READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2008-15-Comp Fee Schedule-CDS Fees — reading text

Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-14273-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

RESOLUTION NO. 2008- 15 A RESOLUTION OF THE CITY OF FORT WALTON BEACH, FLORIDA, AMENDING THE COMPREHENSIVE FEE SCHEDULE OF THE CITY FOR THE COMMUNITY DEVELOPMENT SERVICES DEPARTMENT BY INCREASING BUILDING PERMIT FEES BY APPROXIMATELY THREE PERCENT ( 3%); AND SETTING AN EFFECTIVE DATE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WALTON BEACH: Section I. Pursuant to the authority of section 3. 02.05, Building Permit Fees, of the City Code of Ordinances, the Comprehensive Fee Schedule for the Community Development Services Department is amended to increase building permit fees by approximately three percent ( 3%). BUILDING PERMIT FEES ( Sec. 3.02. 05)* General Fees Current New Fee Contractors $ 39 per year $ 40. 25 Registration Building permit $ 20 in addition to permit $ 21. 00 processing fee fee Revisions to approved $ 25. 00 per submittal $ 25. 75 per submittal permit, per submittal SFD SFD 50. 00 per submittal MF $ 51. 50 per submittal 75. 00 per submittal MF Com $ 77. 25 per submittal Com Construction Permit Fees 501 to $ 50, 000 $ 36. 00 for the first 37. 10 for the first thousand, plus $ 6. 00 for thousand, plus $ 6. 25 each additional for each additional thousand or fraction thousand or fraction thereof, to and including thereof, to and 50, 000 includinQ $ 50,000 50, 001 to $ 100, 000 $ 330. 00 for first $ 343.35 for first 50, 000 plus $4.85 for $ 50, 000 plus $ 5.00 for each additional each additional thousand or fraction thousand or fraction thereof to and including thereof to and 100, 000 includinQ $ 100, 000 100, 001 to $ 500,000 $ 572. 50 for the first 593.35 for the first 100, 000 plus $ 3. 70 for $ 100,000 plus $ 3. 80 each additional for each additional thousand or fraction thousand or fraction thereof to and including thereof to and 500, 000 includinQ $ 500, 000 500,001 and up $ 2, 052. 50 for the first $ 2, 113. 35 for the first 500, 000 plus $ 2. 50 for $ 500, 000 plus $ 2. 60 each additional for each additional thousand or fraction thousand or fraction thereof thereof Threshold building $ 200. 00 + International $ 206.00 transmittal/ processing feeJlCC Code Conference review fee Moving Fee $ 110.00 $ 113. 50 Demolition Fee $ 55. 00 plus $ 8.60 per $ 56.50 plus $ 9.00 per 2, 000 sq ft above 1, 000 sq ft above 20,000 sq ft or fraction 20,000 sq ft or fraction thereof thereof Re- Inspection- Fee First - $35. 00 First - $36. 00 Second - $ 35. 00 Second - $ 36. 00 Third and more- Third and more - 105. 00 $ 110. 00 Certificate of Occupancy $ 35. 00 $ 36. 00 Certificate of Completion $ 35. 00 $ 36. 00 Temporary Certificate of Occupancy $ 250. 00 $ 257. 50 Mechanical Pennits and Inspection Permit Fee Base $ 36. 00 $ 37. 00 Inspection of heating, ventilation, $ 13. 75 for the first $ 14.25 for the first ductwork, air conditioning and $ 1, 000 or fraction $ 1, 000 or fraction refrigeration systems thereof of the valuation thereof of the valuation of installation plus $ 2.50 of installation plus for each additional $ 2. 60 for each 1 , 000 or fraction additional $ 1, 000 or thereof fraction thereof I nspecting repairs, alterations, and $ 5. 25 plus $ 3. 10 for $ 5.50 plus $ 3. 25 for additions on existing systems each additional $ 1, 000 each additional $ 1, 000 or fraction thereof or fraction thereof Inspecting Boilers Boiler Inspections $ 37. 00 for all boiler $ 38. 00 inspections Reinspection of a heating, ventilation, First - $35. 00 First - $ 36.00 air conditioning or refrigeration Second - $ 35. 00 Second - $ 36.00 system, or boiler inspection Third and more - Third and more - reinspection same as above) $ 105. 00 $ 110. 00 Inspection for permitting temporary First - $35.00 First - $ 36. 00 operation of heating, ventilating, Second - $ 35. 00 Second - $ 36. 00 refrigeration, or air condition system Third and more - Third and more - reinspection same as above) $ 105. 00 $ 110. 00 Plumbing and Gas Pennits Base Permit Fee $ 36. 00 $ 37.00 Plus, per plumbing fixture, floor drain $ 3. 10 $ 3. 25 or trap, including water and drainage pipe Plus, per sewer connection $ 11. 00 $ 11. 33 Page 2 Plus, per water heater and/ or vent $ 2. 80 $ 3. 00 For installation, alteration or repair of $ 5. 50 $ 5. 75 water piping and/or water treating equipment For repair/alteration of drainage or $ 5. 50 $ 5. 75 vent piping For vacuum breakers or backflow 1 to 5 - $ 2. 80; over 5, 1 to 5 - $ 3. 00; over 5, protective devices subsequent to the each - $ 1. 75 each - $ 2. 00 installation of the piping or equipment served Reinspection for faulty materials, First - $35. 00 First - $ 36. 00 equipment, apparatus or Second - $ 35. 00 Second - $ 36. 00 workmanship Third and more - Third and more - 105. 00 $ 110. 00 Electrical Penn its Base Permit Fee $ 36. 00 $ 37. 00 Plus, per circuit $ 1. 50 $ 1. 75 Temporary pole $ 16. 75 $ 17. 50 Reinspection for faulty materials, First - $ 35.00 First - $ 36. 00 equipment, apparatus or Second - $ 35.00 Second - $ 36.00 workmanship Third and more - Third and more - 105.00 $ 110. 00 Site Plan Gross Floor Area of Building Residential per 100 sf Residential per 100 sf Review fee Commercial per 100 sf Commercial per 100 sf added to Four units or more, up to 5, 000 sq $ 1. 30 $ 1. 40 permit fee feet $ 1. 65 $ 1. 75 5, 001 to 10, 000 $ 1. 15 $ 1. 25 1. 40 $ 1. 50 10, 001 to 25,000 $ 1. 05 $ 1. 10 1. 30 $ 1. 35 25, 001 to 50, 000 $ 0. 90 $ 0.95 1. 05 $

Download this text file with its original spacing ↓