READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 9, 2013 (meeting #1123) — reading text

Part 16 of 25. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Attachment: Budget Policy Document FY14 (1578 : Budget Policy Document) Holt Park – $200,000 (Unincorporated) • Laurel Hill Rails to Trails (Old railroad right-of-way) - $10,000 - upgrade railroad bed for walking trail, benches, trail head parking and port-o-let (Unincorporated) The Florida Boating Improvement Program (FBIP) continues to be a source of funding to provide water recreation facilities. This revenue funds replacement of “No Wake Zone” signs and pilings, repair and maintenance of boat ramps, and support facilities. In addition, it provides funding for the Derelict Vessel Removal Program. FBIP can also provide allocations up to $15,000 for local municipalities within Okaloosa County for various approved projects. Solid Waste Program Public Works’ challenge in Fiscal Year 2014 will be to continue monitoring two solid waste contracts, increase recycling participation, and work toward the goal of reducing long-term care and maintenance costs for the three closed landfills, which totals approximately $875,000 annually. In Fiscal Year 2013, Public Works moved forward with a plan to expand its control over the municipal solid waste stream in unincorporated Okaloosa County by conducting a public hearing giving notice of its intent to franchise commercial garbage collection in the year 2016. This would provide Okaloosa County control of approximately 50 percent of the waste stream, thereby positioning the County to competitively bid all solid waste services to begin upon termination of the existing contracts on March 31, 2016. This bid will include enhanced recycling, commonly called “1-1-1”, for all residents within the County’s five franchise areas. The ultimate goal is to increase recyclable collections from the residential and commercial waste stream in an effort to comply with the State mandated recycling goal of 75 percent by 2020. Additionally in Fiscal Year 2014, the County will explore opportunities to encourage recycling within the school district and the construction and demolition debris disposal industry. Yard trash operations will continue to be managed in-house with the addition of contract grinding at the Wright Yard Trash Facility versus the replacement ($850,000) of an existing grinder that is in the county inventory. Solid waste and recycling budgets will be combined into one budget to reduce the administrative duplication of managing two divisions instead of one. Staff will continue to explore ways to expand household hazardous waste services for local residents in order to make the service more convenient for residents to dispose of household chemicals. This may necessitate the creation of two technician positions to operate these services on a full time basis in Fiscal Year 2015. Fiscal Year 2013 was a transitional period for the active remediation systems at Baker Landfill (BLF) and Wright Landfill (WLF). BLF and WLF infrastructure changes made to comply with remedial systems modifications began in Fiscal Year 2012 and will be completed in Fiscal Year 2013. Cost reductions from these infrastructure changes will be realized in the Fiscal Year 2014 budget. A slight increase in operation and Page 28 Packet Pg. 35 1.b maintenance costs associated with the remediation systems infrastructure changes is projected in order to achieve cleanup and operational goals. A reduction in reporting requirements will further reduce the cost of Long-Term-Care at BLF and WLF. Private property access continues to be an issue at BLF. The County has groundwater monitoring infrastructure on four privately owned parcels. Of the four, only one is covered by an access agreement. Two of the remaining three changed owners in 2012-2013 and the County is actively pursuing access agreements. The remaining parcel owner is currently in active negotiations with the County for long-term access. If access to property agreements cannot be secured in Fiscal Year 2013, the County may be forced to abandon six monitoring wells located on private property and reinstall the wells in a County easement. Attachment: Budget Policy Document FY14 (1578 : Budget Policy Document) Real estate agreements for Niceville Landfill (NLF) and WLF on United States Air Force (USAF) property are projected to be in place by the end of Fiscal Year 2013. Individual agreements have been approved by the Board and are awaiting signatures from the USAF. No additional costs will be incurred by the County in the new agreements. In lieu of property use fees, landscaping and yard debris generated in the USAF cantonment area at Eglin are processed and repurposed by the County at no cost to the USAF. The field activities associated with the NLF remediation pilot study will be complete in Fiscal Year 2013. All costs associated with field operations have been captured in the Fiscal Year 2013 budget. However, reporting activities and costs could extend into the next fiscal year. County staff was successful in securing a passive remediation strategy at NLF and the active pilot study remediation system will subsequently be decommissioned at the end of the test. The passive remediation strategy is Monitored Natural Attenuation (MNA). MNA has no active environmental cleanup infrastructure. Cleanup goals are achieved by allowing natural environmental processes to reduce the concentration of contaminants. The County will continue to assess the existing monitoring well network to validate the reduction in chemical concentrations. Three