READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — November 5, 2013 — reading text
Part 18 of 37. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
including extinguishing agents and firefighting equipment and clothing necessary to
equip personnel.
3.1.3 Provide the required ARFF personnel and equipment at the ARFF at all times during
scheduled civil aircraft operations’ hours at the Airport.
3.1.4 All ARFF Services, including the provision of ARFF equipment, staffing and supplies
provided for the Airport, shall be provided at the level required and are subject to
inspection under Part 139 of the Federal Aviation Regulations or in accordance with
such substitute requirements and standards for such services, equipment and supplies
as may otherwise be agreed to by the United States Air Force and the Federal Aviation
Administration. All ARFF Services (including all ARFF equipment, manpower and
supplies (including extinguishing agents) shall be provided to Lessee and the Airport at
no additional cost other than the payment of the joint-use fees provided for in the JUA.
4.0 TERM
This Agreement shall be effective from the date of execution by the Parties and shall terminate upon the
expiration or earlier termination of the Lease.
5.0 REPRESENTATIVES
5.1 The authorized representative for the administration of and the amendment of this
Agreement on behalf of the Government is the Installation Commander, Eglin AFB, Florida
(“Commander”). Except as otherwise specifically provided, any reference in the Operating
Agreement to “Commander” shall include his or her authorized representative and any duly
appointed successor.
5.2 The authorized representative for the administration and amendment of this Agreement
on behalf of the Lessee is the Airports Director of Okaloosa County, Florida.
6.0 MANAGEMENT REVIEW COMMITTEE
The Lessee and the Government have previously established a Management Review Committee to
discuss issues related to the Northwest Florida Regional Airport Master Lease. This Committee will also
address issues with the ARFF Lease and this Operating Agreement.
2-3
Packet Pg. 521
7.0 ACCESS TO LEASED PROPERTY
The Government and the Lessee will have access to the Lease Premises and the ARFF as required to
fulfill requirements under the Lease.
8.0 TERMINATION AND MODIFICATION
This Agreement shall continue in full force and effect during the Lease term. The Agreement may be
amended or modified only by mutual agreement of the Government and Lessee in writing and signed by
both parties
9.0 NOTICES AND DISPUTES
Notices and disputes concerning this Agreement shall be governed by Conditions 20 and 22 of the Lease.
IN WITNESS WHEREOF, the respective duly authorized representatives of the Parties
hereto have executed this Agreement on the date set forth below their respective signatures.
UNITED STATES AIR FORCE
By:
Deputy Assistant Secretary of the Air Force (Installations)
Date:
OKALOOSA COUNTY, FLORIDA
By:
Chairman, Okaloosa County Board of County Commissioners
Date:
3-3
Packet Pg. 522
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 17, 2013
TO: Honorable Chairman and Members of the Board
FROM: Rick Owen
SUBJECT: Proclamation Approval for Mid Bay Bridge Authority Day
DEPARTMENT: County Administrator
BCC DISTRICT: All
BACKGROUND: The Mid-Bay Bridge Authority requests Okaloosa Board of County
Commissioners' support in proclaiming January 4, 2014 as "Mid-Bay Bridge Authority Day" in
Okaloosa County.
RECOMMENDATION: Staff recommends approval of Proclamation of "Mid-Bay Bridge
Authority Day" in Okaloosa County.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 523
PROCLAMATION
WHEREAS, the Mid-Bay Bridge Authority was formed by the Florida Legislature to plan,
build and oversee the construction and maintenance of the 3.6 mile bridge across Choctawhatchee Bay
between the Cities of Niceville and Destin in Okaloosa County, and such construction was completed in
1993, and;
WHEREAS, the Mid-Bay Bridge Authority has recently completed the eleven mile Mid-Bay
Bridge Connector between state Road Highway 85 and the Mid-Bay Bridge with five grade separated
interchanges and five major stream crossings, and;
WHEREAS, this new limited access highway will provide shorter travel times to Niceville, the
coastal communities, and areas east of Niceville along SR 20 by avoiding 14 traffic signals along the cur-
rent route through Niceville, and;
WHEREAS, the Mid-Bay Bridge and the Mid-Bay Bridge Connector highway are critical parts
of the Northwest Florida Panhandle transportation network that will add capacity and ease congestion
along existing corridors, and;
WHEREAS, the Mid-Bay Bridge Connector will provide an improved evacuation route from
these same coastal areas, and;
WHEREAS, the Mid-Bay Bridge Connector was built through cooperation with the United
States Air Force and Eglin Air Force Base, and will provide increased access to test ranges for military
operations, and;
WHEREAS, these above accomplishments would not have been completed without the dedi-
cated leadership of the Mid-Bay Bridge Authority Board of Directors and Staff;
NOW, THEREFORE, BE IT PROCLAIMED by the Board of County Commissioners of
Okaloosa County, Florida that the Fourth Day of January, 2014 is
MID-BAY BRIDGE AUTHORITY DAY IN OKALOOSA COUNTY.
