READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — November 5, 2013 — reading text

Part 2 of 37. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

vacation be approved, but Water and Sewer requests that they be allowed to gain access to the meters for periodic reading and maintenance. If a fence were to be erected, access privileges would have to be coordinated with the water and sewer department. No other utility has expressed any objections at this time. OPTIONS: Approve/Disapprove the vacation of the northern 150' of the 20' alley in Block 7 of the Bay View Subdivision in the Ocean City area with the stipulation that a utility/drainage easement be retained and access to the easement be granted to water and sewer for periodic meter reading and maintenance. Packet Pg. 11 RECOMMENDATIONS: Approve the vacation of the northern 150' of the 20' alley in Block 7 of the Bay View Subdivision in the Ocean City area with the stipulation that a utility/drainage easement be retained and access to the easement be granted to water and sewer for periodic meter reading and maintenance. . RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator Packet Pg. 12 Packet Pg. 13 Packet Pg. 14 Packet Pg. 15 Packet Pg. 16 Packet Pg. 17 Packet Pg. 18 Packet Pg. 19 Packet Pg. 20 RESOLUTION NO. 13 - ________ WHEREAS, Mark C. Siner, P. E. Engineer for Choctaw Engineering, Inc., on behalf of Fortune 900 LLC., petitioned the Board of County Commissioners of Okaloosa County, Florida, to vacate a portion of the north-south alleyway through Block 7 of Bay View Subdivision, Fort Walton Beach, Florida, more particularly described as follows: The 20 foot wide alleyway bounded on the west by Lots 9, 10, and on the east by Lots 19, 20, and bounded on the north by 2nd Avenue right-of-way, all in Block 7, Bay View Subdivision according to the plat recorded in Plat Book 1, Page 26 of the public records of Okaloosa County. And WHEREAS, the Board has considered the same and heard the proposal in detail. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Okaloosa County, Florida, that the petition of the above named party to vacate property hereby described is granted as follows: 1. THAT the County reserves for itself, and any and all licensed utility companies, their successors and assigns a full width utility easement in the entire portion of the right-of-way vacated hereby for the purpose of locating and maintaining public utilities and for stormwater/drainage purposes. No structures other than stormwater/drainage improvements and fencing shall be permitted unless approved by the Board of County Commissioners. Removal of existing fences for utility construction is permitted and will be the sole responsibility of the landowner to reinstall after completion of utility installation. Access to the easement shall be readily available to the Okaloosa County Water & Sewer Department for routine meter reading and infrastructure maintenance. DULY PASSED AND ADOPTED in the regular session this 17th day of December, 2013. BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA ____________________________________ DON R. AMUNDS, Chairman ATTEST: DON W. HOWARD CLERK OF CIRCUIT COURT By:__________________________________ Deputy Clerk Packet Pg. 21 Packet Pg. 22 Packet Pg. 23 Packet Pg. 24 Packet Pg. 25 Packet Pg. 26 Packet Pg. 27 Packet Pg. 28 Packet Pg. 29 Packet Pg. 30 BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 17, 2013 TO: Honorable Chairman and Members of the Board FROM: Sunil Harman SUBJECT: NWFRA Ground Transportation Policy DEPARTMENT: Airport BCC DISTRICT: All STATEMENT OF ISSUE: Staff is proposing adoption of the attached ordinance to replace the current ground transportation policy at the Northwest Florida Regional Airport. BACKGROUND: On April 26, 1977 the Board adopted Ordinance 77-11, which established rules and regulations governing the ground transportation operations at the Northwest Florida Regional Airport. On June 19, 2007, the Board adopted Ordinance 07-29, Attachment 1 to Ordinance 77-11, which amended the ground transportation policy. In reviewing the current ground transportation policy, we found significant changes that need to be made. Due to the extent of changes being proposed, we recommend that the Board repeal the existing Ground Transportation Policy and replace it in its entirety with the attached policy. OPTIONS: Approve, Reject or Table. RECOMMENDATIONS: It is Staff's recommendation that the Board approve this Ordinance regulating the Ground Transportation Policy at the Northwest Florida Regional Airport. RECOMMENDED BY: