, 2014.