Okaloosa County BOCC — January 21, 2014 — Security Checkpoint Exit Lane Task Order No.15 CPS Funding Spreadsheet and Email Correspondence — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 26-Security Checkpoint Exit Lane Task Order No.15 CPS Funding Spreadsheet and Email Correspondence.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
TASK ORDER APPROVAL FORM
CONTRACT #: CO9-1737-AP
TASK ORDER #: 15
TASK ORDER AMOUNT: $77,322
OFFERED BY CONSULTANT:
Reynolds, Smith and Hills, Inc.
FIRM’S NAME
—— Walz
leNENew, S PRINTED NAME
SIGNATURE
Vice President — Aviation
December 16, 2013
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
ONE po
Oirector of i Wepoots
TITLE
Vo- AD-\V
DATE
COUNTY ADMINISTRAT@R (if applicable)
2 fog)
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e §25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
e In excess of $50,000-approved by the Board.
PURCHASING DIRECTOR
jruetijyh
DATE
CHAIRMAN (if applicable)
DATE
RS&H Project No. 201-0940-011
RS&H Contract No. CO9-1737-AP
Task Order No. __\.5
Date: December 16, 2013
Task Order
Northwest Florida Regional Airport, Okaloosa County, Florida
Security Checkpoint Exit Lane Controls System
Construction Phase Services
Reynolds Smith and Hills, Inc. a Florida Corporation (hereinafter “CONSULTANT”) agrees to
perform and complete the following services (hereinafter “Services”) for the Okaloosa County
Board of County Commissioners (hereinafter “COUNTY”), in accordance with the terms and
conditions of the Agreement for Professional Architectural, Engineering, and Aviation Planning
Services, dated 07 July, 2009, all of which terms and conditions are incorporated herein by
reference.
1. Task Location: Northwest Florida Regional Airport, Okaloosa County, Florida.
2. Task Name: Security Checkpoint Exit Lane Controls System — Construction Phase Services.
3. Task Description/Scope of Services: Construction Phase Services as detailed in
Attachment “A”
4. Compensation: Lump Sum Fee of $77,322.00
5. Schedule: Notice to Proceed anticipated January 20, 2014. Total Contract time is 120
calendar days.
6. Deliverables: N/A.
7. Other Considerations: None at this time.
ATTACHMENT ‘A’
NORTHWEST FLORIDA REGIONAL
AIRPORT
OKALOOSA COUNTY BOARD OF
COMMISSIONERS
Northwest Florida Regional Airport
Security Checkpoint Exit Lane Controls System
Construction Phase Services
ATTACHMENT “A” - SCOPE OF WORK
Security Checkpoint Exit Lane Controls System Construction Phase Services
A. PROJECT DESCRIPTION
Due to anticipated changes in TSA rules, Northwest Florida Regional Airport has
identified a need to develop a technology solution to monitor the exit lanes located at
the security check point in the terminal facility. Currently the Exit Lane where arriving
passengers exit at the security check point at the first level of the terminal is manned
by a TSA officer to prevent unauthorized entry to the sterile area of the concourse
facility.
TSA does not have a list of approved system manufacturers for the function. TSA will
typically test the system after installation and accept it based on their testing and
performance criteria at the time. The testing method and criteria may vary from location
and local TSA authority approving the installation.
Working with the airport staff and the TSA, RS&H designed a solution using technology
to monitor the exit lane at the SSCP. Okaloosa County accepted bids on this design
and is intending to award the project. RS&H will, through this Task Order, provide
Construction Phase support for the project.
B. BASIC SERVICES - Construction Phase Support:
RS&H will attend the pre-construction meeting and provide nightly on-site project
representation for the four week period anticipated for construction activities at the
airport, project management support at each weekly construction progress meeting
and basic construction phase services including contractor submittal reviews,
contractor inquiries/responses, completion, closeout and as-built review.
C. IMPLEMENTATION SCHEDULE
e Anticipate NTP to Contractor in January 2014.
D. MEETINGS AND DELIVERABLES
RS&H will attend one (1) pre-construction meeting, twelve (12) weekly
progress/construction meetings, one (1) project closeout meeting.
RS&H will update the design drawings with contractor provided as-built information and
deliver to NW Florida Regional Airport.
The scope of serviced provided in this proposal is limited to the specific work items enclosed
herein. Alterations to the project scope, project approach, project schedule, project sequencing,
and discovery of unforeseen circumstances, revisions to bid package format or content, or other
revisions may be cause for additional services to be provided under this agreement and for
corresponding adjustments to the lump sum project fee.
Construction Phase Services
December 16, 2013
Page 4
Okaloosa County, Florida
Northwest Florida Regional Airport
Security Checkpoint Exit Lane Controls System
6
eS HE. OKALOOSA COUNTY AIRPORTS SYSTEM
OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS
Attachment B - Project Costs
NORTHWEST FLORIDA REGIONAL AIRPORT
PASSENGER EXIT LANE CONTROL SYSTEM
CONSTRUCTION PHASE SERVICES
BASIC SERVICES
SUMMARY
Totals
Task 3.1 Construction Administration
Basic Services $13,770
Task 3.2 Periodic Site Visits/Weekly Site Visits
Basic Services $42,196
Task 3.3 Resident Project Representative (RPR) - 4 Weeks
Basic Services $21,356
BASIC SERVICES - TOTAL $77,322
GRAND TOTAL LUMP SUM FEE $77,322
Project Title: Security Checkpoint Exit Lane Controls System (VPS) County Airport Project Number vPS003
Reynolds Smith and Hills, Inc.
