October 4, 2016

Okaloosa County BOCC — October 4, 2016 — Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request

Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request in the October 4, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the October 4, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1362). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used Sept 6, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
October 4, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.6 KB · 2

Download ↓

Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 154.9 KB · 2

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: October 4, 2016 TO: Honorable Chairman and Members of the Board FROM: Tracy Stage SUBJECT: Change Order No. 1 for Destin Air Traffic Control Tower Project DEPARTMENT: Airport BCC DISTRICT: 5 STATEMENT OF ISSUE: The Airports Department requests the Board of County Commissioners approve Change Order No. 1 with Environmental Management Resources of Washington, Inc. (EMR, Inc.) to extend the construction time by 47 days on Contract No. C16- 2335-AP in order to complete the Destin Executive Airport (DTS) Air Traffic Control (ATCT) Project. BACKGROUND: The construction contract for the ATCT Project at DTS was issued on October 6, 2015 to EMR and the Notice-to-Proceed was issued on November 9, 2015. The project includes the construction, equipping, and roadway and utilities of the DTS Air Traffic Control Tower. The project is funded by Federal Aviation Administration (FAA), Florida Department of Transportation (FDOT), Local Match (County), and approved Passenger Facility Charges (PFC). Attached as back-up to this Agenda Request:  Change Order No. 1, increasing the amount of time needed to complete the project by 47 days. Pursuant to General Conditions Article 12.3, abnormal weather conditions were encountered during construction. There were multiple months that exceeded the normal amounts of rainfall per General Provisions 10-11. Per Attachment A, EMR, Inc. requested 61 days and through negations and as permitted by the contract documents, 47 days were agreed upon. This change order will give the contract a new substantial completion date of October 24, 2016. Change Order No. 1 has been approved by Airports Director, Tracy Stage, Project Engineer, Brad Wente, and EMR, Inc.’s President, James Foster. The Change Order was also approved by FDOT District 3 Program Manager, Philip Deal and FAA Program Manager, Chastity Clark.  Supporting documentation to Change Order No. 1, Attachment A and Attachment B, which further summarizes the number of weather days in question.  The County’s Internal Coordination Sheet, with document approvals by the Purchasing Department and Legal Department. OPTIONS: Approve, Reject, or Table. RECOMMENDATIONS: It is Staff’s recommendation that the Board approve Change Order No. 1 with Environmental Management Resources of Washington, Inc. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — October 4, 2016 — Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request.” October 4, 2016. Action Item Printout. Crypt of Echoes evidence ID LED-2026-51bf260cf414407b9f3d472df8726d91. http://127.0.0.1:58097/evidence/LED-2026-51bf260cf414407b9f3d472df8726d91. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Change Order No. 1 for Destin Air Traffic Control Tower Project — agenda request, meeting materials for October 4, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=22028&MeetingID=1362

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