Fort Walton Beach Council agenda — 08-22-2006 (regular) — reading text
Part 8 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13123-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
approved by City Council. The parking cannot
interfere with the clear line of
sight for all street connections or any other line of
sight necessary for safe traffic movements.
5) Parking spaces in
right- of-way cannot be part of required number of
spaces for the development. parking
6) A Letter of Credit to the
City of Fort Walton Beach will be required for the
installation of the proposed sidewalk and
parking ( if approved) within the right-of-
way. The Letter of Credit will be released after
the right-of-way is
completion of the improvements in
approved by the Public Works Department.
7) Handicap
ramps for sidewalks shall be constructed at raised curbs,
the latest Florida according to
Accessibility Code.
8) It appears there will be a
large drop in elevation from the parking area to the
existing street connection at the proposed driveways. Add the note
2% cross slope at the crosswalk regarding the
locations so they are not overlooked
contractor. ( Note number 8 in the CRA Standard by the
Notes on the Grading Plan)
9) Instead of 2 foot
drop curb install the City' s Standard 4 foot wide
Turnout Curb and Gutter at the Driveway
driveway connection on Staff Drive. This provides
a seamless
gutter line in the curb.
Regular Council 8- 8- 06
286
SITE PLAN APPROVAL - CBG WALDORFF BUILDING cont.
10) The Florida Department of Transportation ( DOT) must be notified of all work along
a State Road. Contact the DOT asset manager, VMS, at ( 850) 678- 2993. If a permit
is required from DOT, notice of approval shall be provided to the City prior to the
issuance of a building permit.
11) Change the note on the dumpster gate clearance to be at least 10 feet 6 inches.
12) Locate the stop bars at the driveway connections to the approaching side of the
crosswalks.
Utilities Department comments:
1) There is a 6" cast iron water main available on the east side of Eglin Parkway and
a 6" water main available along Staff Drive for any required water service
connections. The plans do not indicate any existing or proposed water service
connections. Any proposed water services should be identified on the plans,
including the size of the tap, location and size of the meter, and location and type
of backflow preventer. If any existing water services are to be used, they shall
also be identified on the plans.
The sizes and locations of existing water mains and appurtenances shall be
verified and shown on the plans prior to approval of this development.
2) According to office drawings, there is an existing 8" terra cotta sanitary sewer
gravity main available on the north side of Staff Drive. There are two existing stub-
outs extending to the property: one from an existing manhole ( MH # 388) and one
from the 8" gravity sewer. The plans do not show any existing or proposed
sanitary sewer connections. The use of any existing or proposed sewer laterals
shall be indicated on the plans, including location of the connection, pipe, size,
pipe material, upstream and downstream invert elevations, and slope.
The sizes and locations of the existing sanitary sewer main and manholes shall be
verified and shown on the plans prior to approval of this development.
3) Backflow preventers are required on all water service lines and shall be installed
on private property. Meters shall be installed in a right- of-way or easement.
The City shall be responsible for performing any required water main taps,
installing the service lines up to the right-of- way line, and installing the water
meters. The Developer shall be responsible for installing the backflow preventers
and all onsite piping outside the right-of- way line.
4) Sanitary sewer cleanouts shall be required at all bends, outside the building, and
at the right- of-way line.
The Developer shall be responsible for locating the existing sewer stub-outs to the
property. If any of the existing stub- outs are to be used, the City shall install a
clean out at the right-of-way line and the Developer shall be responsible for all
sewer piping from the right- of-way to the building. If a new connection is required,
the City shall be responsible for making any sewer taps and installing the lateral
from the main to the righto- f- way line. The Developer shall be responsible for
installing all sewer piping from the right-of- way line to the building.
5) Water meters are to be accessible to the water meter readers and located in an
area not susceptible to heavy traffic, preferably a grassed area, not in a driveway
orparking space.
6) responsibility of the Developer' s Engineer to determine if FDEP and/ or
It is the
FDOT permitting is required for the water or sewer services.
7) Water and sewer impact fees shall apply to the new development. 1, 000 if of
office space = 0. 35 ERCs.
Impact fees for water are $ 700 per ERC, and the fees for sewer are $ 807 per ERC.
Based on the size of the proposed building ( 35,000 if),the total number of ERCs
for this development is 12. 25, resulting in estimated water impact fees of $ 8, 575
and estimated wastewater impact fees of $9, 855.75.
8) Water and sewer connection fees shall be determined when the final utility plan
has been submitted and approved.
Regular Council
8- 8- 06
287
SITE PLAN APPROVAL - CBG
WALDORFF BUILDING cont.
9) The development must meet
FDEP environmental
for sediment and soil erosion regulations and FDOT standards
control. The proposed sediment
and erosion control
measures shall be installed
prior to commencement of any demolition of
structures or construction of the existing
10) See list of standard
proposed development.
notes to be added to the final
plans. The plans shall not be
approved until all required standard notes are
11) The materials and sizes for
included on the plans.
and appurtenances shall be
existing and proposed water and
sewer service mains
identified on the plans
and slopes of the along with invert elevations
proposed sewer mains. The onsite water and sewer
shall be deemed private systems
systems. The City maintenance responsibilities will
at the right- of- end
way line.
Utilities Department comments:
1) Site is greater than 1 acre and will
2)
require NPDES permit from FDEP.
City request copies of all necessary
permits from FDEP be submitted to
Environmental Specialist.
3) Utilities Operation
Manager will provide standard notes, please add those to the
plan set.
Prior to issuance of the
building permit, the above items shall be addressed with
any necessary revisions submitted to the
Stormwater Division/ Environmental
Specialist for approval.
2. Prior to Certificate of
a. All public
Occupancy:
sidewalks/ crosswalks shall be constructed
and striped as per
FDOT specifications as
applicable, including consistency with ADA
City and
Any existing curb cuts along Eglin requirements.
Parkway NE and Staff Drive NE that will no
be utilized for this
parcel will be curbed and sidewalk reconstructed longer
b. All required where applicable.
City and State easements and permits ( i. e.,
stormwater, utility, sidewalk,
driveway, etc.) shall be executed and approved the appropriate
Mr. Campbell seconded motion by agency.
and it carried
Tucker, Pullen, Hartwell, and Minich unanimously with Holmes, Patterson, Campbell,