additional monitoring wells have been budgeted to be installed in Fiscal Year 2013. However, the installation of the wells is dependent on an in-place real estate agreement. If the USAF does not execute the real estate agreement by September 2013, the cost of the well installations will be reflected in the Fiscal Year 2014 budget. Transportation Okaloosa County maintains 201 miles of dirt roads, 74 miles of cold mix base stabilized roads, 666 miles of paved roads, and 73 bridges and large box culverts. The County accepted approximately 2 miles of paved roads into the maintenance system in Fiscal Year 2013. The current revenue allocated for capital transportation projects, including resurfacing and dirt to pave programs, is acquired through the Constitutional Gas Tax (CGT) and the Local Option Gas Tax (LOGT). Average revenue from these sources in previous years totaled approximately $3,500,000 per year. The annual projection for resurfacing has been restructured to reflect pavement preservation and pavement management techniques. These diverse methods stretch the County’s funding dollars to allow the maximum benefit per dollar expended. Current funding is $500,000 per year, of which $20,000 per district is available for other transportation-related expenses to the five districts. The remaining $400,000 allows staff to implement pavement preservation techniques on roadways throughout the unincorporated areas of the County. For Fiscal Year 2014, Public Works is planning to resurface over 4 miles of asphalt roads (under a pavement management/pavement preservation strategy); provide further stabilization and or surface preservation treatments to existing cold mix stabilized roads, continue the road striping program (under a pavement marking management structure); and continue with the dirt-to-pave hot mix asphalt program. Page 29 Packet Pg. 36 1.b Existing dirt roads being considered for dirt-to-pave hot mix asphalt paving include Davis Road in Laurel Hill, Hare Street and Taylor Road in Crestview, and Riley Barnhill Road in Baker. Aging cold mix stabilized roads that are planned for further preservation and stabilization include Robin Road, Batten Road, Bear Head Road, Bluebird Lane, and Perry Smith Road. The remaining dirt portion of Fairchild Road in Crestview is currently under design as a dirt-to-pave project with construction scheduled to begin in Fiscal Year 2014. Martin Luther King, Jr. and Green Acres Boulevards are being designed for mill and resurface with full depth reclamation along with various drainage improvements. Mount Olive Road is also being considered for a mill and resurfacing project. Completion of these projects depends upon gas taxes and will be completed based upon revenue availability. Attachment: Budget Policy Document FY14 (1578 : Budget Policy Document) For Fiscal Year 2014, the Bridge Section will budget to convert two short length wood bridges (Trawick Creek at Wilkerson Bluff Road and Turkey Hen Creek at Antioch Road tentatively) to concrete spans. Material costs to reconstruct both bridges will be budgeted for a total of $200,000 to continue the 20-year program to convert all wooden bridges to concrete. During Fiscal Year 2013, Public Works was able to accomplish several much needed roadway improvement projects. Projects completed during the year include the full depth reconstruction of Antioch Road (from Brodie Lane to Wilks Drive) and the paving of the remaining dirt portion of Keyser Mill Road (from Skeeter Lane to Galiver Cutoff). Clear Creek Road and West Plympton Road are dirt-to-pave projects that were also completed. From a planning and design perspective, Okaloosa County continues to develop improvement plans for both Okaloosa Lane and P.J. Adams Parkway. The Federal Highway Administration has received the final review package from the County, as approved by the Florida Department of Transportation (FDOT), for the Project Development & Environment (PD&E) Study of P.J. Adams Parkway/Antioch Road from SR 85 to US 90. Once approved, it is hoped that this study will lead the way for future design improvements and funding alternatives. As construction is being performed along Martin Luther King Jr. Boulevard and Fairchild Road, efforts to acquire the necessary right of way and finalize the design drawings for improvements to the unpaved portion of Okaloosa Lane and the adjacent Holley Drive are being performed. As soon as right of way is acquired, paving the final section of Okaloosa Lane will commence. Though these projects are not controlled by Okaloosa County, Public Works staff is heavily involved with the design and construction of the interchange between Cody Avenue and US 98 at the Hurlburt Field main gate. Recently, the Governor’s office announced that funding for the widening of SR 123 has been approved and staff will continue to participate in the development of that project. It is also anticipated that FDOT will provide funding through Local Agency Program (LAP) agreements for safety improvements to Airport Road in the Crestview area and Sidewalks along 12th Street in the Shalimar area. Along with periodic “push-button” projects, it is estimated that approximately $70 million in construction projects will be active in Okaloosa County through FDOT activities during Fiscal Year 2014. Stormwater The Stormwater staff is tasked with addressing all stormwater construction, failures, maintenance, regulatory compliance, and development of a future funding needs list. The Board made a commitment to pledge $400,000 for Fiscal Year 2013 to address stormwater needs.

Download this text file with its original spacing ↓