READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 16, 2012 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 97-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: November 20, 2012 TO: Honorable Chairman and Members of the Board FROM: John Hofstad SUBJECT: Information Item - Expansion of Enhanced Recycling Service (1-1-1) DEPARTMENT: Public Works BCC DISTRICT: ALL STATEMENT OF ISSUE: Waste Management, Inc (WMI) has provided a proposal to extend the enhanced recycling (1-1-1) program throughout the franchised areas of Okaloosa County (approximately 30,000 homes). BACKGROUND & ANALYSIS: At the Board’s direction earlier this year, WMI implemented a 1-1-1 pilot (Feb - Aug 2012) in the service areas encompassing approximately 2,400 homes in the Shalimar and Poquito Bayou areas. Results were positive in that the data showed a significant decrease in garbage disposal as well as a significant increase in the volume of recyclables collected at the curb. Additionally, a survey of residents participating in the pilot was conducted during the latter stages of the pilot program, which also affirmed a positive perception of the benefit of the program (results attached). When item was last brought before the Board it was decided that a decision would be deferred until the new BCC members were available to consider the issue. Staff subsequently had conversations with Waste Management who has requested a delay in their proposal consideration until they have time to evaluate rate incentives based on an analysis of recent billing information from Water & Sewer. Staff is requesting to defer this item to December at which time we will bring WMI's final offer before the Board. If unable to reach terms agreeable to both parties then staff will include 1-1-1 as part of its contract considerations for March 2016. OPTIONS: Information only RECOMMENDATION: Information only. Staff will return to the Board in December with a recommendation on a mid-term roll out of 1-1-1 or a recommendation to defer implementation as part of a new contract advertisement in 2016. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