Preserved among the July 19, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1342). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used June 20, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.
Original publication
LGFR application
Date
July 19, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
10
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)
Source date and document identity checked for this intake. Machine text has not received independent human proofreading.
HOW FAR THIS HAS BEEN CHECKED
File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.
Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.
LGFR application — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
FY 2017/18 Local Government Funding Request
Okaloosa County Inlet Management Project
Project Name: East Pass Sediment Impoundment Basin – Design and Permitting
Project Description: The project will develop and apply numerous numerical (MIKE) models
to evaluate various sediment impoundment basin design alternatives in East Pass to facilitate
bypassing of sediment to the adjacent beaches. The project scope includes the alternatives
evaluation and the design and permitting (including state and federal permits) of the recommended
basin alternative. The project will comply with the Department’s East Pass Inlet Management
Implementation Plan (IMIP), specifically the final strategy to investigate availability and feasibility
of supplemental inlet sediment excavation outside the federal navigation channels to help mitigate
gulf beach erosion that exceeds the bypassing quantities obtained from maintenance of the federal
navigation channels
County: Okaloosa
Range Monuments: NA (Immediately west of R-17)
Location:
East Pass is located adjacent to Destin, FL, approximately 45 miles east of Pensacola and
approximately 50 miles northwest of Panama City. Separating Santa Rosa Island to the west and
Moreno Point to the east, East Pass is a structured inlet that provides direct tidal link between the
Gulf of Mexico and Choctawhatchee Bay.
Project History:
The East Pass Federal navigation channel requires frequent maintenance dredging to alleviate
shoaling of sediment within the channel. The East Pass Maintenance Dredging is authorized by
joint coastal permit number 0288799-001-JC, issued to the U.S. Army Corps of Engineers
(USACE) October 2009 and expires October 2019. East Pass navigation channel (maintenance)
dredging is also authorized by 0288799-003-JC, which was recently issued to the City of Destin in
February 2015 and expires in February 2030. Both permits authorize maintenance dredging within
the federal navigation channels that extend from approximately 3,500 ft south of the inlet jetties
northward past the US98 Bridge into Choctawhatchee Bay. The permits also authorize maintenance
dredging within the Destin Harbor (Old Pass Lagoon) entrance channel.
The updated and adopted inlet management plan (2010) reports that the USACE has dredged
2,352,600 cy of material from east pass since 1986. The frequency of dredging ranges between one
and three years, with a historic, average annual dredge rate of approximately 98,000 cy/year.
Notably, federal and budget constraints have since eliminated Operations and Maintenance
dredging operations of non-deepwater ports, removing East Pass and Destin Harbor from the
USACE project list.
Following Implementation Strategy #4 of the East Pass Inlet Management Implementation Plan
(2013), current project aspirations are to design and permit sediment impoundment basins (“sand
traps”) to reduce the maintenance dredging frequency of the East Pass federal navigation channels
and increase the volume of beach-quality sand available to the Gulf coast beaches. From the
Implementation Plan: “Implementation Strategy #4 initiates greater flexibility in the future
management of East Pass. Continued Congressional appropriations for the maintenance of the
federal navigation project are not guaranteed. Also, a planned channel maintenance dredging
project might not even provide a sufficient quantity of sand to balance the sediment budget with
adjacent eroding beaches. Additional inlet excavation outside the authorized channels may be
warranted. A problem inherent with the existing natural channel alignment is the eastward
migration of the channel against the east jetty spur. Between the channel and the west jetty is a
developing shoal. The reduced depth and cross-sectional flow area of this shoal within the inlet
inhibits tidal flow resulting in an increased flow within the channel. This increased flow has caused
scour to depths
Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.
Citation & reuse
Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — July 19, 2016 — LGFR application.” July 19, 2016. LGFR application. Crypt of Echoes evidence ID LED-2026-544e9f58fd294f38a6e76d99271645bd. http://127.0.0.1:58097/evidence/LED-2026-544e9f58fd294f38a6e76d99271645bd. Accessed [date].
Catalogue citation: Okaloosa County Board of County Commissioners, LGFR application, meeting materials for July 19, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=11815&MeetingID=1342
Preserved county public-record source. Third-party attachments may retain their original rights.