DULY PASSED AND ADOPTED this 17th day of December, 2013.
BOARD OF COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
ATTEST: _________________________________
DON R. AMUNDS
CHAIRMAN
___________________________
DON W. HOWARD
CLERK OF CIRCUIT COURT
Packet Pg. 524
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 17, 2013
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Eglin Wastewater Treatment Contract Modification for Delivery Dates
DEPARTMENT: Water and Sewer
BCC DISTRICT: 1, 2 & 3
STATEMENT OF ISSUE: STATEMENT OF ISSUE: OCWS staff is requesting approval
from the BCC for the execution of a fifth contract modification with Eglin Air Force Base for
delivery date extensions related to construction work and Capacity Expansion Charges (CECs)
for Eglin AFB's wastewater at Main Base and Camp Rudder. Attached for your review is both
the modification itself and the completed County Contract Review Coordination Sheet.
BACKGROUND: In September 2011, Okaloosa County went under contract (FA2823-11-C-
0030; County Contract No. C11-1906-WS) with the U.S. Air Force for the construction of the
Duke Field wastewater infrastructure. The contract was modified in August 2012 to add the
following: CECs for Duke Field, construction costs for Main Base wastewater infrastructure,
CECs for Main Base, construction costs for Camp Rudder wastewater infrastructure, and CECs
for Camp Rudder. The total contract is now $16,699,568; of that, $8,026,192 is reimbursement
of design and construction costs, and $8,673,376 is for CECs.
A third contract modification was executed in April 2013 for flow charges (AKA monthly billing
rates) related to transmitting, treating, and disposing of Eglin AFB's wastewater at Duke Field,
Main Base, and Camp Rudder. No money was assigned to this modification.
A fourth contract modification was executed in June 2013 to correct several administrative
oversights pertaining to miscalculated delivery dates, payment methods, and verbiage of Eglin's
internal processes. No money was assigned to this modification.
Eglin AFB would now like to execute a fifth contract modification to extend the delivery dates
for the construction work and CECs for Phase II (Eglin Main Connections) and Phase III (Camp
Rudder Connections) by an additional 8 months due to government delays. As stated in the
contract modification itself, "The purpose of this modification is to affect No-Cost delivery date
extensions for contractor work on CLINs 003 through 006, due to government delays". The
modification only extends delivery dates, and has no affect on financial terms.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS staff recommends approval by the BCC to authorize the
Chairman to execute the fifth contract modification to the Eglin Wastewater Treatment Re-
Packet Pg. 525
configuration contract (FA2823-11-C-0030) for the delivery date extensions associated with
construction work and CECs for Main Base and Camp Rudder.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 526
1. CONTRACT ID CODE P AGE OF P AGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
J 1 6
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/P URCHASE REQ. NO. 5. P ROJECT NO.(If applicable)
SEE SCHEDULE
6. ISSUED BY CODE FA2823 7. ADMINISTERED BY (If other than item 6) CODE FA2823
AFTC/PZIOC EGLIN - DAVID SERBE
AFTC/PZIO EGLIN - FA2823 308 WEST D AVE, BLDG 260, STE 130
308 WEST D AVENUE, SUITE 130 (BLDG 260) EGLIN AFB FL 32542-5418
EGLIN AFB FL 32542-5418
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) 9A. AMENDMENT OF SOLICIT AT ION NO.
OKALOOSA, COUNTY OF
DBA: CONTRACTS & GRANTS
1804 LEWIS TURNER BLVD STE 206
9B. DAT ED (SEE IT EM 11)
FORT WALTON
