issue on a site plan showing the entire
shopping center in relation to adjoining street.
3. As was brought up by some CRA Board members when
they reviewed the
conceptual plans, safety is a major concern. The fact that the park is located
between drive aisles for back- up parking is the
primary issue. Please address
these safety concerns possibly in the
following ways:
a. The drive aisle between the
parking spaces and the park' s curbing is 16 or 17
feet in width. Consider striping at the 12' required drive aisle width to
give the
perception of a smaller lane for vehicular access and using stamped asphalt or
pavers for the 4- 5' " pedestrian walk."
b. Consider installation of an open style fence 3-4' in height along the entire
perimeter of the park, with gates at all pedestrian entrances.
c. Where the pedestrian entrances are located, consider
installing intersection
humps" raised to the level of the curbing.
4. Although there are handicapped spaces located throughout the shopping center
parking lot, there are none shown near the park. Please add one or two spaces,
perhaps across from the car " drop- off" area using the raised intersection hump.
Utilities Department comments:
1) The water and wastewater demands listed on the
Concurrency Forms shall be
verified and revised as necessary. The estimated flows seem low for two
restrooms and a fountain.
2) The Utility Plan shows 455 linear feet of proposed 2" water service main
coming
from the south. The plan should indicate the tie-in point to the south and whether
the connection will be to an existing or proposed water main.
3) According to office drawings, there is an available 8" terra cotta gravity sanitary
sewer main available as shown on the
Utility Plan. The plans show a proposed 6"
service line with two new manholes and one cleanout.
The Developer shall be responsible for all onsite sewer installation and the
connection to the existing sewer main. The sizes and locations of the existing
sanitary sewer manholes and mains shall be verified prior to approval of this
development.
4) The proposed Utility Plan requires a 6" sewer main connection to an existing 8"
gravity sewer main with a new manhole and a 2" water service line with a new 2"
water meter, valve, and backflow preventer. Backflow preventers are required on
all water service lines and shall be installed on private
property. Meters shall be
installed in a right-of-way or easement.
5) Water meters are to be accessible to the water meter readers and located in an
area not susceptible to heavy traffic, preferably a grassed area, not in a driveway
or parking space.
6) It is the responsibility of the Developer' s Engineer to determine if FDEP and/ or
FDOT permitting is required for the water or sewer services.
Regular Council 8- 8- 06
284
SITE PLAN APPROVAL - CENTRAL PARK AT UPTOWN STATION cont.
7) Water and sewer impact fees shall apply to the new development. The Developer
must complete an ERC Determination Form based on the table provided in the
impact fee ordinance or estimated water and wastewater flows.
8) Water and sewer connection fees shall be determined when the final utility plan
has been submitted and approved.
Based on the preliminary utility plan, the connection fees are $ 1, 000 for water and
600 for sewer. This does not include potential fees for pavement or sidewalk cuts
or any other additional fees that may be necessary.
9) The development must meet FDEP environmental regulations and FDOT standards
for sediment and soil erosion control. The proposed sediment and erosion control
measures shall be installed prior to commencement of any demolition of existing
structures or construction of the proposed development.
10) The proposed sediment and erosion control measures shall be shown and
identified on the Demolition Plan.
11) See list of standard notes to be added to the final plans. The plans shall not be
approved until all required standard notes are included on the plans.
12) The pipe material of the proposed 2" water service main and 6" sanitary sewer
main shall be indicated on the plans.
13) The construction plans shall include a detail sheet depicting the proposed
connection to the sanitary sewer manhole and installation of the water and sewer
service mains.
Mr. Campbell seconded motion and it carried unanimously with Holmes, Patterson, Campbell,
Tucker, Pullen, Hartwell, and Minich in favor.
Mr. Tucker moved to waive the permit fee for the project. Mr. Patterson seconded motion and
it failed by a vote of 3 to 4 with Patterson, Campbell and Tucker in favor and Holmes, Pullen,
Hartwell, and Minich opposed.
SITE PLAN APPROVAL - CBG WALDORFF BUILDING
Consideration of a request by DAG Architect on behalf of property owner CBG Properties, Inc. and
WFW of N. W. Florida, LLC for site plan approval of the CBG Waldorff Building, 45 Eglin Parkway NE,
subject to conditions outlined in the backup report. The project consists of the construction of a three-
story, 35, 000 square foot office building, with associated parking, landscaping and other amenities.
Arne LeMay, Choctaw Engineering, briefly went over the proposed project.
Peggy Fowler, CDS Planner, reported staff recommends approval, with conditions. She submitted the
staff report for the record. Ms. LeMay had no object to the staff report.
The Mayor opened the floor for public input. As there was none, the public hearing was closed.
Mr. Tucker moved to approve the site plan for the CBG Waldorff Building, located at 45 Eglin
Parkway NE, subject to the following conditions:
Note: The recommendation is based upon the application submitted by the applicant, site plan
drawings developed by Choctaw Engineering, Inc. ( project 2005- 282- A, dated 5/ 10/ 06, revised
6/ 23/ 06), architectural drawings developed by DAG Architects ( project # 05048, dated 6/ 23/ 06),
and landscape plan by Bradford R. Davis, Inc. ( project 45 Eglin Parkway, dated 6/ 23/ 06).
1. Prior to issuance of a building permit:
a. The placement of on- street parking spaces identified as " future" on site plan must be
approved by Public Works to satisfy safety requirements.
b. A landscape plan prepared by a professional landscape architect or nurseryman must
be submitted and approved by CDS staff. The plan must comply with all applicable
regulations in Section 12. 71 of the LDC. Design for an irrigation system with a well
must be provided. The plan shall include landscape perimeter plantings surrounding
the retention pond in the southeast corner of the property.
Regular Council 8- 8- 06
285
SITE PLAN APPROVAL - CBG WALDORFF
BUILDING cont.
c. The plans must address
all applicable items submitted
Utilities, and Building Inspections
by Pubic Works/ Engineering,
departments/ divisions in memorandums distributed
at the May 30, 2006 DRC
meetings ( as follows):
CDS Department/Inspection Division
comments:
1) Four complete sets of
plans shall be submitted including structural calculations.
2) Indicate special
inspector qualifications. Will need reports submitted on
inspections performed and will need verifications on all hurricane
and final letter of
connections
approval.
3)
Architect of design shall also submit final letter of
4) Title page including
approval.
occupant load ( Section 106. 3. 5).
5) Submit product
approvals.
6) Need geotechnical soil
analysis done and submitted with plans.
7) Show truncated dome for
any street transitions/ sidewalks.
8) Show backflow preventor -
put on notes that backflow will be tested by AI Jordan
of our water ops 833- 9630.
9) Submit energy forms.
10) Detail all firewalls and
penetration.
11) Show termite treatment
procedure.
12) An as built
survey shall be submitted after slab inspection.
13) A compaction test shall be
submitted.
14) Show bonding of all water,
gas, steel in foundation.
15) Street number shall be installed
by final inspection.
16) Water heaters shall have a
switched disconnect.
17) Mechanical units shall be
physically secured.
18) Show attic accesses.
19) Show insulations.
20) Signage shall be
permitted separately.
Public Works Department/Enaineerina
Division comments;
1) The official address for the
development is 45 Eglin Parkway NE.
2) Clarify the correct spelling of the development and make corrections on the
as plans
necessary.
3) Identify the vertical datum used on the plans, i. e. NGVD ' 29.
4) Installation of parking spaces in
City right-of-way requires special review by the
Public Works Director and must be