2027 Total Project Cost Improvements 500,000 500,000 - - - 1,000,000 Furniture/Fixture/Equip. - - - - - - Operational Impact - - - - - - Total Expenditures 500,000 500,000 - - - 1,000,000 1,000,000 Expenses From Prior Year(s): Funded from Prior Yr. Revenue: $0 Prior Year Activity on Project: FY 2022 Design of Brooks Bridge utility relocation plans FY 2021 FY 2020 FY 2019 FY 2018 FY FY FY FY FY Five Year Total Revenue Funding Summary: 2023 2024 2025 2026 2027 Total Revenue City Funding 300,000 300,000 600,000 Grant Funding - - - Debt Financing - Other Outside Funding - Revenue Enhancements - - - - - - Total Revenue Funding: 300,000 300,000 - - - 600,000 600,000 Strategy #1: Economic Diversification & Resiliency Insert Picture Here 201 City of Fort Walton Beach, Florida FY 2023 - 2027 Budget Capital Improvement Program (CIP) (For Projects/Equipment Costing Over $25,000 and Estimated Useful Life of Ten Years or Greater) Priority No. 1 Project Title: Sewer System Lining and Grouting Responsible Department: Utility Services Neighborhood/Loc Citywide Responsible Division: Sewer Collection & Treatment Project Manager: Daniel Payne Project Category: Infrastructure Project Type: Multi-Year Project Number: 5032 Estimated Useful Life (years): 25 Criteria Type: Improve Existing Svs/Infrastructure Projected Date of Completion: 09/30/23 Project Description/Justification: The City has 110 miles of sewer lines, with a majority of the lines consisting of clay pipe. Clay and unlined cast iron pipe are susceptible to root intrusion, offset joints and cracking due to the brittleness of the material. These problems allow a significant amount of inflow and infiltration and debris into the wastewater system, which can eventually result in stop-ups and possible sanitary sewer overflows. Prior to performing the rehabilitation, mains and manholes are inspected via closed-circuit television and monitored for leaks and other problems. The rehabilitation techniques include cured-in-place pipe lining, epoxy- or urethane-based manhole lining, and chemical root treatment. FY 2023 Segments to be determined based on video inspections and lift station data FY 2024 Segments to be determined based on video inspections and lift station data FY 2025 Segments to be determined based on video inspections and lift station data FY 2026 Segments to be determined based on video inspections and lift station data FY 2027 Segments to be determined based on video inspections and lift station data BUDGETED EXPENDITURE SCHEDULE FY FY FY FY FY Five Year Total Project Elements: 2023 2024 2025 2026 2027 Total Project Improvements 50,000 50,000 50,000 50,000 50,000 250,000 Furniture/Fixture/Equip. - - - - - - Operational Impact - Total Expenditures 50,000 50,000 50,000 50,000 50,000 250,000 250,000 Expenses From Prior Year(s): Funded from Prior Yr. Revenue: Prior Year Activity on Project: FY 2022 Sewer System Lining and Grouting FY 2021 Sewer System Lining and Grouting FY 2020 Sewer System Lining and Grouting FY 2019 Sewer System Lining and Grouting FY 2018 Sewer System Lining and Grouting FY FY FY FY FY Five Year Total Revenue Funding Summary: 2023 2024 2025 2026 2027 Total Revenue City Funding 50,000 50,000 50,000 50,000 50,000 250,000 Grant Funding - - - - - Debt Financing - - - - - - Other Outside Funding - - - - - - Revenue Enhancements - - - Total Revenue Funding: 50,000 50,000 50,000 50,000 50,000 250,000 250,000 Strategy #1: Safe and Livable Community for Citizens Insert Picture Here 202 City of Fort Walton Beach, Florida FY 2023 - 2027 Budget Capital Improvement Program (CIP) (For Projects/Equipment Costing Over $25,000 and Estimated Useful Life of Ten Years or Greater) Priority No. 1 Project Title: Brooks Bridge Replacement Sewer Relocations Responsible Department: Utility Services Neighborhood/Loc Citywide Responsible Division: Sewer Collection & Treatment Project Manager: Daniel Payne Project Category: Infrastructure Project Type: Multi-Year Project Number: 50XX Estimated Useful Life (years): 50 Criteria Type: Improve Existing Svs/Infrastructure Projected Date of Completion: 09/30/23 Project Description/Justification: As a part of the construction and replacemnt of Brooks Bridge, the existing City sanitary sewer facilities will have to be relocated. This results in the addition of new piping, 2 new lift stations, and other appurtenances. FY 2023 Brooks Bridge Sewer Relocations FY 2024 Brooks Bridge Sewer Relocations FY 2025 FY 2026 FY 2027 BUDGETED EXPENDITURE SCHEDULE FY FY FY FY FY Five Year Total Project Elements: 2023 2024 2025 2026 2027 Total Project Cost Improvements 750,000 750,000 1,500,000 Furniture/Fixture/Equip. - - - - - - Operational Impact - - - - - - Total Expenditures 750,000 750,000 - - - 1,500,000 1,500,000 Expenses From Prior Year(s): Funded from Prior Yr. Revenue: Prior Year Activity on Project: FY 2022 Design of Brooks Bridge utility relocation plans FY 2021 FY 2020 FY 2019 FY 2018 FY FY FY FY FY Five Year Total Revenue Funding Summary: 2023 2024 2025 2026 2027 Total Revenue City Funding 750,000 750,000 1,500,000 Grant Funding - - - - - Debt Financing - - - - - - Other Outside Funding - - - - - - Revenue Enhancements - - - Total Revenue Funding: 750,000 750,000 - - - 1,500,000 1,500,000 Strategy #1: Economic Diversification & Resiliency 203 Statistical Information HISTORY & PROFILE The City of Fort Walton Beach, Florida prides itself on being a small, family-oriented seaside community boasting a downtown area that was home to a significant prehistoric Native American community on the Gulf Coast of Northwest Florida. Situated at the junction of two major highways - US 98 (Miracle Strip Parkway) and SR 85 (Eglin Parkway) - Fort Walton Beach enjoys the benefits of its crossroads location along the coastal portion of the Northwest Florida

Download this text file with its original spacing ↓