APPROVED BY: Ernie Padgett, County Administrator Packet Pg. 31 Packet Pg. 32 Packet Pg. 33 Packet Pg. 34 Packet Pg. 35 Packet Pg. 36 Packet Pg. 37 Packet Pg. 38 Packet Pg. 39 Packet Pg. 40 Packet Pg. 41 Packet Pg. 42 Packet Pg. 43 Packet Pg. 44 Packet Pg. 45 Packet Pg. 46 Packet Pg. 47 Packet Pg. 48 Packet Pg. 49 Packet Pg. 50 Packet Pg. 51 Packet Pg. 52 Packet Pg. 53 Packet Pg. 54 Packet Pg. 55 Packet Pg. 56 Packet Pg. 57 Packet Pg. 58 Packet Pg. 59 Packet Pg. 60 Packet Pg. 61 Packet Pg. 62 Packet Pg. 63 Packet Pg. 64 Packet Pg. 65 Packet Pg. 66 Packet Pg. 67 Packet Pg. 68 Packet Pg. 69 Packet Pg. 70 Packet Pg. 71 Packet Pg. 72 Packet Pg. 73 Packet Pg. 74 Packet Pg. 75 Packet Pg. 76 Packet Pg. 77 Packet Pg. 78 Packet Pg. 79 Packet Pg. 80 Packet Pg. 81 Packet Pg. 82 Packet Pg. 83 Packet Pg. 84 Packet Pg. 85 Packet Pg. 86 Packet Pg. 87 Packet Pg. 88 Packet Pg. 89 Packet Pg. 90 Packet Pg. 91 Packet Pg. 92 Packet Pg. 93 Packet Pg. 94 Packet Pg. 95 Packet Pg. 96 Packet Pg. 97 Packet Pg. 98 Packet Pg. 99 Packet Pg. 100 Packet Pg. 101 Packet Pg. 102 Packet Pg. 103 Packet Pg. 104 Packet Pg. 105 BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: December 17, 2013 TO: Honorable Chairman and Members of the Board FROM: Rick Owen SUBJECT: Veterans Park Living Shoreline - Preliminary Design and Environmental Permitting DEPARTMENT: Tourist Development Department BCC DISTRICT: ALL STATEMENT OF ISSUE: Staff requests the Board approve and authorize the Chairman to sign Task Order #1, contract C14-2117-TDD with Taylor Engineering in the amount of $106,108.00 for preliminary engineering design, coastal engineering analysis, natural resources survey, and permit application assistance to pursue regulatory authorizations for Phase I of the living shorelines project for Veteran's Park. Staff also requests that the Board authorize staff to pursue any and all grant/funding opportunities for this project. BACKGROUND: The Choctawhatchee Bay shoreline along Veteran's Park is experiencing long term chronic erosion. This erosion is responsible for loss of valuable property with the resultant loss of recreational opportunities and loss of upland resources and habitat. Staff proposes a "soft", living shorelines approach to counter this erosion. This approach has been successful in countless areas and will create educational and tourism related opportunities as well. Also, in beginning the permitting process we can position this project in a more favorable position for National Resource Damage Assessment, RESTORE and other funding opportunities. OPTIONS: Approve/Disapprove RECOMMENDATIONS: Approve and authorize the Chairman to sign Task Order #1, contract C14-2117-TDD with Taylor Engineering in the amount of $106,108.00 for the preliminary design and environmental permitting of the Veteran's Park living shoreline project and authorize staff to pursue grant/funding opportunities for this project. RECOMMENDED BY: Packet Pg. 106 APPROVED BY: Ernie Padgett, County Administrator Packet Pg. 107 Packet Pg. 108 Packet Pg. 109 Packet Pg. 110 Packet Pg. 111 Packet Pg. 112 Packet Pg. 113 11/7/2013 Okaloosa County Project Greenshores November 2013 Okaloosa County Project Greenshores • Project Overview – Background – Conceptual Project Design – Project Elements • Stakeholders and Project Partners • Recommended Phasing Plan • Schedule • Project Costs and Funding Opportunities 2 Packet Pg. 114 1 11/7/2013 Project Overview Background • Eroding Shoreline • Noticeable Property Losses • Losses of: – Recreational Area – Shoreline Habitat – Upland Resources and Habitat • Threatening Upland Infrastructure • Minimal Recreational Uses 3 Conceptual Project Design Project Goals • Stabilize the Eroding Shoreline • Protect Upland Property, Infrastructure, and Amenities • Protect Natural Resources • Restore, Create, and Enhance Natural Habitat for Aquatic and Terrestrial Species • Increase the Biodiversity and Sustainability of Choctawhatchee Bay • Create New Recreational and Educational Opportunities for Tourists and Residents 4 Packet Pg. 115 2 11/7/2013 Shoreline Erosion 5 Shoreline Erosion 6 Packet Pg. 116 3 11/7/2013 Shoreline Erosion 7 Shoreline Erosion 8 Packet Pg. 117 4 11/7/2013 Shoreline Erosion 9 Shoreline Erosion 10 Packet Pg. 118 5 11/7/2013 Shoreline Erosion 1994 Shoreline 11 Conceptual Project Design 12 Packet Pg. 119 6 11/7/2013 Conceptual Project Design Coastal Scrub Timber Boardwalk Coastal Dune Saltwater Marsh Offshore Breakwater Oyster Reef Breakwater / Oyster Habitat Seagrass MHW 13 Conceptual Project Design

Download this text file with its original spacing ↓