November 15, 2016

Okaloosa County BOCC — November 15, 2016 — Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request

Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request in the November 15, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the November 15, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1365). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used November 29, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
November 15, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
3
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 4.1 KB · 3

Download ↓

Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 161.9 KB · 3

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: November 15, 2016 TO: Honorable Chairman and Members of the Board FROM: Tracy Stage SUBJECT: Change Order No. 2 for Destin Air Traffic Control Tower Project DEPARTMENT: Airport BCC DISTRICT: 5 STATEMENT OF ISSUE: The Airports Department requests the Board of County Commissioners approve Change Order No. 2 with Environmental Management Resources of Washington, Inc. (EMR, Inc.) to re-allocate funds and to extend the construction time by 14 days on Contract No. C16-2335-AP in order to complete the Destin Executive Airport (DTS) Air Traffic Control Tower (ATCT) Project. BACKGROUND: The construction contract for the ATCT Project at DTS was issued on October 6, 2015 to EMR and the Notice-to-Proceed was issued on November 9, 2015. The project includes the construction, equipping, roadway, and utilities of the DTS ATCT. Change Order No. 1 was approved by the Board on October 4, 2016. Change Order No. 1 increased the amount of time needed to complete the project by 47 days due to multiple months that exceeded the normal amounts of rainfall giving the contract a scheduled substantial completion date of October 24, 2016. The project is funded by Federal Aviation Administration (FAA), Florida Department of Transportation (FDOT), Local Match (County), and approved Passenger Facility Charges (PFC). See funding breakdown below. FAA $2,000,000.00 FDOT $1,736,682.00 Local Match $597,356.00 Approved PFC $1,250.000.00 Total Funding $5,584,038.00 Attached as supporting documentation to this Agenda Request:  Change Order No. 2 incorporates revisions to the contract documents for modifications or additional requirements discovered during construction and has been approved by Airports Director, Tracy Stage; Project Engineer, Brad Wente; and EMR, Inc.’s President, James Foster. The Change Order was also approved by FDOT District 3 Program Manager, Philip Deal and FAA Program Manager, Chastity Clark.  Attachment 1-Bid Schedule A showing a Net add/deduct from contract equaling a contract value of $0.00.  Due to Hurricane Matthew, the Contractor has requested a contract extension. Pursuant to General Conditions Article 12.3, abnormal weather conditions were encountered during construction. Multiple Vendor’s operations were impacted by Hurricane Matthew causing delays in their operations and deliveries; therefore, causing delays in EMR’s operations on the project site. Change Order No. 2 will increase the amount of time needed to complete the project by 14 days. This Change Order will give the contract a new substantial completion date of November 7, 2016. Attachment 2-Time Extension Request Documentation  Change Order No. 2 incorporates additional requirements discovered during construction that will be included in Contract Line Item No. 01210-3, Utility Allowance. Pursuant to General Conditions Article 11.6, the below attachment’s overhead and profit have been determined. The Attachments and supporting documentation are included within the attached Change Order No. 2. Attachment 3-RFP-001: PBX & DAP Card Support Data (Pay Item 01210-3 Adjustment) Attachment 4-CO-06 CFMF (Pay Item 01210-3 Adjustment) Attachment 5-CO-03: De-Ionizer (Pay Item 01210-3 Adjustment) Attachment 6-CO-07: Canopy Color (Pay Item 01210-3 Adjustment) Attachment 7-CO-08: Airfield Lighting Attachment 8-RFP-002: Fiber Optic Network Extension  The County internal coordination by the Purchasing Department and Legal Department. OPTIONS: Approve, Reject, or Table. RECOMMENDATIONS: It is Staff’s recommendation that the Board approve Change Order No. 2 with Environmental Mana

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — November 15, 2016 — Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request.” November 15, 2016. Action Item Printout. Crypt of Echoes evidence ID LED-2026-5425502734494aaf853a5640191f04e1. http://127.0.0.1:58097/evidence/LED-2026-5425502734494aaf853a5640191f04e1. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Change Order No. 2 for Destin Air Traffic Control Tower Project — agenda request, meeting materials for November 15, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=22562&MeetingID=1365

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