READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — January 8, 2013 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 132-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: February 19, 2013 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Constantine Task Order 58 Revision 1 DEPARTMENT: Water and Sewer BCC DISTRICT: Five STATEMENT OF ISSUE: This revision to the original scope of services for this task order includes additional professional engineering and technical services required to design, permit, and manage the construction of a 5,400 linear feet of 10” force main to convey wastewater from the Lancaster Estates area to the new Meigs-Seminole Sewer Pump Station. This new force main is required to reroute the flows that currently discharge to the Rocky Bayou Sewer Pump Station. In addition, the scope of work was increased to modify the design of the Meigs- Seminole Sewer Pump Station, to evaluate a location for a proposed repumping station and cost for additional bid services associated with multiple sets of bid documents. This revision to the original Scope of Work for this task order has been developed and negotiated with Constantine Engineering per the terms of our Master Services Agreement to perform these services, and requires approval by the Board of County Commissioners. Revision 1 to Task Order 58 is attached for your review. BACKGROUND: OCWS authorized Constantine Engineering to evaluate the major wastewater conveyance system serving the East County Service Area, including the White Point Road, Meigs-Seminole, Rocky Bayou and Post Office Sewer Pump Stations (SPSs); and the primary force main running from the Bluewater Bay Area to the NV Regional WWTF. In May of 2008, Constantine Engineering provided OCWS staff with a technical memorandum (TM), “Bluewater Bay Wastewater Collection and Transmission System Evaluation”. This TM included an evaluation of each of the facilities and provided recommendations for repairs, upgrades and improvements necessary to extend and expand the capacity of the system. The evaluation considered current and future capacity needs, as well as potential capital costs and life cycle costs associated with the recommended improvements. In this evaluation, the upgrade and replacement of the force main that conveys wastewater from the Meigs-Seminole SPS to the Rocky Bayou SPS to the Post Office SPS was identified as a priority for potential cost savings and meeting regulatory design requirements. Based on the recommendations, OCWS negotiated with Constantine Engineering to design approximately 22,000 linear feet of new 16” force main and upgrade the Meigs-Seminole and Rocky Bayou LS to allow OCWS to pump all of the flows received from the Bluewater Bay Service directly to the NV Regional WWTF and permanently removing the Post Office LS from operation. The design also included additional flow capacity and redirecting all of the flow away from the highly congested section of Hwy 20. In January of 2012, Constantine Engineering was issued Task Order 58 to upgrade the Meigs- Seminole SPS and upgrade the last remaining undersized portion of the force main, approximately 1,000 linear feet. During the evaluation phase of the design, Constantine determined that all flows received from the Bluewater Bay Service Area could be pumped directly to the NV Regional WWTF and completely by-pass the Rocky Bayou SPS, providing an additional O&M cost savings. However, it was determined that wastewater received from the Lancaster Estates area is also currently pumped to the Rocky Bayou SPS and would need to be rerouted or upgrades would need to be made to the three existing pump stations and force mains. It was determined that the most cost effective method would be to reroute the Lancaster flows directly back to the Meigs-Seminole SPS. OCWS identified two potential routes, SR 20 in FDOT right-of-way or through an easement from the US Department of Agriculture (Rocky Bayou State Park). The SR 20 route was recently selected after the State Park easement was not obtainable. The original scope of service under this task order did not include engineering services to design the force main to reroute flows from the Lancaster Estates area to the Meigs-Seminole SPS. The attached revision to Scope of Services from Constantine Engineering includes the necessary work tasks to complete the design, permitting and additional services during construction and resident observation services for a new 5,400 linear feet of force main and associated connection requirements. The Scope of Work is also being modified to increase the number of bid documents from one to four. In constructing large sewer pump stations, we have realized a cost savings by bidding out the major components of the pump station equipment separately; 1) pumps/wet well, 2) motor control center & control panel, 3) generator, and 4) electrical building. The revised Scope of Work includes the bid phase services on these four bids, and also includes the evaluation of a location for the East County Repump Station, which will serve as a "booster station" in between the Meigs-Seminole SPS and the Eglin Main Base SPS. The attached East County Master Sewer Plan depicts the location of this proposed Hwy 20 force main, which is shown as Phase 8. Note that engineering services for Phases 6 and 7 on this plan are in the original Task Order 58. This Revision 1 to Task Order 58 negotiated with Constantine Engineering increased the Not to Exceed budget ceiling from $86,000.00 to $125,200.00. OCWS has budgeted $1.7M in FY2013 and FY2014 combined for Phases 6-8. These three phases are funded with the $15M 2012 bank loan. OPTIONS: Approve or deny. RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute Revision 1 to Task Order 58, adding $39,200 in scope of work, for a total not to exceed fee of $125,200.00 with Constantine Engineering. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