Airport Match Airport
FDOT PFC's Reserves Total Funding
TO#: Inv: Date: 50% 50% 100% 10% $617,907.00
Contract #:___C09-1737-AP $308,953.50 $308,953.50
Pay Application No.:
PFC use will be
approved
County Airport Project# VPSO03 Expiration 6/30/2016 in FAA Application #6
Grant# AR742
Retainage
Bid #: Date:
Construction Award
Construction Start: County County
Construction C Check Date | Check # | Invoice Date Invoice # Invoice Amount TBD 4207/562433 421-2051100 Check Total
Cathey C {TBD 7th BCC)
$496,846.00 $
Percentage Complete $ -
$
Task Order (TO #12} z Sere :
Design and Bidding Services 12/18/13 2010940011-0001 | $ 43,739.00 $ 43,739.00
$
$43,739.00 $
Percentage Complete $ -
$
43,739.00
100.00%
Task Order {TO # 15) (TBD 7th BCC}
Construction Phase Service
$77,322.00
0.00%
Misc Charges
$ =
$ 43,739.00
wn]ololufa
$ 43,739.00 $0.00
wn
uw
Total Funding of Program Cost
$617,907.00)
[ Grant Amount & Match | $ -_ [$s
L Balance ining | $308,953.50] $308,953.50}
Cathey Construction | $ :
TO # 12 Total to Date} $ 43,739.00
TO # 15 Total to Date| $ :
Misc Charges} $ =
L._Totar] $ 43,739.00
1/14/2014
Wendy Cain
From: Tracy Stage
Sent: Tuesday, January 14, 2014 11:30 AM
To: Sunil Harman; Mike Stenson; Jon Morris; Lori Fox; Wendy Cain; Dave Miner
Subject: FW: Airport Agenda Items - Jan 21 BCC
Attachments: RS&H Security Checkpoint Exit Lane Control Systems Project TO #15 CPS.PDF; Security
Checkpoint Exit Lane Control System at NWFRA.PDF; FDOT Grant Amendment.pdf; RFP/bid
awards and resulting contracts
Importance: High
Below is the reply | received from Zan.
Tracy Stage, A.A.E.
Deputy Director
Okaloosa County Airports
(850) 651-7160 Ext. 4
http://www. flyvps.com
From: Zan Fedorak
Sent: Tuesday, January 14, 2014 11:23 AM
To: Tracy Stage
Cc: Kay Godwin
Subject: FW: Airport Agenda Items - Jan 21 BCC
Importance: High
Tracy,
| have attached the email that | received from the Clerk’s office regarding the process for RFP/bid awards. We plan to
discuss this at next week’s staff meeting to get staff informed. This process will affect future routing and associated
processes for contract award.
In the past, the use of the “Contract & Lease Internal Coordination Sheet” to route documents other than contracts or
leases has caused confusion. We request that you use this form for coordination of contracts and leases only, to include
amendments, to avoid further confusion.
Regarding the attached documents:
Task Order #15 was previously approved by Purchasing per Richard’s signature on the Task Order approval.
Security Checkpoint was previously approved by Purchasing per signatures on the Contract & Lease Coordination Sheet.
Grant application documents should be reviewed by the Clerk’s Contracts and Grants office. Please reference the
comments above on including the “Contract & Lease Internal Coordination Sheet” for the grant review.
Thanks
Zan
From: Jack Allen
Sent: Tuesday, January 14, 2014 10:41 AM
To: Zan Fedorak
Subject: FW: Airport Agenda Items - Jan 21 BCC
Importance: High
Zan,
Tracy just called and they are waiting on your response addressing the three issues we discussed yesterday with him in
response to this email.
The discontinued use of the Coordination sheet for docs that are not “Contracts/Leases”.
The change concerning the two step process required by Finance/Purchasing involving Board approval of Contracts.
The proper review of Grant application docs.
Thanks,
Jack
From: Tracy Stage
Sent: Monday, January 13, 2014 2:28 PM
To: Zan Fedorak
Cc: Jack Allen; Sunil Harman; Ernie Padgett; Jon Morris; Wendy Cain; Lori Fox
Subject: Airport Agenda Items - Jan 21 BCC
Good afternoon Zan,
Pursuant to our discussion regarding the appropriate use of the Airport Coordination Sheet, and as subsequently agreed,
| am requesting the Purchasing Department’s review, coordination and reply of the three attached agenda item
packages (listed below) that the Department of Airports has proposed for the Jan 21 BCC meeting agenda. Two items,
AR 2399 & 2401, have previously been routed to Purchasing and fwd to the required reviewing authority — specifically
the County Attorney and Risk Management. Subsequent to their routing, we received previously requested grant
funding from the FDOT and the items descriptions pertaining to funding have been updated and the “Grant Funded box”
has been checked on the coordination sheet. Per our earlier e-mail correspondence and for clarification purposes, the
Department of Airports does not decide who/when an item is to be reviewed by any of the reviewing entities identified
on the “Contract & Lease Internal Coordination Sheet”. The item is sent to the Purchasing Dept and fwd on per
policies/protocol. For item 2398, which is a grant, normally, the item is sent to Contracts and Grants and the County
Attorney for coordination (by way of email) before placement on the BCC agenda. Is this the protocol we should
continue pertaining to grants (grants only)? It is attached herewith with a coordination sheet. If there are any
additional changes to the proper protocol or procedures on contracts, please let me know.
1. AR 2399
2. AR 2401
3. AR 2398
Thank you in advance for your review and your reply clearing these items for the agenda is appreciated. Should anyone
question our efforts pertaining to coordination, this correspondence shall serve as reference.
Thank you,
Tracy Stage, A.A.E.
Deputy Director
Okaloosa County Airports
(850) 651-7160 Ext. 4
http://www. flyvps.com