READ ALONGSIDE THE SOURCE
Fort Walton Beach — Fiscal Year 2022-23 Adopted Budget — reading text
Part 42 of 85. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — ADID-130.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
- 8,771 10,000 541-6402 Equipment - -100.00%
$ 13,489 $ - $ 8,771 $ 10,000 Total Capital Outlay $ - -100.00%
Capital Improvements Program:
182,865 - - - 5018 - Street Resurfacing - 0.00%
59,203 541-6351 Refer to CIP for specific locations - 0.00%
150,000 541-6310 5309 - Ferry Park Area Traffic Analysis 60,000 -60.00%
10,572 38,043 15,128 - 5306 - Sidewalk Construction - 0.00%
- - - 25,000 541-6310 5300 - Street Lighting Upgrading State Road Eglin Pkwy, - -100.00%
110
1240-Streets 8/28/2022 8:56 PM
001 GENERAL FUND - 1240 STREETS
Actual Budget
2021-22 2022-23 %
2018-19 2019-20 2020-21 Adopted Adopted Change
$ 193,437 $ 38,043 $ 74,331 $ 175,000 Total Capital Improvements Program $ 60,000 -65.71%
$ 784,938 $ 607,330 $ 643,747 $ 860,156 TOTAL EXPENSES $ 665,524 -22.63%
$ 317,968 $ 509,659 $ 604,214 $ 273,439 NET REVENUE / (EXPENSE) $ 499,536 82.69%
111
1240-Streets 8/28/2022 8:56 PM
STREETS Share of City Budget
DESCRIPTION $665,524,
1.1%
Streets maintains and resurfaces 100 miles of paved streets and maintains 61 miles of sidewalk in the City.
MISSION
Provide a safe and reliable transportation network by maintaining clean, safe, hazard-free roadways, and working to provide the highest
level of service to customers and motorist.
Actual YTD thru 03/31 Budget
CURRENT GOALS, OBJECTIVES, & METRICS (FY23) 2018-19 2019-20 2020-21 2021-22 2021-22 2022-23
Provide A Dependable Transportation Network
Pavement With Condition Index of 'Fair' or Better 96.1% 95.6% 96.5% annual measure 96.0% 96.0%
Streets With Sidewalks on At Least One Side 85.7% 85.7% 85.7% annual measure 86.0% 86.0%
Ensure Capital Projects are Completed On-Time & Within Budget
Capital Projects Completed On-Time 100% 100% 100% annual measure 100% 100%
Capital Projects Completed Within Budget 100% 100% 100% annual measure 100% 100%
Update the MicroPaver Pavement Condition Index for all City streets.
Maintain a safe transportation network within the City.
FUTURE GOALS (FY24 & FY25)
Have all streets maintained by the City with a Pavement Condition Index of 'fair' or better.
Repair all sidewalk hazards in existing neighborhoods.
Install segments of sidewalk identified in the five-year connectivity plan per City Strategic Plan.
Additional lighting and replacement lighting determined from prioritized list.
Update existing City traffic signals and cabinets.
PRIOR YEAR ACCOMPLISHMENTS (FY22)
Resurfaced Golf Course Drive from (South) Fairway Avenue to (North) Fairway Avenue.
Resurfaced Fairway Avenue from Mooney Road to Wedgewood Lane.
Resurfaced Powell Drive from (South) Fairway Avenue to Eagle Street.
Installed new sidewalk on Lake Drive from Memorial Parkway to 321 Lake Drive.
Installed new sidewalk on Hollywood Boulevard NW from the North side of right-of-way from West property line of 6 Beal Parkway NW to
Beal Parkway NW.
Installed new sidewalk on Walter Martin Road from the North side of right-of-way from Beal Parkway NE to West property line of 100
Eglin Parkway NE.
Installed new sidewalk on First Street SW from the North side of right-of-way from Robinwood Drive SW to St Mary Avenue SW then to
the South driveway of 119 St Mary Avenue SW.
Installed new sidewalk on Alder Avenue SE from the West side of right-of-way from South property line of 14 Alder Avenue SE to Fourth
Street SE.
Installed new sidewalk on Memorial Parkway NW from the East side of right-of-way from Holmes Boulevard NW to Hollywood Boulevard
NW.
112
001 GENERAL FUND - 1498 TDC TAX
Actual Budget
2021-22 2022-23 %
2018-19 2019-20 2020-21 Adopted Adopted Change
Revenues
- - - - TDC Tax 932,500 100.00%
- - - - 366-3100 Current FY TDC Tax
$ - $ - $ - $ - Total Revenue $ 932,500 100.00%
Operational Expenditures
Recreational 100,000 100.00%
- - - - Preston Hood Complex Annual Maintenance
Capital Projects
- - - - Recreational 355,000 100.00%
Preston Hood Complex Expansion - Debt Srvc
Arts & Culture Strategic Plan Implementation
Preston Hood Batting Cage Structure
- - - - CRA 477,500 100.00%
Branding & Wayfinding
Landing Improvements
Liza Jackson Waterfront Park Design
Heritage Park & Cultural Center Addition
$ - $ - $ - $ - Total Capital Expenditures $ 932,500 100.00%
$ - $ - $ - $ - TOTAL EXPENSES $ 932,500 100.00%
$ - $ - $ - $ - NET REVENUE / (EXPENSE) $ - 0.00%
1498-TDD Tax _001 8/29/2022 4:32 PM 113
001 GENERAL FUND - 1499 1/2 CENT SALES TAX
Actual Budget
2021-22 2022-23 %
2018-19 2019-20 2020-21 Adopted Adopted Change
Revenues
- 2,016,085 2,433,848 1,130,000 1/2 Cent Sales Tax 795,000 -29.65%
- - - - 335-1800 Current FY 1/2 Cent Sales Tax
$ - $ 2,016,085 $ 2,433,848 $ 1,130,000 Total Revenue $ 795,000 -29.65%
Capital Projects
- - 10,740 120,000 Recreational 195,000 62.50%
572-6310 Preston Hood Batting Cage Structure
- 778,149 44,139 200,000 Fire Safety - -100.00%
18,000 159,938 131,687 35,000 Police Safety 50,000 42.86%
521-6310 FWBPD Carport
- - - - Commerce & Technology Park Master Plan - 0.00%
- 732,112 261,156 775,000 Infrastructure 550,000 -29.03%
541-6351 General Street Resurfacing
541-6351 Sidewalk Improvements
$ 18,000 $ 1,670,199 $ 447,721
