READ ALONGSIDE THE SOURCE
Fort Walton Beach — Fiscal Year 2022-23 Adopted Budget — reading text
Part 72 of 85. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — ADID-130.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Crane truck
Water
2695 Heavy 401 1340 Distribution 2019 7/18/19 330 1116 Flat Bed Dump Body
2698 Light 401 1310 Water Ops 2019 8/27/19 387 3425 F-150
2711 Heavy 403 1360 Solid Waste 2020 4/12/20 1373 Side Loader
2712 Heavy 403 1360 Solid Waste 2020 5/11/20 Side Loader
2650 Heavy 405 1380 Stormwater 2016 9/28/16 3280 14029 Elgin Eagle Sweeper
2662 Heavy 405 1380 Stormwater 2017 4/3/17 740 5116
2688 Light 405 1380 Stormwater 2018 11/6/18 374 9123 DOC Van
Sewer
2690 Heavy 405 1350 Collections 2019 2/13/19 2146 8101 Vactor
2703 Heavy 405 1380 Stormwater 2020 11/4/19 328 742 F-350
2707 Heavy 405 1380 Stormwater 2020 2/12/20 340 Chevy Silverado
186
Capital Improvements Program
The City’s Capital Improvements Program (CIP) is a five-year planning and budgeting tool that
identifies the acquisition, construction, replacement, or renovation of facilities and infrastructure
with a value greater than $25,000 and a useful life of ten years or more. Capital expenditures may
be recurring (e.g. street resurfacing) or non-recurring (e.g. construction of a new park).
CIP PROCESS
The FY 2021-22 budget, the first year of the CIP, is the only year for which funding may legally
be appropriated. Future years’ funding requirements are identified, but are not authorized. The
CIP provides information on the current and long-range infrastructure needs of the City and
provides a mechanism for balancing needs and resources as well as setting priorities and schedules
for capital projects. Each project or program is assigned a four-digit CIP number so expenditures
can be easily tracked during the year and also across years.
Each year as part of the budget process, the list of projects is reviewed for relevance, need, cost,
and priority. The five-year CIP is revised annually based on the following parameters:
• Relevance to City Council priorities, and Federal or State
mandates Relevance to
Priorities,
Federal & State
Mandates
• Maintenance and preservation of current infrastructure
• Public health and safety Public Health &
Safety
• Operating budget impact
Preservation &
Maintenance
• Recreational, cultural or aesthetic value and Recreational
& Cultural Value
• Funding source
Each submission is reviewed on an annual basis and ranked in accordance with the above criteria.
Once prioritized, the funding source is identified and the project is placed in the budget if funding
is available.
The Enterprise Funds (Utilities, Sanitation, and Stormwater) are funded with user fees and do not
compete with other City projects for funding. The estimated project costs to be funded within the
CIP include all costs related to design, engineering, acquisition, construction, and project
management.
The City’s Strategic Plan Objectives are referenced throughout this document. Each CIP is
categorized by objective. In addition to the text, these objectives are highlighted through icons.
Please reference the Table of Contents for locations of more information regarding the City’s
Strategic Plan.
City of Fort Walton Beach, FL
187
Capital Improvements Program
Objective #1 – City Employees
In April 2022, City Council directed Staff to focus on City Employees moving forward.
Numerous employee incentives are included in the FY 2022-23 budget.
Objective #2 – Downtown Master Plan / Around the Mound Implementation
In Fall 2022, FDOT will award the contract for the PD&E phase of Around the Mound to
which the City has allocated up to $1 million as a match; the PD&E phase will take
approximately two years to complete; in FY 2021-22, the implementation of the Downton
Master Plan proceeded with the completion of an Infrastructure Master Plan and Library
Relocation Study.
Objective #3 – Expansion of City Recreation Amenities
In FY 2022-23, the design of the Preston Hood Athletic Complex Expansion will be
completed by January 1, 2023 with construction starting in April 2023.
Objective #4 – Public Safety
For FY 2022-23, new pay scales for Fire and Police Departments will be implemented to
allow the City to remain competitive for recruitment and retention of Firefighters and
Police Officers.
City of Fort Walton Beach, FL
188
Capital Improvements Program
PROJECTS BY STRATEGIC OBJECTIVE
Strategic Objective,
Downtown
Master/Plan Around
Strategic Objective,
the Mound
Public Safety, 39%
Implementation, 39%
Strategic Objective,
Expansion of City
Recreation Amenities,
22%
FINANCING ALTERNATIVES
Capital improvements may be funded by a variety of means depending on the nature of the project,
availability of funds, and the policies of City Council. Financing decisions are made based on
established City policies and available financing options directly related to project timing and
choice of revenue sources. The funding methodology for the CIP is reliant upon available
resources including funds from grants and user fees, useful life of the improvement, and sharing
the costs between current and future users. While some projects can be delayed until funds from
existing revenues are available, others cannot. The City explores all options such as ad valorem
taxes, grants, user fees, bonds, loans, and reserves to fund improvements. The following financing
sources are available to fund the CIP:
• Ad Valorem Taxes – The City rarely uses property taxes as a debt security due largely to the
required electoral approval (voter referendum) prior to issuance. Property taxes are directly
linked to the assessed value of individual property, not to the consumption of specific goods and
services (e.g. sales tax).
• Non-Ad Valorem Revenues – Non-ad valorem revenues can be pledged to support various types
of bond issues. Such bonds are similar to general obligation bonds in that proceeds are often
used for general government purposes and repayment is unrelated to the revenue generating
capacity of the project being financed. However, unlike general obligation bonds, non-ad
valorem revenue bonds are payable solely from revenues derived from the pledged revenue
(such as sales tax, local option fuel tax, and the guaranteed portion of municipal revenue
sharing).
City of Fort Walton Beach, FL
189
Capital Improvements Program
• Special Revenue Sources – Include the following:
• Impact Fees – Fees charged in advance of new development and designed to help pay for
infrastructure needs resulting from the new development. These fees may only be charged
to those who directly benefit from the new capital improvement and the fee must fairly
reflect the cost of the improvements (e.g. water and sewer impact fees).
• Special Assessments – Like impact fees, special assessments are levied against residents,
agencies, or districts that directly benefit from the new service or improvement (e.g.
sidewalks and street paving) and must be apportioned fairly.
• User Fees and Charges – These revenues include a variety of license and permit fees, facility
and program fees, and fines. They are rarely used as debt security for non-Enterprise Fund
capital projects, but could be a source of direct funding of a small capital improvement.
• Enterprise Fund User Fees – These revenues are derived from self-supporting business
enterprises - utilities, sanitation, and stormwater - which provide services in return for
compensation. The enterprise revenue used to secure debt is commonly termed “net-revenue”
consisting of gross revenues less operating costs.
• Note – A written, short-term promise to repay a specified amount of principal and interest on a
certain date, payable from a defined source of anticipated revenue. Usually notes mature in one
year or less. Rarely used by the City.
• Commercial Paper - Generally defined as short term, unsecured promissory notes issued by
organizations of recognized credit quality, usually a bank. Rarely used by the City.
• Bond – An issuer’s obligation to repay a principal amount on a certain date (maturity date) with
interest at a stated rate. Bonds are distinguishable from notes in that notes mature in a much
shorter time period.
• General Obligation Bonds – A bond secured by the full faith and credit of the City’s ad
valorem taxing power. These are rarely used in Florida, and by the City in particular, due
to the requirement for a voter referendum.
• Revenue Bonds – Bonds payable from a specific revenue source, not the full faith and
credit of an issuer’s taxing power and require no electoral approval. Pledged revenues are
often generated by the operation or project being financed (e.g. sales tax, water user fees,
golf user fees).
City of Fort Walton Beach, FL
190
CITY OF FORT WALTON BEACH, FL
Five Year Capital Improvements Program
FIVE YEAR
CIP Project Name FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27 TOTAL
TBD FWB PD Carport 50,000 - - -
